Contributions
[ AI/Question: Q6/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1825 ]
(Rev.1) |
Proposal for modifying wording on Flexible Grid in revised G.694.1
|
Huawei Technologies Co. Ltd.
|
Q6/15
|
2011-11-22 |
|
[ 1824 ]
(Rev.1) |
Proposal for modifying definition of OSNR in G.Sup39
|
Huawei Technologies Co. Ltd.
|
Q6/15
|
2011-11-22 |
|
[ 1823 ]
(Rev.1) |
Proposal for eye mask related criteria for DQPSK time domain skew detection in G.698.2
|
Huawei Technologies Co. Ltd.
|
Q6/15
|
2011-11-22 |
|
[ 1819 ]
(Rev.1) |
G.sdapp offgrid frequencies proposal on decision 3 of G.sdapp decision tree
|
Alphion Corporation
,
Gemfire Europe Limited
,
Huawei Technologies Co. Ltd.
,
Juniper Networks
|
Q6/15
|
2011-11-22 |
|
[ 1818 ]
(Rev.1) |
Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1746 ]
(Rev.1) |
Proposal of DC-DQPSK in G.sup39
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q6/15
|
2011-11-22 |
|
[ 1743 ]
(Rev.1-2) |
Considerations on beyond 100G transmission for G.Sup 39
|
China Unicom
,
ZTE Corporation
|
Q6/15
|
2011-11-22 |
|
[ 1742 ]
(Rev.1) |
Proposal for studying constellation in G.Sup39
|
ZTE Corporation
|
Q6/15
|
2011-11-22 |
|
[ 1741 ]
(Rev.1) |
Considerations on EVM in G.698.2
|
ZTE Corporation
|
Q6/15
|
2011-11-22 |
|
[ 1738 ]
(Rev.1) |
On-grid frequencies up & down proposal in Decision 2 of Decision Tree
|
Gemfire Europe Limited
,
Huawei Technologies Co. Ltd.
|
Q6/15
|
2011-11-22 |
|
[ 1688 ]
(Rev.1) |
Proposal for joint discussion about flexible grid network
|
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2011-11-21 |
|
[ 1681 ]
(Rev.1) |
Updated definition of EVM for G.698.2
|
Ciena Corporation
|
Q6/15
|
2011-11-21 |
|
[ 1639 ]
|
Withdrawn: Proposal to add new application codes in G.sdapp
Withdrawn
|
Electronics and Telecommunications Research Institute (ETRI)
,
LG-Ericsson
|
Q6/15
|
2011-11-21 |
|
[ 1608 ]
(Rev.1) |
Considerations for ODU5
|
Alcatel-Lucent USA Inc.
|
Q6/15, Q11/15
|
2011-11-19 |
|
[ 1573 ]
(Rev.1) |
Flexible Rate OTU signal
|
Finisar Corporation
,
Infinera Corporation
,
Verizon Communication Corporation
|
Q6/15, Q12/15, Q11/15
|
2011-11-18 |
|
[ 1533 ]
(Rev.1) |
Proposal to start a new recommendation G.metro (Ultra-dense WDM applications enabled by coherent detection and tuneable transceiver functionality)
|
China Unicom
,
Nokia Siemens Networks GmbH & Co. KG
|
Q6/15, Q2/15
|
2011-11-17 |
|
[ 1528 ]
|
Further example for the use of flexible grids in Appendix I of Rec. G.694.1
|
Nokia Siemens Networks GmbH & Co. KG
|
Q6/15
|
2011-11-15 |
|
[ 1520 ]
|
DOCUMENT WITHDRAWN
|
Deutsche Telekom
|
Q6/15, Q11/15
|
2011-08-23 |
|
[ 1519 ]
|
New OTN interfaces in ITU-T G.709
|
Deutsche Telekom
|
Q6/15, Q11/15
|
2011-07-11 |
|
[ 1502 ]
|
Functional description and transfer parameters of multi-degree reconfigurable OADM in G.680
|
Huawei
|
Q6/15
|
2011-02-02 |
|
[ 1501 ]
|
Consideration of optical non-linear limitations in G.696.1
|
Huawei
|
Q6/15
|
2011-02-02 |
|
[ 1462 ]
|
Considerations on transverse compatibility for systems according to G.698.2
|
Deutsche Telekom
|
Q6/15
|
2011-02-02 |
|
[ 1398 ]
|
Considerations on flexible grids
|
Alcatel-Lucent
|
Q6/15
|
2011-02-01 |
|
[ 1397 ]
|
Progress on standardization of P-DPSK modulation format
