Contributions
[ Source: Huawei ] [ AI/Question: Q4/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1874 ]
(Rev.1) |
G.vector: Initialization for Simultaneous Joining Lines
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1872 ]
(Rev.1) |
G.fast: TDD Frame Structure and Timing Overhead
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1868 ]
(Rev.1) |
G.fast: Point-to-Point Distribution is the Right Choice for G.fast
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1864 ]
(Rev.1) |
G.fast: Equal-Length FEXT Measurements on PE05 Cable
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1862 ]
(Rev.1) |
G.fast: Target Bit Error Rate of G.fast at Gamma Interface
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1242 ]
|
G.gen, G.vdsl: An Introduction to Advances in Multi-Wire Transmission Technologies
|
Huawei
|
Q4/15
|
2011-01-31 |
|
[ 1241 ]
|
G.vdsl: Updated Working Text for Distribution of Time-of-Day over VDSL2 Links
|
Huawei
,
China MIIT
|
Q4/15
|
2011-01-31 |
|
[ 1240 ]
|
G.vector: A Comment on G.993.5 (04/2010)
|
Huawei
|
Q4/15
|
2011-01-31 |
|
[ 1046 ]
|
G.vdsl: Proposed Text for Distribution of Time-of-Day over VDSL2 Links
|
Huawei
,
MIIT
|
Q4/15
|
2010-05-20 |
|
[ 1045 ]
|
G.vdsl: More on Distribution of Time-of-Day over VDSL2 Links
|
Huawei
,
China Telecom
,
MIIT
|
Q4/15
|
2010-05-20 |
|
[ 712 ]
|
G.vector: Proposed way forward on the issue of FDM pilots
|
Huawei Technologies
,
MII
|
Q4/15
|
2009-09-20 |
|
[ 711 ]
|
G.vector: On Error Sample Quantization Format
|
Huawei Technologies
,
MII
|
Q4/15
|
2009-09-20 |
|
[ 710 ]
|
G.vector: Line Stability after a Disorderly Leaving Event
|
Huawei Technologies
,
MII
|
Q4/15
|
2009-09-20 |
|
[ 316 ]
|
G.inp: Updated Working Text for Physical-Layer Retransmission
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 315 ]
|
G.inp: Simulation Results for Evaluation of Retransmission Methods
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 314 ]
|
G.int: Proposal for Next-Generation LINK/PHY Interface
|
MII, China, Huawei, ZTE
|
Q4/15
|
2008-11-25 |
|
[ 313 ]
|
G.vector: Preventing Disruption of Existing Lines During Joining
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 312 ]
|
G.inp: More Simulation Results for Evaluation of Retransmission Methods
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 311 ]
|
G.vdsl: Improving the Performance of Upstream Power Back-off
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 310 ]
|
G.inp: Impact of Impulse Noise Sensor on Retransmission on Delta Interface
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 309 ]
|
G.int: Comments on LINK/PHY Interface
|
MII, China, Huawei, ZTE
|
Q4/15
|
2008-11-25 |
|
[ 308 ]
|
G.inp: An Updated Model for Retransmission between PMD and PMS-TC Sub-Layers
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 174 ]
|
On the need to distribute accurate phase/Time-of-Day over DSL links
|
RAD Data Communications, Huawei
|
Q4/15, Q13/15
|
2008-11-21 |
Results:23 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):