Contributions
[ Source: France Télécom ] [ AI/Question: Q13/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2362 ]
|
Scope of G.8275.1
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2361 ]
|
Review of G.8272 latest draft
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2360 ]
|
G.8272: New Appendix describing possible PRTC locations
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2359 ]
|
Results of PDV tolerance testing using sinusoidal patterns as defined in G.8263-Testing
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2358 ]
|
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2357 ]
|
Development of a new Appendix of G.8261.1 on PDV generation testing
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2339 ]
|
PHY and intra-node noise error
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2338 ]
|
Analysis about SyncE rearrangement for different message delays of G.781
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2243 ]
|
Effect of Turnaround on Time Transport Performance using PTP
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2242 ]
|
Advantages of the Pdelay Mechanism in Time Transport using PTP for the case where SyncE is not Used for Frequency Transport
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2241 ]
|
Discussion of T-BC/T-TSC Noise Generation for Phase/Time Synchronization using PTP without SyncE Support
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2240 ]
|
Analysis of Protection Scenario 1 for Phase/Time Synchronization, for the Case of a Shorter SyncE Reference Chain
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2239 ]
|
Further Discussion of BMCA Requirements for the Phase/Time PTP Telecom Profile, and Example Alternate BMCAs
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2238 ]
|
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths, with SyncE Transients Slowed Down by T-BCs and T-TSC, and Conclusions on Mitigation of Effect of the Rearrangement
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2237 ]
|
Analysis of HRM2b SyncE Rearrangement with SyncE Transients Slowed Down by T-BCs
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2235 ]
|
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix
|
Q13/15
|
2012-08-28 |
|
[ 1925 ]
|
G.8271 1pps interface performance specification
|
Deutsche Telekom AG
,
France Télécom Orange
|
Q13/15
|
2011-11-23 |
|
[ 1924 ]
|
Additional Simulation Results of Packet Slave Clock Frequency Based Upon 2nd Order PLL
|
Tellabs Oy
,
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1895 ]
|
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1894 ]
|
G.8271: Editorial comments on latest draft
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1893 ]
|
G.8263: Section 9 - PEC-S-F holdover
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1892 ]
|
G.8263: Section 6 - PEC-S-F slave clock noise generation
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1891 ]
|
G.8263: New Appendix discussing time constant values
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1890 ]
|
G.8261.1: Notes on network equipments producing excessive PDV
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1889 ]
|
G.8261.1: Editorial comments on latest draft
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1888 ]
|
G.8260: Request for clarification about the MAFE corner point
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1887 ]
|
G.8260: Comments on latest draft
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1886 ]
|
Transport of CPRI interface over OTN
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1885 ]
|
Proposal for reply to 3GPP liaison "Response to NGMN LS RP-110476 on coordination between ITU-T and 3GPP on synchronization"
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1884 ]
|
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing
|
Calnex Solutions Limited
,
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1730 ]
|
Maximum FFO of the Output of a Second-Order PLL due to a Sinusoidal and Triangular Wave Input
|
France Télécom Orange
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1729 ]
|
Initial Simulation Results for Transport of Time over the HRM2b chain of Boundary Clocks
|
France Télécom Orange
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1725 ]
|
Initial Simulation Results for Transport of Time over the HRM3 chain of Boundary Clocks, with SyncE Reference Chain Rearrangements
|
France Télécom Orange
,
France Télécom Orange
,
Huawei Technologies Co.
,
Iometrix, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1019 ]
|
G.8251: OTN timing aspects
|
France Télécom
|
Q13/15, Q11/15
|
2010-05-20 |
|
[ 1017 ]
|
Network PDV accumulation study
|
France Télécom
|
Q13/15
|
2010-05-20 |
|
[ 986 ]
|
G.8265.1: Clarifications on the Telecom slave model with multiple slave-only OC instances
|
France Télécom
|
Q13/15
|
2010-05-20 |
|
[ 985 ]
|
G.8265.1: Proposal for the PTP master selection process by a PTP slave in the PTPv2 telecom profile frequency-oriented
|
France Télécom
|
Q13/15
|
2010-05-20 |
|
[ 899 ]
|
Updated Telecom Slave Model
|
Huawei
,
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 894 ]
|
G.8264 Amendment: editorial comments regarding the use of physical methods to deliver timing in a multi-operator context
|
Huawei
,
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 876 ]
|
Issues with the Transparent Clock concept of PTPv2 in a telecom environment
|
France Télécom
|
Q4/15, Q2/15, Q13/15
|
2010-05-18 |
|
[ 875 ]
|
Architecture for phase and time distribution
|
France Télécom
|
Q4/15, Q2/15, Q13/15
|
2010-05-18 |
|
[ 873 ]
|
G.8260: discussion on packet pre-selection criteria and comments on cluster and FWPR PDV metrics
|
France Télécomq
|
Q13/15
|
2010-05-18 |
|
[ 872 ]
|
G.8260: technical comments regarding WD115 (PDV metrics) from San Jose interim meeting
|
France Télécom
,
Tellabs
|
Q13/15
|
2010-05-18 |
|
[ 871 ]
|
G.8260: definition of floor delay, delay steps, and comments on Appendix I
|
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 870 ]
|
G.8260: list of requirements for PDV metrics
|
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 865 ]
|
G.8260: methodology to perform a PDV measurement
|
France Télécom, Ericsson
|
Q13/15
|
2010-05-18 |
|
[ 780 ]
|
Test plan for PDV generation of a single equipment involved in IEEE1588-2008 transport
|
France Télécom
,
Cisco
|
Q13/15
|
2010-05-10 |
|
[ 277 ]
|
Creation of a new TLV in ESMC channel in order to transport frequency stability level information
|
France Télécom, Tellabs
|
Q13/15
|
2008-11-23 |
|
[ 276 ]
|
Proposed text for drafting of PTPv2 telecom profile frequency-oriented
|
France Télécom, Tellabs
|
Q13/15
|
2008-11-23 |
|
[ 275 ]
|
Discussion about the use of "Announce" and "Management" messages for PTPv2 telecom profile frequency-oriented
|
France Télécom, Tellabs
|
Q13/15
|
2008-11-23 |
Results:52 total items. Result page:
1 -
2
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):