International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:23 total items.
Contributions  [ Source: Huawei ]  [ AI/Question: Q4/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1874 ]  
(Rev.1) 
G.vector: Initialization for Simultaneous Joining Lines     Huawei Technologies Co. Ltd.   Q4/15   2011-11-22
[ 1872 ]  
(Rev.1) 
G.fast: TDD Frame Structure and Timing Overhead     Huawei Technologies Co. Ltd.   Q4/15   2011-11-22
[ 1868 ]  
(Rev.1) 
G.fast: Point-to-Point Distribution is the Right Choice for G.fast     Huawei Technologies Co. Ltd.   Q4/15   2011-11-22
[ 1864 ]  
(Rev.1) 
G.fast: Equal-Length FEXT Measurements on PE05 Cable     Huawei Technologies Co. Ltd.   Q4/15   2011-11-22
[ 1862 ]  
(Rev.1) 
G.fast: Target Bit Error Rate of G.fast at Gamma Interface     Huawei Technologies Co. Ltd.   Q4/15   2011-11-22
[ 1242 ]  
 
G.gen, G.vdsl: An Introduction to Advances in Multi-Wire Transmission Technologies     Huawei   Q4/15   2011-01-31
[ 1241 ]  
 
G.vdsl: Updated Working Text for Distribution of Time-of-Day over VDSL2 Links     Huawei , China MIIT   Q4/15   2011-01-31
[ 1240 ]  
 
G.vector: A Comment on G.993.5 (04/2010)     Huawei   Q4/15   2011-01-31
[ 1046 ]  
 
G.vdsl: Proposed Text for Distribution of Time-of-Day over VDSL2 Links     Huawei , MIIT   Q4/15   2010-05-20
[ 1045 ]  
 
G.vdsl: More on Distribution of Time-of-Day over VDSL2 Links     Huawei , China Telecom , MIIT   Q4/15   2010-05-20
[ 712 ]  
 
G.vector: Proposed way forward on the issue of FDM pilots     Huawei Technologies , MII   Q4/15   2009-09-20
[ 711 ]  
 
G.vector: On Error Sample Quantization Format     Huawei Technologies , MII   Q4/15   2009-09-20
[ 710 ]  
 
G.vector: Line Stability after a Disorderly Leaving Event     Huawei Technologies , MII   Q4/15   2009-09-20
[ 316 ]  
 
G.inp: Updated Working Text for Physical-Layer Retransmission     MII, China, Huawei   Q4/15   2008-11-25
[ 315 ]  
 
G.inp: Simulation Results for Evaluation of Retransmission Methods     MII, China, Huawei   Q4/15   2008-11-25
[ 314 ]  
 
G.int: Proposal for Next-Generation LINK/PHY Interface     MII, China, Huawei, ZTE   Q4/15   2008-11-25
[ 313 ]  
 
G.vector: Preventing Disruption of Existing Lines During Joining     MII, China, Huawei   Q4/15   2008-11-25
[ 312 ]  
 
G.inp: More Simulation Results for Evaluation of Retransmission Methods     MII, China, Huawei   Q4/15   2008-11-25
[ 311 ]  
 
G.vdsl: Improving the Performance of Upstream Power Back-off     MII, China, Huawei   Q4/15   2008-11-25
[ 310 ]  
 
G.inp: Impact of Impulse Noise Sensor on Retransmission on Delta Interface     MII, China, Huawei   Q4/15   2008-11-25
[ 309 ]  
 
G.int: Comments on LINK/PHY Interface     MII, China, Huawei, ZTE   Q4/15   2008-11-25
[ 308 ]  
 
G.inp: An Updated Model for Retransmission between PMD and PMS-TC Sub-Layers     MII, China, Huawei   Q4/15   2008-11-25
[ 174 ]  
 
On the need to distribute accurate phase/Time-of-Day over DSL links     RAD Data Communications, Huawei   Q4/15, Q13/15   2008-11-21
Results:23 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-5