Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 795 ]
(Rev.1) |
The 3rd draft of K.prox "Immunity requirements for telecommunication equipment in close proximity"
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/5
|
2016-09-26 |
|
[ 794 ]
(Rev.1) |
Proposed Draft of New Recommendation K. e_faci "EMC requirements for electrical systems in telecommunication facilities"
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/5
|
2016-09-26 |
|
[ 793 ]
|
Revision of the Recommendation K.52
|
ORANGE POLSKA S.A.
|
Q7/5
|
2016-09-26 |
|
[ 792 ]
(Rev.1) |
Proposed baseline text for ITU-T L.1410 (12/2014) Supplement "Example of LCA of the aggregated second order effects of selected ICT services"
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q18/5
|
2016-09-26 |
|
[ 791 ]
|
Proposal for Recommendation ITU-T L.GSNI - High efficiency power feeding solutions, energy saving cooling solutions and free cooling solutions
|
Ministry of Industry and Information Technology (MIIT)
|
Q17/5
|
2016-09-26 |
|
[ 790 ]
|
Proposed study on safety of surge voltage on telecommunication line through bridging SPD
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q4/5
|
2016-09-26 |
|
[ 789 ]
|
Proposal of an Editorial Revision of the draft "Supplement on Agriculture Adaptation to the effects of climate change using ICT's"
|
Fujitsu Limited
|
Q15/5
|
2016-09-26 |
|
[ 788 ]
|
Proposal of an Editorial Revision of the draft new Recommendation ITU-T L.ICT and adaptation of agriculture
|
Fujitsu Limited
|
Q15/5
|
2016-09-26 |
|
[ 787 ]
(Rev.1) |
Gas discharge tube with safety failure function-protection against interference
|
China Telecommunications Corporation
|
Q2/5
|
2016-09-26 |
|
[ 786 ]
(Rev.1) |
The 2nd draft of K.vss "Lightning protection and Earthing of Video Surveillance System"
|
China Telecommunications Corporation
|
Q5/5
|
2016-09-26 |
|
[ 785 ]
(Rev.1) |
The proposal of new work item K.rcd "Technical requirements for Residual Current operated Device(RCD) with automatic re-closing device
|
China Telecommunications Corporation
|
Q5/5, Q2/5
|
2016-09-26 |
|
[ 784 ]
(Rev.1) |
Comments on the fourth draft of ITU-T K.env
|
Telefónica S.A.
,
Telstra Corporation Ltd.
|
Q7/5
|
2016-09-26 |
|
[ 783 ]
(Rev.1) |
Resistibility of CPE Ethernet port
|
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
|
Q4/5
|
2016-09-25 |
|
[ 782 ]
|
The 2nd draft of Recommendation ITU-T K.idc "Dangerous effects and protective measures against electromagnetic disturbances when internet data centre is co-sited with high-voltage substation"
|
Huawei Technologies Co., Ltd.
|
Q3/5
|
2016-09-24 |
|
[ 781 ]
(Rev.1) |
Proposal of a new recommendation on "Circuit architectures inside multiple AC or up to 400 VDC input ICT equipment"
|
Huawei Technologies Co., Ltd.
|
Q19/5
|
2016-09-24 |
|
[ 780 ]
|
The Appendix I of K.lem"Lightning Protection and Earthing of Miniature Wireless Base Station"
|
Huawei Technologies Co., Ltd.
|
Q5/5
|
2016-09-24 |
|
[ 779 ]
(Rev.1) |
Draft new Recommendation ITU-T K.wire-line_emc - work frame
|
Huawei Technologies Co., Ltd.
|
Q9/5
|
2016-09-24 |
|
[ 778 ]
|
A Proposal for New Work Item on "Framework of climate change risk assessment for electrical facility"
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q15/5
|
2016-09-23 |
|
[ 777 ]
|
A Survey on Climate Change Risk Assessment Methods for Electrical Facility
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q15/5
|
2016-09-23 |
|
[ 776 ]
|
General considerations of Lithium ion battery for L.ENST2battery
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q19/5
|
2016-09-23 |
|
[ 775 ]
(Rev.1-3) |
The measurement example of radiated disturbance over 300 MHz from lighting equipment
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/5
|
2016-09-20 |
|
[ 774 ]
(Rev.1-3) |
The 1st draft of K.light "EMC requirements of disturbances from lighting equipment located in the telecommunication equipment room"
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/5
|
2016-09-20 |
|
[ 773 ]
(Rev.1) |
Proposed revision in K.44/21 for common mode lightning surge test on internal coaxial port of telecommunication equipment installed in customer premises
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q4/5
|
2016-09-20 |
|
[ 772 ]
(Rev.1) |
Supplement to K.115 "Measuring shielding effectiveness using normalized site attenuation in free space"
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q10/5
|
2016-09-20 |
|
[ 771 ]
|
Revision proposals for Recommendation ITU-T K.99 on "Fast" GDTs
|
EPCOS AG
|
Q2/5
|
2016-09-13 |
|
[ 770 ]
(Rev.1) |
Recommendation ITU-T K.21 - proposed new edits
|
Littelfuse UK Ltd.
