Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 984 ]
|
Management of media channel and signal connections
|
ZTE Corporation
|
Q14/15, Q12/15, Q11/15
|
2014-11-10 |
|
[ 983 ]
|
G.993.2, G.fast: Using G.fast in cabinet deployment - reaching VDSL/30b performance over G.fast
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2014-11-10 |
|
[ 982 ]
|
Proposal of G.989.3 Annex H - PtP WDM Transmission Convergence Layer
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-11-10 |
|
[ 981 ]
|
Inconsistency between B100G Working Assumptions re Minimum bit rate per OTSi
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2014-11-10 |
|
[ 980 ]
|
"G.989.3 Clause 18 NG-PON2 Protection"
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2014-11-10 |
|
[ 979 ]
|
Proposal of G.989.3 Annex on "Transcoded Framing with FEC and OAM for PtP WDM TC"
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-11-10 |
|
[ 978 ]
|
Proposed update and alignment of Recommendations G.870, G.709, G.798, G.872, and G.874
|
Alcatel-Lucent USA Inc.
|
Q6/15, Q3/15, Q14/15, Q12/15, Q11/15
|
2014-11-10 |
|
[ 977 ]
|
Refinement of Tributary Slot Working Assumptions for B100G
|
Alcatel-Lucent USA Inc.
,
Inphi Corporation
,
PMC-Sierra, Inc.
|
Q11/15
|
2014-11-10 |
|
[ 976 ]
|
PRBS31 Test Pattern for OTN
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2014-11-10 |
|
[ 975 ]
|
Proposed text for Expected Defect Process in G.8021
|
NEC Corporation
|
Q10/15
|
2014-11-10 |
|
[ 974 ]
|
Referencing method of MEF documents in G.8011v4
|
NEC Corporation
|
Q10/15
|
2014-11-10 |
|
[ 973 ]
|
Requirements for PTP option for T-TC timing characteristics.
|
NEC Corporation
,
Orange
|
Q13/15
|
2014-11-10 |
|
[ 972 ]
|
G.8031/Y.1342 - 1:1 Unidirectional Ethernet Protection Switching to Support Dual parenting PON Protection
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-11-10 |
|
[ 971 ]
|
ODU SMP High Order Signalling Option
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2014-11-10 |
|
[ 970 ]
|
Market Drivers and Timing for B100G OTN Standardization and IaDI Considerations
|
Alcatel-Lucent USA Inc.
,
Coriant GmbH & Co. KG
,
Telefon AB - LM Ericsson
,
ZTE Corporation
|
Q11/15
|
2014-11-10 |
|
[ 969 ]
|
Simplified analytical approach for modelling of WDM Systems to be considered as the way forward to develop a specification method for Situation 2 in G.680 - Rev. 1
|
Italy
|
Q6/15
|
2014-11-10 |
|
[ 968 ]
|
Fibre cut-off wavelength measurements performed on commercial bend insensitive fibres
|
Telecom Italia S.p.A.
|
Q5/15
|
2014-11-10 |
|
[ 967 ]
|
Appendix to Recommendation L.82, "A new multifibre riser cable structure for Ftth Mdu building cabling: the Italian experience"
|
Italy
|
Q16/15
|
2014-11-10 |
|
[ 966 ]
|
Proposal to specify the EVM related parameters of 100G transmitters in G.698.2
|
China Unicom
,
Deutsche Telekom AG Standardization
,
EXFO Inc.
