Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 140 ]
|
Probe Sequence Modulation and Error Signal Feedback
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2013-06-16 |
|
[ 139 ]
|
On PSD Control in Vectoring
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2013-06-16 |
|
[ 138 ]
|
Asynchronous OLR for PSD Control
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2013-06-16 |
|
[ 137 ]
|
Updated PtP WDM channel plan
|
ADVA Optical Networking
,
Nokia Siemens Networks GmbH & Co. KG
|
Q2/15
|
2013-06-16 |
|
[ 136 ]
|
Figure update for Appendix VI
|
ADVA Optical Networking
,
Nokia Siemens Networks GmbH & Co. KG
|
Q2/15
|
2013-06-16 |
|
[ 135 ]
|
Raman OPP for PtP WDM
|
ADVA Optical Networking
,
Nokia Siemens Networks GmbH & Co. KG
|
Q2/15
|
2013-06-16 |
|
[ 134 ]
|
PMD values for PtP WDM
|
ADVA Optical Networking
,
Nokia Siemens Networks GmbH & Co. KG
|
Q2/15
|
2013-06-16 |
|
[ 133 ]
|
Eye mask parameters for PtP WDM
|
ADVA Optical Networking
,
Nokia Siemens Networks GmbH & Co. KG
|
Q2/15
|
2013-06-16 |
|
[ 132 ]
|
G.bond: Shutting down some lines in a bonded group
|
AT&T, Inc.
|
Q4/15
|
2013-06-15 |
|
[ 131 ]
|
Full capacity in NG-PON2 using line coding
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2013-06-15 |
|
[ 130 ]
|
Proposal to study AWG based WDM PON proposal in mobile front-haul application
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2013-06-15 |
|
[ 129 ]
|
On the editorial placement of NG-PON2 (TWDM) TC-layer specifications
|
Alcatel-Lucent USA Inc.
,
Futurewei Technologies US R&D Center
|
Q2/15
|
2013-06-15 |
|
[ 128 ]
|
On the concept of out-of-band ranging in TWDM PONs
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2013-06-15 |
|
[ 127 ]
|
Impacts of line code change on G.989.2
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2013-06-15 |
|
[ 126 ]
|
Proposed approach for work on OTN beyond 100G
|
ZTE Corporation
|
Q6/15, Q14/15, Q12/15, Q11/15
|
2013-06-15 |
|
[ 125 ]
|
Proposed model for the OTUCn and OCh layer for OTN beyond 100G
|
China Telecommunications Corporation
,
China Unicom
,
ZTE Corporation
|
Q6/15, Q14/15, Q12/15, Q11/15
|
2013-06-15 |
|
[ 124 ]
|
G.8275.1: Title
|
SymmetriCom, Inc.
|
Q13/15
|
2013-06-15 |
|
[ 123 ]
|
G.8275.1: Default Parameter Values
|
SymmetriCom, Inc.
|
Q13/15
|
2013-06-15 |
|
[ 122 ]
|
G.8272: Revisions to Appendix 1 to include the case of a combined PRTC/T-GM
|
SymmetriCom, Inc.
|
Q13/15
|
2013-06-15 |
|
[ 121 ]
|
G.8263: Modification to Proposed Testing Appendix
|
SymmetriCom, Inc.
|
Q13/15
|
2013-06-15 |
|
[ 120 ]
|
G.8260: The Use of Exceptions for Network Limits using FPP
|
SymmetriCom, Inc.
|
Q13/15
|
2013-06-15 |
|
[ 119 ]
|
Percentile Average Clarification in G.8260
|
SymmetriCom, Inc.
|
Q13/15
|
2013-06-15 |
|
[ 118 ]
|
FPP and Percentile of Live Network PDV
|
SymmetriCom, Inc.