|
Q4/5
|
2016-09-07 |
|
[ 769 ]
(Rev.1) |
The fourth draft of the new ITU-T Recommendation K.emf "Exposure levels in the close proximity of the radiocommunication antennas"
|
ORANGE POLSKA S.A.
|
Q7/5
|
2016-09-02 |
|
[ 768 ]
(Rev.1) |
The fourth draft of the new ITU-T Recommendation K.env "Guidance on the Environmental Management for Compliance with Radio Frequency EMF limits for Radiocommunication Base Stations"
|
ORANGE POLSKA S.A.
|
Q7/5
|
2016-09-02 |
|
[ 767 ]
(Rev.1) |
Recommendation ITU-T K.50 - proposed new edits
|
Littelfuse UK Ltd.
|
Q4/5
|
2016-08-23 |
|
[ 766 ]
(Rev.1-2) |
Draft Recommendation K.FTTdp, "Requirements for Lightning Protection of Fibre To The distribution point (FTTdp) Equipment"
|
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
|
Q5/5, Q4/5
|
2016-08-17 |
|
[ 765 ]
|
Baseline text for draft Recommendation on Key performance indicators for smart sustainable cities
|
United Arab Emirates
|
Q18/5
|
2016-04-08 |
|
[ 764 ]
|
Contribution and feedback on ITU SSC Key performance indicators for smart sustainable cities based on Dubai experience
|
United Arab Emirates
|
Q18/5
|
2016-04-08 |
|
[ 763 ]
|
Mobilizing Arab Wide Action for Reliable Environment Data (MAWARED)
|
Egypt
|
Q15/5
|
2016-04-08 |
|
[ 762 ]
(Rev.1) |
Comments to document COM 5 - C 0546 Rev.1 - E of September 2015 attached to document COM 5 - LS 147 - E (Liaison Statement on comments to the ICNIRP documents)
|
European Broadcasting Union
|
Q7/5
|
2016-04-07 |
|
[ 761 ]
(Rev.1) |
Using ICTs for Adaptation of the Agriculture sector to the effects of Climate Change
|
Communications Authority of Kenya (CA)
|
Q15/5
|
2016-04-07 |
|
[ 760 ]
|
Questions proposed for study during the next study period 2017-2020
|
Orange
|
QALL/5
|
2016-04-07 |
|
[ 759 ]
|
Base Text for K.spd
|
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
|
Q2/5
|
2016-04-07 |
|
[ 758 ]
|
Draft Revised K.57
|
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
|
Q3/5
|
2016-04-07 |
|
[ 757 ]
(Rev.1) |
Draft Revised K.64
|
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
|
Q4/5
|
2016-04-07 |
|
[ 756 ]
|
Draft Revised K.75
|
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
|
Q4/5
|
2016-04-07 |
|
[ 755 ]
|
Draft Revised K.35
|
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
|
Q5/5
|
2016-04-07 |
|
[ 754 ]
(Rev.1) |
Draft Revised K.39
|
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
|
Q5/5
|
2016-04-07 |
|
[ 753 ]
|
Draft Revised K.40
|
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
|
Q5/5
|
2016-04-07 |
|
[ 752 ]
|
Draft Revised K.66
|
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
|
Q5/5
|
2016-04-07 |
|
[ 751 ]
|
Draft Revised K.73
|
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
|
Q5/5
|
2016-04-07 |
|
[ 750 ]
|
Proposed revisions and comments on Key performance indicators for smart sustainable cities
|
InfoComm Development Authority of Singapore (IDA)
|
Q18/5
|
2016-04-07 |
|
[ 749 ]
(Rev.1) |
Proposed modification on the latest draft Rec. L.rfrc developed during 2015 Dec. 9 teleconference
|
Waseda University
|
Q14/5
|
2016-04-07 |
|
[ 748 ]
(Rev.1) |
Second contribution to the Q15 discussion on proposals for new Question merging Q14 and Q15
|
Telecom Italia S.p.A.
|
Q15/5, Q14/5
|
2016-04-07 |
|
[ 747 ]
(Rev.1) |
First contribution to the Q15 discussion on proposals for new Question merging Q14 and Q15
|
Telecom Italia S.p.A.
|
Q15/5, Q14/5
|
2016-04-07 |
|
[ 746 ]
|
Minutes on the WMO - ITU-T Q15/5 e-meeting on possible cooperation
|
Telecom Italia S.p.A.
|
Q15/5, Q14/5
|
2016-04-07 |
Results:845 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):