,
FiberHome Technologies Group
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q6/15
|
2014-11-10 |
|
[ 965 ]
|
Next generation Outside Plant Fibre
|
OFS Fitel, LLC
|
Q5/15
|
2014-11-10 |
|
[ 964 ]
|
Example of Link Design Attenuation at 1550 nm
|
OFS Fitel, LLC
|
Q6/15, Q5/15
|
2014-11-10 |
|
[ 963 ]
|
Comparison of measured Chromatic dispersion for G.652.D and G.657.A Fibres
|
OFS Fitel, LLC
|
Q6/15, Q5/15
|
2014-11-10 |
|
[ 962 ]
|
A possible next stage of TWDM PON: 100G-PON
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-11-10 |
|
[ 961 ]
|
Proposed input to G.cca
|
Alcatel-Lucent USA Inc.
|
Q14/15, Q12/15
|
2014-11-10 |
|
[ 960 ]
|
Revision of Clauses 7 and 8 in the draft G Suppl. RoF
|
National Institute of Information and Communications Technology
|
Q2/15
|
2014-11-10 |
|
[ 959 ]
|
Proposal for G.cca outline
|
Alcatel-Lucent USA Inc.
|
Q14/15, Q12/15
|
2014-11-10 |
|
[ 958 ]
|
Variable temperature test of G.8273
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-11-10 |
|
[ 957 ]
|
T-BC High-Frequency Noise (Jitter) Generation Results Based on Multiple Replications of Simulations
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-11-10 |
|
[ 956 ]
|
SyncE transient test of G.8273
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-11-10 |
|
[ 955 ]
|
Proposal of Cs-GNSS Ensembler clock
|
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-11-10 |
|
[ 954 ]
|
Proposal for G.8273.2
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-11-10 |
|
[ 953 ]
|
Noise transfer test of G.8273.2
|
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-11-10 |
|
[ 952 ]
|
Measurement accuracy of PRTC
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-11-10 |
|
[ 951 ]
|
High-Level Time Synchronization Functional Model based on Media-Independent and Media-Dependent Layers
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-11-10 |
|
[ 950 ]
|
G.vdsl: Technical proposals for enhanced data rate and co-existence with vectored Profiles 17a
|
China Unicom
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q4/15
|
2014-11-10 |
|
[ 949 ]
|
G.vdsl: Requirements for enhanced data rate and co-existence with vectored Profiles 17a
|
China Unicom
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q4/15
|
2014-11-10 |
|
[ 948 ]
|
Status Summary for ODU SMP Protocols
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-11-10 |
|
[ 947 ]
|
Proposed Text for G.odusmp
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-11-10 |
|
[ 946 ]
|
Proposal for studying node elements in optical fibre infrastructure management systems
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q16/15
|
2014-11-10 |
|
[ 945 ]
|
Withdrawn
Reposted as TD107/WP2, "Correspondence summary of the new study item regarding the node elements in optical fibre infrastructure management systems"
|
N/A
|
|
2014-11-10 |
|
[ 944 ]
|
OpenFlow over OMCI
|
Huawei Technologies Co. Ltd.
|
Q2/15
|
2014-11-10 |
|
[ 943 ]
|
High level description of a protection solution using dual parented type B (TDM/TDMA) PON
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-11-10 |
|
[ 942 ]
|
ODU SMP 1-Stage Protocol
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2014-11-10 |
|
[ 941 ]
|
Multi-frame Calculation for ODU SMP Proposal
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-11-10 |
|
[ 940 ]
|
Wavelength channel information refreshing of TWDM-PON ONU
|
Huawei Technologies Co. Ltd.
,
ETRI
|
Q2/15
|
2014-11-10 |
|
[ 939 ]
|
G.hn: Proposed corrigenda to NDIM
|
Huawei Technologies Co. Ltd.
|
Q18/15
|
2014-11-10 |
|
[ 938 ]
|
Proposed DNI solution for Ethernet linear protection in G.mdsp
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-11-10 |
|
[ 937 ]
|
Implementation of protection with ONU wavelength tuning
|
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q2/15
|
2014-11-10 |
|
[ 936 ]
|
Proposal for power saving by tuning
|
China Unicom
,
ZTE Corporation
|
Q2/15
|
2014-11-10 |
|
[ 935 ]
|
G.vector, G.vdsl, G.adsl: Common Mode Emissions of CPE and their impact on Vectored Lines Performance
|
Deutsche Telekom AG Standardization
|
Q4/15
|
2014-11-10 |
Results:382 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):