International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:143 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
Contributions  [ AI/Question: Q14/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1327 ]  
 
Proposal to define MI for G-Ach packets     Fujitsu , Hitachi , NEC   Q9/15, Q14/15, Q10/15   2011-02-01
[ 1323 ]  
 
Proposed text to update clause 10 in G.8121     Fujitsu   Q9/15, Q14/15   2011-02-01
[ 1305 ]  
 
Procedural issues on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-02-01
[ 1303 ]  
 
Inter SDO Cooperation on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5   2011-02-01
[ 1301 ]  
 
Operator Requirements for MPLS-TP OAM     Verizon , BT , France Telecom Orange , Qwest , Telenor , Telstra   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1298 ]  
 
MPLS-TP OAM - issues with the proposed Y.1731 based OAM solution     Juniper Networks , Cisco , NSN , Verizon   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1295 ]  
 
Models in G.8010     Huawei , Deutsche Telekom   Q9/15, Q14/15, Q12/15   2011-02-01
[ 1279 ]  
 
Consideration on TS sequence in HAO     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1258 ]  
 
Comments on the requirement of the same number of tributary slots on every link along a resizable ODUflex connection in G.hao     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1256 ]  
 
Requirement for communication latency as a traffic engineering performance metric in ASON     ZTE   Q14/15, Q12/15   2011-01-31
[ 1248 ]  
 
PTN GACh+Y.1731 OAM interoperability test activities and result     CATR , China Mobile   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1247 ]  
 
Support for the consent of G.8110.1 and G.tpoam     China MIIT   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1207 ]  
 
Support for consent of G.tpoam     ZTE , Alcatel-Lucent Shanghai Bell , Fiberhome , Huawei   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1167 ]  
 
PBB model for G.8021 & G.8010     Ericsson Canada   Q9/15, Q14/15, Q12/15   2011-01-31
[ 1164 ]  
 
MAC Operations using Y.1731     Alcatel-Lucent USA , Verizon   Q9/15, Q14/15, Q10/15   2011-01-31
[ 1161 ]  
 
MAC Operations using Y.1731 Motivation and Rationale     Alcatel-Lucent USA , Verizon   Q9/15, Q14/15, Q10/15   2011-01-31
[ 1143 ]  
(Rev.1) 
MPLS-TP Standards     United Kingdom   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-28
[ 1141 ]  
 
Proposal for the OTN specific management entity of G.874.1     Fiberhome Technologies Group   Q14/15   2011-01-28
[ 1130 ]  
 
Add topoly usecase in G.8152     ZTE Corporation   Q14/15   2011-01-28
[ 1129 ]  
 
Add topoly support in G.8151     ZTE Corporation   Q14/15   2011-01-28
[ 1124 ]  
 
Structure and content of the MPLS-TP Recommendations     CMCC,CT , CATR   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-28
[ 1123 ]  
 
Associated Channel Type for G.tpoam     CMCC, CT,CATR   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-28
[ 1079 ]  
 
Route Query as used by RC federations with Multi-RC     FiberHome   Q14/15   2010-05-21
[ 1078 ]  
 
Revise the misleading expression of "end-to-end path"     FiberHome   Q14/15   2010-05-21
[ 1077 ]  
 
Proposals about PM Thresholds and Traffic Management in G.8151/Y.1374     Fiberhome   Q14/15   2010-05-21
[ 1076 ]  
 
Proposals about Management of Ethernet Service OAM for G.8152/Y.1375     Fiberhome   Q14/15   2010-05-21
[ 1075 ]  
 
Policy-management interface in route query operation     FiberHome   Q14/15   2010-05-21
[ 1072 ]  
 
Backward Recursive Routing using Route Query Interface     FiberHome   Q14/15   2010-05-21
[ 1044 ]  
 
Proposal for ring topology discovery     ZTE   Q14/15   2010-05-20
[ 1043 ]  
 
Scenarios of mpls-tp discovery     ZTE   Q14/15   2010-05-20
[ 925 ]  
 
Proposed modifications on MPLS-TP SCN in G.7712     Fujitsu   Q9/15, Q14/15   2010-05-18
[ 890 ]  
 
Consideration of the proactive FD/FDV measurements in G.8021/Y.1731     NEC Corporation   Q9/15, Q14/15, Q10/15   2010-05-18
[ 889 ]  
 
Consideration of the enhancement of performance monitoring in G.8021/Y.1731     NEC Corporation   Q9/15, Q14/15, Q10/15   2010-05-18
[ 825 ]  
 
Requirement for multi stages multiplex/demultiplex configuration     China Telecom , China Mobile , China Unicom , ZTE   Q9/15, Q14/15, Q12/15   2010-05-17
[ 786 ]  
 
Ethernet Proactive Frame Delay Measurement     Alcatel-Lucent Italy   Q9/15, Q14/15, Q10/15   2010-05-14
[ 781 ]  
 
Proposed text for the revision of ITU-T Recommendation G.7712     Alcatel-Lucent   Q14/15   2010-05-11
[ 752 ]  
 
G.7713 - Correction to Signalling Sequence     Ciena Corporation   Q14/15   2010-04-28
[ 717 ]  
 
ODU TCM Layer for OTN Auto-discovery as defined in G.7714.1     Alcatel-Lucent   Q14/15, Q12/15   2009-09-20
[ 586 ]  
 
Consideration on ODUflex resizing     ZTE Corporation   Q14/15, Q12/15, Q11/15   2009-09-18
[ 582 ]  
 
Proposal for ring protection information discovering in ASTN     ZTE Corporation   Q14/15   2009-09-18
[ 497 ]  
 
Clarifications to G.7713     Nortel Networks (Canada)   Q14/15   2009-09-17
[ 490 ]  
 
Interlayer Signalling Abstract Messages     Nortel Networks (Canada)   Q14/15   2009-09-17
[ 460 ]  
 
Proposed modification for G.8121 and consideration of Ethernet as MPLS-TP client     Fujitsu   Q9/15, Q14/15, Q12/15, Q10/15   2009-09-16
[ 453 ]  
 
Considerations on the description of the ODU layer network in G.872 and G.8080     Huawei Technologies   Q14/15, Q12/15   2009-09-16
[ 444 ]  
 
Document withdrawn     N/A   Q14/15   2009-09-16
[ 428 ]  
 
Additional requirements for G.7718     Alcatel-Lucent , NTT   Q14/15   2009-09-16
[ 404 ]  
 
Propose to add Link discover Process based on OAM in G.8051     ZTE Corporation   Q14/15   2009-09-15
[ 403 ]  
 
Propose to add requirement of MAC topology management     ZTE Corporation   Q14/15   2009-09-15
[ 402 ]  
 
Propose to add MAC Link discover support in G.8051     ZTE Corporation   Q14/15   2009-09-15
[ 401 ]  
 
Propose to add requirement of discovery support on MPLS-TP OAM Requirement     ZTE Corporation   Q14/15, Q12/15   2009-09-15
Results:143 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-26