International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:22 total items.
Contributions  [ Source: Deutsche Telekom ]  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2143 ]  
 
G.8273: Test methodology annex/appendix     Calnex Solutions Limited , Deutsche Telekom AG   Q13/15   2012-08-27
[ 1928 ]  
 
Measurement Methods for Phase/Time Clocks     Deutsche Telekom AG   Q13/15   2011-11-23
[ 1927 ]  
 
PTP and SyncE over OTN-ODU0     Deutsche Telekom AG   Q13/15   2011-11-23
[ 1926 ]  
 
G.8271: Minor editorial improvements     Deutsche Telekom AG   Q13/15   2011-11-23
[ 1925 ]  
 
G.8271 1pps interface performance specification     Deutsche Telekom AG , France Télécom Orange   Q13/15   2011-11-23
[ 1267 ]  
 
G.8272 PRTC type approval process proposal     Deutsche Telekom   Q13/15   2011-01-31
[ 1266 ]  
 
G.8272 PRTC Options: Temperature     Deutsche Telekom   Q13/15   2011-01-31
[ 1265 ]  
 
LTE-Advanced Coordinated Multi-point (CoMP) Time/phase accuracy requirements for ITU-T Q13/15 (G.827x)     Deutsche Telekom   Q13/15   2011-01-31
[ 1264 ]  
 
Need for EEC chain hold-over management     Deutsche Telekom   Q13/15   2011-01-31
[ 990 ]  
 
G.827x Slave Clock specification (for time)     Deutsche Telekom   Q13/15   2010-05-20
[ 989 ]  
 
Q13 Requirements structure for time supply (G.827x)     Deutsche Telekom   Q13/15   2010-05-20
[ 988 ]  
 
Input for G.827x Slave clock specification     Deutsche Telekom   Q13/15   2010-05-20
[ 987 ]  
 
SyncE Jitter tolerance (high frequency)     Deutsche Telekom   Q13/15   2010-05-20
[ 844 ]  
 
G.8262 V.2 minor comments     Deutsche Telekom   Q13/15   2010-05-17
[ 804 ]  
 
SyncE Jitter tolerance values     Deutsche Telekom   Q13/15   2010-05-14
[ 743 ]  
 
Mobile LTE specification and phase/time synchronization requirements     Deutsche Telekom   Q13/15   2009-09-21
[ 742 ]  
 
NGN Synchronization requirements structure     Deutsche Telekom   Q13/15   2009-09-21
[ 741 ]  
 
EEC - SyncE interface jitter and wander measurements     Deutsche Telekom   Q13/15   2009-09-21
[ 740 ]  
 
PTP for Phase/ToD application: Need for in-house ToD interface specification     Deutsche Telekom   Q13/15   2009-09-21
[ 170 ]  
 
Architecture for time supply with frequency support (related to PTP and planned G.8265)     Deutsche Telekom   Q13/15   2008-11-21
[ 169 ]  
 
Hold-off time acc. to G.781 and SyncE     Deutsche Telekom   Q13/15   2008-11-21
[ 168 ]  
 
G.8261/G.8262: EEC function requirements for T4 via Selector A and C     Deutsche Telekom   Q13/15   2008-11-21
Results:22 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-29