International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2013-07-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2013-07-01) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Results:440 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 415 ]  
 
2013-06-18 TELEKOMUNIKACJA POLSKA S.A.   Proposal to continue security of optical infrastructure considerations     Q17/15  
[ 414 ]  
 
2013-06-18 Nippon Telegraph and Telephone Corporation (NTT)   Inputs on procedures for transport SDN discussion     Q14/15, Q12/15  
[ 413 ]  
 
2013-06-18 British Telecommunications Public Ltd. Co. (BT Plc)   [FAST] Low Power Mode Requirements for G.FAST     Q4/15  
[ 412 ]  
 
2013-06-18 Orange   Way forward on PDV network limits in G.8261.1     Q13/15  
[ 411 ]  
 
2013-06-18 Orange   Updated text for the new Appendix "Evaluation of the Packet Delay Variation generation and asymmetry in a network node" in G.8261.1     Q13/15  
[ 410 ]  
 
2013-06-18 Lantiq Beteiligungs-GmbH & Co. KG   G.fast: OLR procedures during G.fast initialization     Q4/15  
[ 409 ]  
 
2013-06-18 Orange   PTP attributes values in G.8275.1     Q13/15  
[ 408 ]  
 
2013-06-18 Orange   Text for Annex A of G.8275.1     Q13/15  
[ 407 ]  
 
2013-06-18 Orange   Phase/time network limits in G.8271.1     Q13/15  
[ 406 ]  
 
2013-06-18 Alcatel-Lucent Bell N.V.   G.fast: DRA primitives and interface requirements at the gamma reference point     Q4/15  
[ 405 ]  
 
2013-06-18 Alcatel-Lucent Bell N.V.   G.fast: Energy Efficiency-performance trade-offs     Q4/15  
[ 404 ]  
 
2013-06-18 Alcatel-Lucent Bell N.V.   G.fast: Vectoring Backchannel Encapsulation     Q4/15  
[ 403 ]  
 
2013-06-18 Deutsche Telekom AG   Requirements for passive Metro DWDM interfaces     Q6/15, Q11/15  
[ 402 ]  
 
2013-06-18 Nippon Telegraph and Telephone Corporation (NTT)   Requirements for Beyond 100G OTN     Q11/15  
[ 401 ]  
 
2013-06-18 Deutsche Telekom AG   Application scenarios using new Metro DWDM interfaces     Q6/15, Q11/15  
[ 400 ]  
 
2013-06-18 FiberHome Technologies Group   The difference of the trib and line side between the existing OTN and B100G OTN     Q11/15  
[ 399 ]  
 
2013-06-18 China Unicom , FiberHome Technologies Group   The requirement of optical overhead extend at IrDI     Q11/15  
[ 398 ]  
 
2013-06-18 Alcatel-Lucent Bell N.V.   G.fast: On Line Reconfiguration for Precoder Gain Scaling: working text figures     Q4/15  
[ 397 ]  
 
2013-06-18 China Mobile Communications Corporation , FiberHome Technologies Group   The discussion about OTM- n.m IaDI interface of B100G     Q11/15  
[ 396 ]  
 
2013-06-18 China Mobile Communications Corporation , China Mobile Communications Corporation   The suggestion about OTM-0.mvn IrDI interface of B100G     Q11/15  
[ 395 ]  
 
2013-06-18 Telecom Italia S.p.A.   Support for Ethernet linear protection solutions applicable to DNI scenarios     Q9/15  
[ 394 ]  
 
2013-06-18 FiberHome Technologies Group   Selection of protection transport entities in m1 SMP architecture     Q9/15  
[ 393 ]  
 
2013-06-18 FiberHome Technologies Group   Editorial suggestions for G.8131.1     Q9/15  
[ 392 ]  
 
2013-06-18 Telecom Italia S.p.A.   G.mdsp proposed new network objectives     Q9/15  
[ 391 ]  
 
2013-06-18 Alcatel-Lucent USA Inc.   Version of ring APS PDUs in Y.1731 and editorial comments on Y.1731     Q10/15  
[ 390 ]  
 
2013-06-18 FiberHome Technologies Group   Definition for Broadcast Bridge in G.8131.1     Q9/15  
[ 389 ]  
(Rev.1) 
2013-06-18 FiberHome Technologies Group   Use cases for transport SDN     Q14/15, Q12/15  
[ 388 ]  
(Rev.1) 
2013-06-18 Alcatel-Lucent USA Inc.   Forwarding behaviour for OAM frames at MIPs in G.8021     Q9/15  
[ 387 ]  
 
