International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:487 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1041 ]  
 
Issues about metrics of network limits for time synchronization     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1040 ]  
 
Field test of 1588v2 time sync based on physical layer frequency sync support     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1039 ]  
 
Definition related to time/phase sync in G.8260     ZTE , CMCC   Q13/15   2010-05-20
[ 1038 ]  
 
Performance analysis of 1588v2 time/sync in field test     ZTE , CMCC   Q13/15   2010-05-20
[ 1037 ]  
 
1588v2 test results with different clock mode and field network     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1036 ]  
(Rev.1) 
Consideration on Phase/Time synchronization over OTN     ZTE   Q13/15, Q11/15   2010-05-20
[ 1025 ]  
 
Clarification on ODU Multiplexing     AT&T   Q13/15, Q12/15   2010-05-20
[ 1019 ]  
 
G.8251: OTN timing aspects     France Télécom   Q13/15, Q11/15   2010-05-20
[ 1017 ]  
 
Network PDV accumulation study     France Télécom   Q13/15   2010-05-20
[ 1001 ]  
 
Equivalence of the IEEE 1588 Boundary Clock and Peer-to-Peer Transparent Clock for Synchronization Transport     Huawei   Q13/15   2010-05-20
[ 995 ]  
 
Treatment of delay jumps in relation with MAFE/MATIE     Nokia Siemens Networks   Q13/15   2010-05-20
[ 994 ]  
 
Packet metrics applied to two-way delay patterns     Nokia Siemens Networks   Q13/15   2010-05-20
[ 993 ]  
 
Analysis of the floor delay window method     Nokia Siemens Networks   Q13/15   2010-05-20
[ 992 ]  
 
Applicability of MATIE as a phase stability metric     Nokia Siemens Networks   Q13/15   2010-05-20
[ 990 ]  
 
G.827x Slave Clock specification (for time)     Deutsche Telekom   Q13/15   2010-05-20
[ 989 ]  
 
Q13 Requirements structure for time supply (G.827x)     Deutsche Telekom   Q13/15   2010-05-20
[ 988 ]  
 
Input for G.827x Slave clock specification     Deutsche Telekom   Q13/15   2010-05-20
[ 987 ]  
 
SyncE Jitter tolerance (high frequency)     Deutsche Telekom   Q13/15   2010-05-20
[ 986 ]  
 
G.8265.1: Clarifications on the Telecom slave model with multiple slave-only OC instances     France Télécom   Q13/15   2010-05-20
[ 985 ]  
 
G.8265.1: Proposal for the PTP master selection process by a PTP slave in the PTPv2 telecom profile frequency-oriented     France Télécom   Q13/15   2010-05-20
[ 980 ]  
 
Proposal for Desynchronizer Bandwidths, GMP Mapping Granularities, and Mapper Buffer Hysteresis Values for new OTN clients and ODUs, for ITU-T Recommendations G.8251and G.798     Huawei , Alcatel-Lucent Germany   Q9/15, Q13/15   2010-05-20
[ 978 ]  
 
Applicability of Jitter Requirements for SyncE interfaces     Calnex Solutions   Q13/15   2010-05-20
[ 977 ]  
 
Transport of accurate Time Synchronization over access technologies     Ericsson   Q4/15, Q2/15, Q13/15   2010-05-20
[ 976 ]  
 
Proposal for ODCb Transient Response for G.8251 Section A.8, to Reflect New CBR Clients having ±100 ppm Frequency Tolerance     Huawei , Alcatel-Lucent Germany   Q13/15   2010-05-19
[ 972 ]  
 
Further Analysis of RMS Frequency Offset for a CPRI Client Transported over OTN     Huawei   Q13/15   2010-05-19
[ 970 ]  
 
Timing Transparency over OTN     Alcatel-Lucent Germany   Q13/15, Q11/15   2010-05-19
[ 969 ]  
 
New Results for Serial Digital Interface Video Client Jitter and Wander Accumulation over OTN Islands     Huawei   Q13/15   2010-05-19
[ 967 ]  
 
Additional Simulation Results for Peak-to-Peak Phase and RMS Frequency Offset for Transport of a CPRI Client over OTN     Huawei   Q13/15   2010-05-19
[ 966 ]  
 
Proposed jitter tolerance specifications for G.8262     JDSU   Q13/15   2010-05-19
[ 965 ]  
 
Further Simulation Results for syncE and STM-1 Jitter and Wander Accumulation over Networks of OTN Islands     Huawei   Q13/15   2010-05-19
[ 963 ]  
 
Fibre Channel and Infiniband Jitter Accumulation over OTN Islands     Huawei   Q13/15, Q11/15   2010-05-19
[ 959 ]  
 
Time and Phase Sync Interfaces (G.8271)     Ericsson   Q13/15   2010-05-19
[ 949 ]  
 
Mapping method to support timing over OTN     Huawei   Q13/15, Q11/15   2010-05-19
[ 948 ]  
 
Implementation analysis of timing over OTN     Huawei   Q13/15, Q11/15   2010-05-19
[ 939 ]  
 
Time Synchronization Telecom Profiles     Ericsson   Q13/15   2010-05-19
[ 905 ]  
 
Telecom Slave - State Machine Operations     Huawei   Q13/15   2010-05-18
[ 904 ]  
 
G.827x Recommendations - High-Level Objectives     Huawei , CATR , MII   Q13/15   2010-05-18
[ 903 ]  
 
Pulse-Per-Second Interface     Huawei , CATR , China Mobile Communications Corporation , MII   Q13/15   2010-05-18
[ 902 ]  
 
PTP Profile Data Set Members     Huawei   Q13/15   2010-05-18
[ 901 ]  
 
G.8264 ESMC Processing for G.8011.x Ethernet Services Types     Huawei   Q13/15, Q10/15   2010-05-18
[ 900 ]  
 
Comments and Editorial Remarks for G.8265.1     Huawei   Q13/15, Q10/15   2010-05-18
[ 899 ]  
 
Updated Telecom Slave Model     Huawei , France Télécom   Q13/15   2010-05-18
[ 898 ]  
 
Flag Fields     Huawei   Q13/15   2010-05-18
[ 897 ]  
 
Test Results of IEEE1588v2 hop-by-hop time synchronization using Boundary Clocks     Huawei , China Mobile Communications Corporation   Q13/15   2010-05-18
[ 896 ]  
 
The use of SyncE and IEEE1588v2 for Time Distribution     Huawei , China Mobile Communications Corporation   Q13/15   2010-05-18
[ 895 ]  
 
ESMC Transport over GPON     Huawei , BT   Q2/15, Q13/15   2010-05-18
[ 894 ]  
 
G.8264 Amendment: editorial comments regarding the use of physical methods to deliver timing in a multi-operator context     Huawei , France Télécom   Q13/15   2010-05-18
[ 893 ]  
 
Usage of PTP domain number for the time-profile     Huawei   Q13/15   2010-05-18
[ 876 ]  
 
Issues with the Transparent Clock concept of PTPv2 in a telecom environment     France Télécom   Q4/15, Q2/15, Q13/15   2010-05-18
[ 875 ]  
 
Architecture for phase and time distribution     France Télécom   Q4/15, Q2/15, Q13/15   2010-05-18
Results:487 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-9-23