International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:44 total items.
Contributions  [ Source: Ericsson ]  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2014 ]  
(Rev.1) 
Considerations on Time Sync holdover and rearrangements     Telefon AB - LM Ericsson   Q13/15   2012-08-24
[ 2004 ]  
(Rev.1) 
Considerations on Time sync Limits in G.8271.1     Calnex Solutions Limited , Telefon AB - LM Ericsson   Q13/15   2012-08-23
[ 2003 ]  
(Rev.1) 
Multicast address in the G.8275.1 profile     Telefon AB - LM Ericsson   Q13/15   2012-08-23
[ 2002 ]  
(Rev.1) 
Considerations on the constant asymmetry in the G.8271.1 network reference model     Telefon AB - LM Ericsson   Q13/15   2012-08-23
[ 1994 ]  
(Rev.1) 
EEC with enhanced Holdover     Telefon AB - LM Ericsson   Q13/15   2012-08-23
[ 1596 ]  
(Rev.1) 
PDV network limit in G.8261.1     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1595 ]  
(Rev.1-2) 
Intra-site Time Sync Requirements in G.8271     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1591 ]  
(Rev.1-3) 
EEC with enhanced Holdover     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1589 ]  
(Rev.1) 
Noise Generation in G.8263     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1587 ]  
(Rev.1) 
Proposal for text concerning packet selection in G.8260     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1586 ]  
(Rev.1) 
Discussion on reference points and network limits in G.8271     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1583 ]  
(Rev.1) 
Proposal for network limits in G.8271     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1564 ]  
(Rev.1) 
Holdover specification in G.8263     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1563 ]  
(Rev.1) 
Discussion on Architecture and BMC algorithm for the Time Sync Telecom Profile (G.8275 and G.8275.1)     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1561 ]  
(Rev.1) 
PTP Mapping in the first Time Sync Telecom Profile (G. 8275.1)     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1400 ]  
 
Time Error Budget in the Base Stations and considerations on the rearrangements in the time synchronization network     Ericsson   Q13/15   2011-02-01
[ 1341 ]  
 
Considerations on the use of the IEEE1588 Transparent Clock in the Time Sync Architectures (G.8275)     Ericsson   Q13/15   2011-02-01
[ 1337 ]  
 
Discussion on Architecture and BMCA for the Time Sync Telecom Profile (G.8275 and G.8275.1)     Ericsson   Q13/15   2011-02-01
[ 1336 ]  
 
Time and Phase Sync Interfaces (G.8271)     Ericsson   Q13/15   2011-02-01
[ 1335 ]  
 
PTP Mapping in the first Time Sync Telecom Profile (G. 8275.1)     Ericsson   Q13/15   2011-02-01
[ 1134 ]  
 
Revised Clause 6.1 in G.8271     Ericsson   Q13/15   2011-01-28
[ 1120 ]  
 
Fiber link asymmetry compensation     Ericsson   Q6/15, Q13/15   2011-01-27
[ 977 ]  
 
Transport of accurate Time Synchronization over access technologies     Ericsson   Q4/15, Q2/15, Q13/15   2010-05-20
[ 959 ]  
 
Time and Phase Sync Interfaces (G.8271)     Ericsson   Q13/15   2010-05-19
[ 939 ]  
 
Time Synchronization Telecom Profiles     Ericsson   Q13/15   2010-05-19
[ 865 ]  
 
G.8260: methodology to perform a PDV measurement     France Télécom, Ericsson   Q13/15   2010-05-18
[ 842 ]  
 
Time and Phase Sync noise budget in G.8271     Ericsson   Q13/15   2010-05-17
[ 841 ]  
 
Details on Time Sync Methods in G.8271     Ericsson   Q13/15   2010-05-17
[ 840 ]  
 
Time and Phase Sync Requirements Updates in G.8271     Ericsson   Q13/15   2010-05-17
[ 839 ]  
 
G.8261.1 scope proposal     Ericsson   Q13/15   2010-05-17
[ 838 ]  
 
Discussion on CPRI over OTN Sync Requirements     Ericsson   Q13/15   2010-05-17
[ 604 ]  
 
Comment on Traffic Models in G.8261     Ericsson   Q13/15   2009-09-18
[ 509 ]  
 
Introductory text on NTP for frequency distribution in G.8264.1 and G.8261     Ericsson   Q13/15   2009-09-17
[ 496 ]  
 
G.8264.1 proposals     Ericsson   Q13/15   2009-09-17
[ 495 ]  
 
ESMC SSM Extension: discussion on the Node Identifier     Ericsson   Q13/15   2009-09-17
[ 493 ]  
 
ESMC-SSM Extensions proposals     Ericsson   Q13/15   2009-09-17
[ 473 ]  
 
Details on Time Sync Methods in G.8266     Ericsson   Q13/15   2009-09-16
[ 470 ]  
 
Time Sync Master definition in G.8266     Ericsson   Q13/15   2009-09-16
[ 101 ]  
 
PEC Network Limits and packet based clock characteristics (G.8261 and G.8263)     Ericsson   Q13/15   2008-11-20
[ 100 ]  
 
Proposals for G.pactiming-bis     Ericsson   Q13/15   2008-11-20
[ 99 ]  
 
PNT-F and CES-IWF integrated in the end equipment     Ericsson   Q13/15   2008-11-20
[ 98 ]  
 
Reference Points where network requirements apply; Frequency Synchronization case     Ericsson   Q13/15   2008-11-20
[ 97 ]  
 
General aspects on the protocols for packet based methods in G.8264     Ericsson   Q13/15   2008-11-20
[ 96 ]  
 
Details on the use of NTP for frequency distribution in G.8264     Ericsson   Q13/15   2008-11-20
Results:44 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-29