International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:487 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2003 ]  
(Rev.1) 
Multicast address in the G.8275.1 profile     Telefon AB - LM Ericsson   Q13/15   2012-08-23
[ 2002 ]  
(Rev.1) 
Considerations on the constant asymmetry in the G.8271.1 network reference model     Telefon AB - LM Ericsson   Q13/15   2012-08-23
[ 1994 ]  
(Rev.1) 
EEC with enhanced Holdover     Telefon AB - LM Ericsson   Q13/15   2012-08-23
[ 1987 ]  
 
G.8272 latest draft editorial comments     Integrated Device Technology (IDT)   Q13/15   2012-08-22
[ 1986 ]  
 
G.8272 Summary     Integrated Device Technology (IDT)   Q13/15   2012-08-22
[ 1985 ]  
 
Time Error Budget to Allocate to Error Inside BC [G.8271 / G.8273.2]     Microsemi Semiconductor Corporation   Q13/15   2012-08-22
[ 1984 ]  
 
Thoughts on Options for Syntonization of T-BC without SyncE / T-BC Models     Microsemi Semiconductor Corporation   Q13/15   2012-08-22
[ 1983 ]  
 
Move Metrics from G.8261 to G.8260     Microsemi Semiconductor Corporation   Q13/15   2012-08-22
[ 1982 ]  
 
Holdover Requirement [G.8263]     Microsemi Semiconductor Corporation   Q13/15   2012-08-22
[ 1981 ]  
 
Temperature Profile Appendix [G.8263]     Microsemi Semiconductor Corporation   Q13/15   2012-08-22
[ 1976 ]  
 
Example of changes to G.8021 to support enhanced holdover     Ciena Canada   Q13/15   2012-08-22
[ 1975 ]  
 
Further considerations on PRTC modelling     Ciena Canada   Q13/15   2012-08-22
[ 1973 ]  
 
Use of G.805 to model PRTC and BC clocks     Ciena Canada   Q13/15   2012-08-22
[ 1958 ]  
(Rev.1) 
G.8273.2: Discussion on text for Sections 6 through 9.     Calnex Solutions Limited   Q13/15   2012-08-15
[ 1948 ]  
(Rev.1) 
G.8273.3: Noise Error Definition for T-TC to control impact of traffic.     Calnex Solutions Limited , China Unicom   Q13/15   2012-08-08
[ 1947 ]  
(Rev.1) 
G.8273.2: T-BC Noise Error Definition to control impact of traffic.     Calnex Solutions Limited , China Unicom   Q13/15   2012-08-08
[ 1946 ]  
(Rev.1) 
G.8273.2: Phase Transient interface applicability.     Calnex Solutions Limited   Q13/15   2012-08-08
[ 1928 ]  
 
Measurement Methods for Phase/Time Clocks     Deutsche Telekom AG   Q13/15   2011-11-23
[ 1927 ]  
 
PTP and SyncE over OTN-ODU0     Deutsche Telekom AG   Q13/15   2011-11-23
[ 1926 ]  
 
G.8271: Minor editorial improvements     Deutsche Telekom AG   Q13/15   2011-11-23
[ 1925 ]  
 
G.8271 1pps interface performance specification     Deutsche Telekom AG , France Télécom Orange   Q13/15   2011-11-23
[ 1924 ]  
 
Additional Simulation Results of Packet Slave Clock Frequency Based Upon 2nd Order PLL     Tellabs Oy , France Télécom Orange   Q13/15   2011-11-22
[ 1916 ]  
(Rev.1) 
Parameter proposals for PTP time profile     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2011-11-22
[ 1915 ]  
(Rev.1) 
Proposal to remove Class A/ Class B metric classification from G.8260     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2011-11-22
[ 1911 ]  
(Rev.1) 
G.8263 holdover requirement/squelch     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2011-11-22
[ 1909 ]  
(Rev.1-2) 
PDV tolerance masks for HRM-1 and HRM-2     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2011-11-22
[ 1895 ]  
 
