International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 16 : Meeting 2010-07-19 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 16  TD-WP1 (2010-07-19) 

ITU-T SG 16

Multimedia coding, systems and applications

Study Period 2009

Meeting  from 2010-07-19 to 2010-07-30

held in Switzerland [Geneva]

Other Meetings : 2012-04-30  2011-11-21  2011-03-14  [ 2010-07-19 ]  2009-10-26  2009-07-10  2009-06-26  2009-01-27 

Results:15 total items.
Temporary Documents  (WP1)  [ AI/Question: Q16/16 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 122-WP1 ]  
 
Reply LS on status of new Recommendation P.ASPD "Subjective Performance of Active Signal Processing Devices"     Rapporteur Q15/16 , Rapporteur Q16/16 , Rapporteur Q18/16   Q18/16, Q16/16, Q15/16   2010-07-28
[ 117-WP1 ]  
 
Reply LS to ETSI TC STQ and 3GPP SA, TC TISPAN, ITU-T SG12 on procedures for the identification and selection of common modes of de-jitter buffers and echo cancellers     Rapporteur Q16/16   Q16/16   2010-07-26
[ 102-WP1 ]  
 
Report of Question 16/16 "Speech enhancement functions in signal processing network equipment"     Rapporteur Q16/16   Q16/16   2010-07-15
[ 96-WP1 ]  
 
Draft revised ITU-T Rec. G.160 "Voice Enhancement Devices"     Editor G.160   Q16/16   2010-07-15
[ 95-WP1 ]  
 
Draft revised ITU-T Rec. G.168 "Digital network echo cancellers": input draft     Editor G.168   Q16/16   2010-07-13
[ 94-WP1 ]  
(Rev.1) 
Draft new Annex B to Rec. ITU-T G.169 (Automatic listener enhancement): input draft     Rapporteur Q16/16   Q16/16   2010-07-12
[ 93-WP1 ]  
(Rev.1) 
Draft revised Rec. ITU-T G.169 (V2) (Automatic level control devices): input draft     Rapporteur Q16/16   Q16/16   2010-07-12
[ 92-WP1 ]  
 
Draft new ITU-T G.168 Annex E (Embedded echo cancellers): input draft     Rapporteur Q16/16   Q16/16   2010-07-12
[ 91-WP1 ]  
(Rev.1) 
Draft text for Technical Paper on "The composite source signal as a measuring signal and a summary of various investigations on speech echo cancellers"     Editor GSTP.CSS   Q16/16   2010-07-12
[ 90-WP1 ]  
 
ITU-T G.168 Annex E (EEC) - Plan and requirements for a control mechanism     Rapporteur Q16/16   Q16/16   2010-06-16
[ 89-WP1 ]  
(Rev.1) 
ITU-T G.168 (V7) Living List     Rapporteur Q16/16   Q16/16   2010-06-16
[ 88-WP1 ]  
(Rev.1) 
Report of the ITU Workshop on "Interactions of Voiceband Signal Processing Functions and their End-to-End Coordination" (Germantown, MD, USA, 21 April 2010)     Chairman WP1/16   Q18/16, Q16/16, Q15/16   2010-05-06
[ 86-WP1 ]  
 
Report of Q16/16 Rapporteurs Group meeting (Germantown, MD, USA, 14-20 April 2010)     Rapporteur Q16/16   Q16/16   2010-04-21
[ 83-WP1 ]  
 
Agenda and documentation for Q16/16     Rapporteur Q16/16   Q16/16   2010-04-21
[ 80-WP1 ]  
(Rev.1) 
Draft agenda and work plan for WP 1/16 (Geneva, 19-30 July 2010)     Chairman WP1/16   Q18/16, Q16/16, Q15/16, Q14/16   2010-04-21
Results:15 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-5