|
Q13/15
|
2013-06-15 |
|
[ 117 ]
|
G.poc draft proposal
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2013-06-15 |
|
[ 116 ]
|
Proposal to replace NG-PON2 channel plan in Appendix VII of G.989.2 draft
|
ADVA Optical Networking
,
Futurewei Technologies US R&D Center
,
Gemfire Europe Limited
|
Q2/15
|
2013-06-15 |
|
[ 115 ]
|
Multiple rate TC extension for TWDM
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2013-06-15 |
|
[ 114 ]
|
OFS Proposal for revisions to 657
|
OFS Fitel, LLC
|
Q5/15
|
2013-06-14 |
|
[ 113 ]
|
OFS Proposal for revisions to 652.D
|
OFS Fitel, LLC
|
Q5/15
|
2013-06-14 |
|
[ 112 ]
(Rev.1) |
OFS Proposal for a new G.654 Category
|
OFS Fitel, LLC
|
Q5/15
|
2013-06-14 |
|
[ 111 ]
|
Criteria for evaluating ODU SMP protocol proposals
|
Tellabs Oy
|
Q9/15
|
2013-06-14 |
|
[ 110 ]
|
OTN Sec : Security for OTN beyond 100 Gbit/s
|
Applied Micro Circuits Corporation (AMCC)
|
Q11/15
|
2013-06-14 |
|
[ 109 ]
|
G.975.1 Appendix I.4 corrections
|
Applied Micro Circuits Corporation (AMCC)
|
Q8/15
|
2013-06-14 |
|
[ 108 ]
|
G.fast: SOS-like Scheme as Fast OLR
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2013-06-14 |
|
[ 107 ]
|
G.fast: Transmitter Initiated Gain and Bit-Loading Adjustment
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2013-06-14 |
|
[ 106 ]
|
G.fast: Configuration of Gap Time Parameter Tg2
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2013-06-14 |
|
[ 105 ]
|
G.vdsl: Low Power Mode proposal and working text
|
TQ DELTA. LLC
|
Q4/15
|
2013-06-14 |
|
[ 104 ]
(Rev.1) |
G.vector, G.hs: Potential Ghost Start Issue in G.vector
|
Ikanos Communications
|
Q4/15
|
2013-06-14 |
|
[ 103 ]
|
Proposed Revisions to the Current G.mdsp Draft
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2013-06-14 |
|
[ 102 ]
|
G.fast: Maximum aggregate transmit power
|
Deutsche Telekom AG
,
Swisscom SA
|
Q4/15
|
2013-06-14 |
|
[ 101 ]
|
G.metro scope proposal
|
ADVA Optical Networking
,
China Unicom
,
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
,
Italy
,
Nokia Siemens Networks GmbH & Co. KG
,
Telefon AB - LM Ericsson
|
Q6/15
|
2013-06-14 |
|
[ 100 ]
|
G.hn: Backup security controller mechanism
|
Huawei Technologies Co. Ltd.
|
Q18/15
|
2013-06-14 |
|
[ 99 ]
|
G.hn: Improving the existing domain merging procedure
|
Huawei Technologies Co. Ltd.
|
Q18/15
|
2013-06-14 |
|
[ 98 ]
|
Considerations on flexible ODU and OTU overhead [SP7]
|
Fujitsu Limited
|
Q11/15
|
2013-06-14 |
|
[ 97 ]
|
Comparisons between single and multi OTUCm/OCh signal approaches [SP4, SP5]
|
Fujitsu Limited
|
Q11/15
|
2013-06-14 |
|
[ 96 ]
|
Considerations on B100G OTN multiplexing hierarchy [SP23]
|
Fujitsu Limited
|
Q11/15
|
2013-06-14 |
|
[ 95 ]
(Rev.1) |
Consideration on B100G OTN multiplexing
|
Fujitsu Limited
|
Q11/15
|
2013-06-14 |
|
[ 94 ]
|
Comments and proposal on the restructuring of G.652 & G.657 categories
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2013-06-14 |
|
[ 93 ]
|
Consideration on 400GE signal transmission over B100G OTN
|
Fujitsu Limited
|
Q11/15
|
2013-06-14 |
|
[ 92 ]
|
Proposal for starting the procedure of the new Recommendation about micro-ducts technology and its application in the access network.
|
Italy
|
Q16/15
|
2013-06-14 |
|
[ 91 ]
|
Beginning Of Life ("BOL") versus End-Of-Life ("EOL") approach in the specification of passive optical components.
|
Italy
|
Q7/15, Q2/15, Q16/15
|
2013-06-14 |
Results:440 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):