International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:44 total items.
Result page:  1 - 2  - Next Next
Contributions  [ Source: Ericsson ]  [ Questions: Q13/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 2014 ]  
(Rev.1) 
2012-08-24 Telefon AB - LM Ericsson   Considerations on Time Sync holdover and rearrangements     Q13/15  
[ 2004 ]  
(Rev.1) 
2012-08-23 Calnex Solutions Limited , Telefon AB - LM Ericsson   Considerations on Time sync Limits in G.8271.1     Q13/15  
[ 2003 ]  
(Rev.1) 
2012-08-23 Telefon AB - LM Ericsson   Multicast address in the G.8275.1 profile     Q13/15  
[ 2002 ]  
(Rev.1) 
2012-08-23 Telefon AB - LM Ericsson   Considerations on the constant asymmetry in the G.8271.1 network reference model     Q13/15  
[ 1994 ]  
(Rev.1) 
2012-08-23 Telefon AB - LM Ericsson   EEC with enhanced Holdover     Q13/15  
[ 1596 ]  
(Rev.1) 
2011-11-18 Telefon AB - LM Ericsson   PDV network limit in G.8261.1     Q13/15  
[ 1595 ]  
(Rev.1-2) 
2011-11-18 Telefon AB - LM Ericsson   Intra-site Time Sync Requirements in G.8271     Q13/15  
[ 1591 ]  
(Rev.1-3) 
2011-11-18 Telefon AB - LM Ericsson   EEC with enhanced Holdover     Q13/15  
[ 1589 ]  
(Rev.1) 
2011-11-18 Telefon AB - LM Ericsson   Noise Generation in G.8263     Q13/15  
[ 1587 ]  
(Rev.1) 
2011-11-18 Telefon AB - LM Ericsson   Proposal for text concerning packet selection in G.8260     Q13/15  
[ 1586 ]  
(Rev.1) 
2011-11-18 Telefon AB - LM Ericsson   Discussion on reference points and network limits in G.8271     Q13/15  
[ 1583 ]  
(Rev.1) 
2011-11-18 Telefon AB - LM Ericsson   Proposal for network limits in G.8271     Q13/15  
[ 1564 ]  
(Rev.1) 
2011-11-18 Telefon AB - LM Ericsson   Holdover specification in G.8263     Q13/15  
[ 1563 ]  
(Rev.1) 
2011-11-18 Telefon AB - LM Ericsson   Discussion on Architecture and BMC algorithm for the Time Sync Telecom Profile (G.8275 and G.8275.1)     Q13/15  
[ 1561 ]  
(Rev.1) 
2011-11-18 Telefon AB - LM Ericsson   PTP Mapping in the first Time Sync Telecom Profile (G. 8275.1)     Q13/15  
[ 1400 ]  
 
2011-02-01 Ericsson   Time Error Budget in the Base Stations and considerations on the rearrangements in the time synchronization network     Q13/15  
[ 1341 ]  
 
2011-02-01 Ericsson   Considerations on the use of the IEEE1588 Transparent Clock in the Time Sync Architectures (G.8275)     Q13/15  
[ 1337 ]  
 
2011-02-01 Ericsson   Discussion on Architecture and BMCA for the Time Sync Telecom Profile (G.8275 and G.8275.1)     Q13/15  
[ 1336 ]  
 
2011-02-01 Ericsson   Time and Phase Sync Interfaces (G.8271)     Q13/15  
[ 1335 ]  
 
2011-02-01 Ericsson   PTP Mapping in the first Time Sync Telecom Profile (G. 8275.1)     Q13/15  
[ 1134 ]  
 
2011-01-28 Ericsson   Revised Clause 6.1 in G.8271     Q13/15  
[ 1120 ]  
 
2011-01-27 Ericsson   Fiber link asymmetry compensation     Q6/15, Q13/15  
[ 977 ]  
 
2010-05-20 Ericsson   Transport of accurate Time Synchronization over access technologies     Q4/15, Q2/15, Q13/15  
[ 959 ]  
 
2010-05-19 Ericsson   Time and Phase Sync Interfaces (G.8271)     Q13/15  
[ 939 ]  
 
2010-05-19 Ericsson   Time Synchronization Telecom Profiles     Q13/15  
Results:44 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2013-5-25