|
Alcatel-Lucent
|
Q6/15
|
2011-02-01 |
|
[ 1374 ]
|
Proposed Wavelength allocation and standard structure of G.sdapp
|
Huawei
|
Q6/15
|
2011-02-01 |
|
[ 1371 ]
|
Definition of a flexible grid in G.694.1
|
Ciena Corporation
|
Q6/15
|
2011-02-01 |
|
[ 1288 ]
|
Extension of Rec. G.694.1 by a new clause to address flexible frequency grids
|
Nokia Siemens Networks GmbH & Co. KG, Germany
|
Q6/15
|
2011-01-31 |
|
[ 1284 ]
|
Proposal of subjects to be discussed regarding flexible grids
|
NTT
|
Q6/15
|
2011-01-31 |
|
[ 1255 ]
|
Some OTN related revision suggestions in G.696.1(MIIT-CATR)
|
MIIT China
|
Q6/15
|
2011-01-31 |
|
[ 1252 ]
|
PMD parameters description method suggestion(MIIT-CATR)
|
MIIT China
|
Q6/15
|
2011-01-31 |
|
[ 1227 ]
|
The wavelength bands for G.sdapp systems
|
KT
|
Q6/15
|
2011-01-31 |
|
[ 1186 ]
|
Some Considerations about In-band OSNR Measurement
|
China United Network Communications Group
|
Q6/15
|
2011-01-31 |
|
[ 1151 ]
|
Wavelength Proposal on TEE to HEE direction in G.sdapp
|
ZTE
|
Q6/15
|
2011-01-31 |
|
[ 1140 ]
|
Proposal for G.sdapp transmitter and receiver parameters
|
LG-Ericsson
|
Q6/15
|
2011-01-28 |
|
[ 1139 ]
|
Proposal for G.sdapp general parameters and optical path parameters
|
LG-Ericsson
|
Q6/15
|
2011-01-28 |
|
[ 1138 ]
|
Some parameter definitions for G.sdapp
|
LG-Ericsson
|
Q6/15
|
2011-01-28 |
|
[ 1137 ]
|
Cross talk penalty calculations for G.sdapp
|
LG-Ericsson
|
Q6/15
|
2011-01-28 |
|
[ 1136 ]
|
Commonalities of G.sdapp frequency grid proposals
|
LG-Ericsson
|
Q6/15
|
2011-01-28 |
|
[ 1135 ]
|
Impairments in seeded DWDM Systems
|
LG-Ericsson
|
Q6/15
|
2011-01-28 |
|
[ 1126 ]
|
Situation 2 in G.680 - Considerations on Approach 1 and Approach 2
|
Italy
|
Q6/15
|
2011-01-28 |
|
[ 1125 ]
|
Development of formulae and/or equations to predict the non-linear penalty from available DWDM line segment parameters ( Approach 1 ) to move forward the revision of Recommendation G.680 with respect to the development of Situation 2
|
ISCTI
|
Q6/15
|
2011-01-28 |
|
[ 1121 ]
|
Addition of Subcarrier Multiplexing (SCM) as one of the line coding schemes in section 7 of G.Sup39
|
Ericsson
|
Q6/15
|
2011-01-27 |
|
[ 1120 ]
|
Fiber link asymmetry compensation
|
Ericsson
|
Q6/15, Q13/15
|
2011-01-27 |
|
[ 1119 ]
|
Standardization of modulation formats
|
ZTE Corporation
|
Q6/15
|
2011-01-27 |
|
[ 1118 ]
|
Required information for non-linear effects estimation for Situation 2 of G.680
|
ZTE Corporation
|
Q6/15
|
2011-01-27 |
|
[ 1117 ]
|
Considerations on Maximum spectral excursion and Maximum ripple in G.698.2
|
ZTE Corporation
|
Q6/15
|
2011-01-27 |
|
[ 1116 ]
|
Proposals on granularity of the flexible grids in G.694.1
|
ZTE Corporation
|
Q6/15
|
2011-01-27 |
|
[ 1115 ]
|
Proposal to include additional RIN-related reference point for G.sdapp
|
ETRI
|
Q6/15
|
2011-01-27 |
|
[ 1094 ]
|
The revised edition of proposed applications in G.959.1
|
China Unicom Network Communications Group Company
|
Q6/15
|
2010-05-21 |
|
[ 1057 ]
|
Some consideration with 40G intra-office interface parameters
|
CATR
|
Q6/15
|
2010-05-21 |
Results:169 total items. Result page:
Previous -
1 -
2 -
3 -
4
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):