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented     France Télécom Orange   Q13/15   2011-11-22
[ 1894 ]  
 
G.8271: Editorial comments on latest draft     France Télécom Orange   Q13/15   2011-11-22
[ 1893 ]  
 
G.8263: Section 9 - PEC-S-F holdover     France Télécom Orange   Q13/15   2011-11-22
[ 1892 ]  
 
G.8263: Section 6 - PEC-S-F slave clock noise generation     France Télécom Orange   Q13/15   2011-11-22
[ 1891 ]  
 
G.8263: New Appendix discussing time constant values     France Télécom Orange   Q13/15   2011-11-22
[ 1890 ]  
 
G.8261.1: Notes on network equipments producing excessive PDV     France Télécom Orange   Q13/15   2011-11-22
[ 1889 ]  
 
G.8261.1: Editorial comments on latest draft     France Télécom Orange   Q13/15   2011-11-22
[ 1888 ]  
 
G.8260: Request for clarification about the MAFE corner point     France Télécom Orange   Q13/15   2011-11-22
[ 1887 ]  
 
G.8260: Comments on latest draft     France Télécom Orange   Q13/15   2011-11-22
[ 1886 ]  
 
Transport of CPRI interface over OTN     France Télécom Orange   Q13/15   2011-11-22
[ 1885 ]  
 
Proposal for reply to 3GPP liaison "Response to NGMN LS RP-110476 on coordination between ITU-T and 3GPP on synchronization"     France Télécom Orange   Q13/15   2011-11-22
[ 1884 ]  
 
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing     Calnex Solutions Limited , France Télécom Orange   Q13/15   2011-11-22
[ 1879 ]  
 
Performance analysis of IEEE1588v2 time distribution through OTN Client signals when power restart and board reset     China Telecommunications Corporation   Q13/15   2011-11-22
[ 1841 ]  
 
Proposal of RS422 1PPS time/phase as a time measurement interface     China , China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q13/15   2011-11-22
[ 1780 ]  
(Rev.1) 
Consideration on PTP over OTN solution options     Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2011-11-22
[ 1772 ]  
(Rev.1) 
Development of PTP time transport HRMs that encompass OTN     Alcatel-Lucent Italia S.p.A. , Huawei Technologies Co. Ltd.   Q13/15   2011-11-22
[ 1752 ]  
(Rev.1) 
JDSU Time Offset Measurement     JDSU Deutschland GmbH   Q13/15   2011-11-22
[ 1734 ]  
 
Status of Jitter/Wander Requirements and Performance for the Transport of SDI Video Clients over OTN     Huawei Technologies Co. Ltd.   Q13/15   2011-11-21
[ 1733 ]  
 
Rise time requirements of RS422 1PPS_OUT signal     Huawei Technologies Co. Ltd.   Q13/15   2011-11-21
[ 1730 ]  
 
Maximum FFO of the Output of a Second-Order PLL due to a Sinusoidal and Triangular Wave Input     France Télécom Orange , France Télécom Orange , Huawei Technologies Co. Ltd. , Iometrix, Inc.   Q13/15   2011-11-21
[ 1729 ]  
 
Initial Simulation Results for Transport of Time over the HRM2b chain of Boundary Clocks     France Télécom Orange , France Télécom Orange , Huawei Technologies Co. Ltd. , Iometrix, Inc.   Q13/15   2011-11-21
[ 1728 ]  
 
Detection and removal of Delay Jumps using FWPR and minMATIE     Huawei Technologies Co. Ltd.   Q13/15   2011-11-21
[ 1727 ]  
 
ESCON, Infiniband, and DVB_ASI Jitter Accumulation over OTN Islands     Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2011-11-21
[ 1726 ]  
 
Criterion for Minimum Detectable Floor Delay Step using minMATIE     Huawei Technologies Co. Ltd.   Q13/15   2011-11-21
Results:487 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-9-21