2013-06-18 Alcatel-Lucent USA Inc.   Validating assumptions made in the context of MECP     Q9/15  
[ 386 ]  
 
2013-06-18 Deutsche Telekom AG   Mapping specification of single channel OTU3 and OTU4 using coherent techniques     Q6/15, Q11/15  
[ 385 ]  
 
2013-06-18 Deutsche Telekom AG   Strong FEC for OTU4 and Beyond 100G     Q6/15, Q11/15  
[ 384 ]  
(Rev.1) 
2013-06-18 British Telecommunications Public Ltd. Co. (BT Plc)   Type B PON Dual Parenting Restoration Solution     Q2/15  
[ 383 ]  
 
2013-06-18 Electronics and Telecommunications Research Institute (ETRI)   Proposal to cross-connection release signal of 2-stage ODU SMP protocol     Q9/15  
[ 382 ]  
 
2013-06-18 Calnex Solutions Limited , RAD Data Communications, Ltd.   FPP metric informal correspondence - Summary, further results and proposal for Study Point 3     Q13/15  
[ 381 ]  
 
2013-06-18 Calnex Solutions Limited , RAD Data Communications, Ltd.   FPP metric informal correspondence - Summary and proposal for Study Point 1     Q13/15  
[ 380 ]  
 
2013-06-18 Calnex Solutions Limited , RAD Data Communications, Ltd.   FPP metric informal correspondence - Summary and proposal on the Agreements     Q13/15  
[ 379 ]  
 
2013-06-18 Alcatel-Lucent Deutschland AG   Comments to Finisar proposal for a new 100G code 4L1-9D1F in G.959.1     Q6/15  
[ 378 ]  
 
2013-06-18 Sckipio Technologies S.I. Ltd.   G.fast: Alternative samples report by FTU-R for downstream crosstalk estimation     Q4/15  
[ 377 ]  
 
2013-06-18 ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc)   Requirements for passive metro WDM systems     Q6/15  
[ 376 ]  
 
2013-06-18 Sigma Designs Israel S.D.I Ltd.   A.5 justification information for the new proposed ITU-T Recommendation referencing IEEE 1905.1     Q18/15  
[ 375 ]  
 
2013-06-18 Lantiq Beteiligungs-GmbH & Co. KG   G.vdsl2, G.inp: Considerations related to VDSL2 low power mode     Q4/15  
[ 374 ]  
 
2013-06-18 Sigma Designs Israel S.D.I Ltd.   G.wnb: Editorial changes to SAR adaptation layer of G.9959     Q15/15  
[ 373 ]  
 
2013-06-18 Lantiq Beteiligungs-GmbH & Co. KG   G.993.5: Initialization using extended O-P-VECTOR 1     Q4/15  
[ 372 ]  
 
2013-06-18 Sigma Designs Israel S.D.I Ltd.   G.wnb: Editorial changes to Logical Link Layer (LLC) of G.9959     Q15/15  
[ 371 ]  
 
2013-06-18 Sigma Designs Israel S.D.I Ltd.   G.wnb: PHY: Relaxation of tolerance on TX separation     Q15/15  
[ 370 ]  
 
2013-06-18 Electronics and Telecommunications Research Institute (ETRI)   Utilizing G.8031 APS protocol for per-leaf protection in MECP     Q9/15  
[ 369 ]  
 
2013-06-18 Electronics and Telecommunications Research Institute (ETRI)   Propose to modify network objectives for G.mdsp     Q9/15  
[ 368 ]  
 
2013-06-18 Sigma Designs Israel S.D.I Ltd. , TangoTec   Proposal for a new Recommendation for "Convergent Digital Home Network for Heterogeneous Technologies"  
Withdrawn
 
Q18/15  
[ 367 ]  
 
2013-06-18 Sigma Designs Israel S.D.I Ltd.   G.hn: Proposal for an amendment to G.9961 to facilitate metrics acquisition between G.hn nodes     Q18/15  
[ 366 ]  
 
2013-06-18 Sigma Designs Israel S.D.I Ltd.   G.hn: IPR Statement of Sigma Designs Israel     Q18/15  
Results:440 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-9-30