International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2014-03-24 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2014-03-24) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2014-03-24 to 2014-04-04

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2013-12-06  2013-07-01  2013-02-01 

Results:337 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 777 ]  
 
Withdrawn by submitter     N/A     2014-03-12
[ 776 ]  
 
Proposed revision to G.984.5.2     Calix Networks, Inc. , Telecom Italia S.p.A.   Q2/15   2014-03-11
[ 775 ]  
(Rev.1) 
G.fast: BT TAP comments on G.9700 (ex G.fast-PSD)     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 774 ]  
 
Parameterization of L2.1 multi-step entry procedure     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2014-03-11
[ 773 ]  
 
G.997.1: On extending G.997.1 to support PMA functionality     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 772 ]  
 
G.fast: On Reverse Power Feeding system noise requirements     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 771 ]  
 
Document describing migration from other PTP profiles to G.8275.1     Nokia Solutions and Networks Gmbh & Co. KG   Q13/15   2014-03-11
[ 770 ]  
 
Updates to G.8263 Testing     Nokia Solutions and Networks Gmbh & Co. KG   Q13/15   2014-03-11
[ 769 ]  
 
Proposed revisions to G.989.2 LC document     British Telecommunications Public Ltd. Co. (BT Plc) , Calix Networks, Inc. , Telecom Italia S.p.A.   Q2/15   2014-03-11
[ 768 ]  
 
Neighbour Discovery for Ethernet     Coriant GmbH & Co. KG   Q14/15   2014-03-11
[ 767 ]  
 
G.vdsl2, G.inp: Stability issues and mitigation of non-stationary noise in LPM     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2014-03-11
[ 766 ]  
 
G.fast: Additional requirements to address specifics of RPF noise     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2014-03-11
[ 765 ]  
 
Out-of-Band protocol used to report OPS and OCh status     Coriant GmbH & Co. KG   Q14/15   2014-03-11
[ 764 ]  
 
G.vdsl: New 998ADE17 Band Plan for VDSL2     China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-03-11
[ 763 ]  
 
G.fast: Means for Transmission of Sync Symbols and RMC Symbols in L2.2     Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-03-11
[ 762 ]  
 
G.fast: On TIGA and SRA     Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-03-11
[ 761 ]  
 
Proposed model for the OTUCn and OTSi layers for OTN beyond 100G     ZTE Corporation   Q12/15, Q11/15   2014-03-11
[ 760 ]  
 
Considerations on the timing of the OTN B100G amendment for G.709     China Telecommunications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q12/15, Q11/15   2014-03-11
[ 759 ]  
 
Access budget within E2E Time/phase HRM     British Telecommunications Public Ltd. Co. (BT Plc)   Q13/15   2014-03-11
[ 758 ]  
 
Prysmian Group view on revision of Recs. G.652 and G.657     Prysmian SpA   Q6/15, Q5/15   2014-03-11
[ 757 ]  
 
Updated draft of recommendation for "Field Mountable optical fibre Connector"     Telecom Italia S.p.A. , Tyco Electronics Raychem bvba   Q7/15   2014-03-11
[ 756 ]  
 
Proposal of a new study item: "Plant solutions for FTTdp (Fiber To The distribution point) architecture"     Italy   Q4/15, Q16/15   2014-03-11
[ 755 ]  
 
Simplified analytical approach for modelling of WDM Systems to be considered as the way forward to develop a specification method for Situation 2 in G.680     Italy   Q6/15   2014-03-11
[ 754 ]  
 
Monitoring models for G.8031 protected domain with DNI to support two failures in G.mdsp     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2014-03-11
[ 753 ]  
 
Isolation specifications for G.984.5 Revised     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2014-03-11
Results:337 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-9-26