Français
Español
Home
:
ITU-T
:
SG15
:
Contributions
Recently posted
-
Search Meeting Documents
ITU-T SG15 C
ITU-T SG15
Max # of documents displayed/page:
Transport network structures
Study Period 2009
Results:
24
total items.
Contributions
[ Source: NEC Corporation ] [ AI/Question: Q9/15 ]
Number
Title
Source
AI/Question
Filter...
Q10/15
Q14/15
Clear filter
Date
[ 2144 ]
Proposed text for the guidance to performance measurement by ETH OAM
Fujitsu Limited
,
NEC Corporation
Q9/15
,
Q14/15
,
Q10/15
2012-08-27
[ 2115 ]
Consideration of the CSF function on G.8021
NEC Corporation
Q9/15
2012-08-27
[ 2114 ]
Clarification of APS protocol type on G.smp m:1 architecture
NEC Corporation
Q9/15
2012-08-27
[ 2113 ]
Proposed text for the network connectivity in G.Supplement for G.8032
NEC Corporation
Q9/15
2012-08-27
[ 1817 ]
(Rev.1)
G.8021 editors contribution: OAM extraction process
Huawei Technologies Co. Ltd.
,
NEC Corporation
Q9/15
2011-11-22
[ 1647 ]
(Rev.1)
Proposed modification for the interconnection between two different bridge types in G.808.1
NEC Corporation
Q9/15
2011-11-21
[ 1646 ]
(Rev.1)
Consideration of the accuracy for ETH-CC based dDEG mechanism
NEC Corporation
Q9/15
2011-11-21
[ 1644 ]
(Rev.1)
Proposed modification of CCM-based proactive LM process in G.8021
NEC Corporation
Q9/15
2011-11-21
[ 1643 ]
(Rev.1)
Proposed definition for MEP and MIP compound functions in G.8021
NEC Corporation
Q9/15
2011-11-21
[ 1642 ]
(Rev.1)
Proposed enhancement of proactive performance monitoring to G.8021 ETHG_FT function
NEC Corporation
Q9/15
2011-11-21
[ 1641 ]
(Rev.1)
Proposed text for CSF process in G.8021 ETH adaptation functions
NEC Corporation
Q9/15
2011-11-21
[ 1640 ]
(Rev.1)
Proposed modification of the ETH_C_MI_PS_SD_Protection signal in G.8031
NEC Corporation
Q9/15
2011-11-21
[ 892 ]
Proposed text modifications to the delay measurement process in G.8021
NEC Corporation
Q9/15
2010-05-18
[ 891 ]
Proposed text for ETH group functions in G.8021
NEC Corporation
Q9/15
2010-05-18
[ 890 ]
Consideration of the proactive FD/FDV measurements in G.8021/Y.1731
NEC Corporation
Q9/15
,
Q14/15
,
Q10/15
2010-05-18
[ 889 ]
Consideration of the enhancement of performance monitoring in G.8021/Y.1731
NEC Corporation
Q9/15
,
Q14/15
,
Q10/15
2010-05-18
[ 422 ]
Configuration principle of interconnected rings in G.8032v2
NEC Corporation
Q9/15
2009-09-15
[ 421 ]
Considerations of guard timer in G.8032v2
NEC Corporation
Q9/15
2009-09-15
[ 420 ]
Considerations of FS state in G.8032v2
NEC Corporation
Q9/15
2009-09-15
[ 419 ]
Considerations of initial state in G.8032v2
NEC Corporation
Q9/15
2009-09-15
[ 418 ]
Proposed text for equal priority requests in G.8031
NEC Corporation
Q9/15
2009-09-15
[ 417 ]
Proposed modification for loss measurement process in G.8021
NEC Corporation
Q9/15
2009-09-15
[ 114 ]
Reconsideration of topology restrictions on G.8032v2
NEC Corporation and Fujitsu
Q9/15
2008-11-20
[ 80 ]
(Rev.1)
Proposed modification of clearing FS/MS commands on G.8032
NEC Corporation
Q9/15
2008-11-19
Results:
24
total items.
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Test ITU Translate for automated document translation
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2024-4-29