International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:487 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
Contributions  [ Questions: Q13/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 2384 ]  
(Rev.1) 
2012-08-28 Tellabs Oy   Boundary clock in networks and simulations     Q13/15  
[ 2383 ]  
(Rev.1) 
2012-08-28 Tellabs Oy   Boundary clock simulation model     Q13/15  
[ 2381 ]  
(Rev.1) 
2012-08-28 Tellabs Oy   G.8265.1 supported duration of negotiated service     Q13/15  
[ 2375 ]  
 
2012-08-28 Nokia Siemens Networks GmbH & Co. KG   Cooperation of G.781 and BMCA in telecom profile for time     Q13/15  
[ 2374 ]  
 
2012-08-28 Nokia Siemens Networks GmbH & Co. KG   PDV test pattern for G.8263     Q13/15  
[ 2362 ]  
 
2012-08-28 France Télécom Orange   Scope of G.8275.1     Q13/15  
[ 2361 ]  
 
2012-08-28 France Télécom Orange   Review of G.8272 latest draft     Q13/15  
[ 2360 ]  
 
2012-08-28 France Télécom Orange   G.8272: New Appendix describing possible PRTC locations     Q13/15  
[ 2359 ]  
 
2012-08-28 France Télécom Orange   Results of PDV tolerance testing using sinusoidal patterns as defined in G.8263-Testing     Q13/15  
[ 2358 ]  
 
2012-08-28 France Télécom Orange   G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing     Q13/15  
[ 2357 ]  
 
2012-08-28 France Télécom Orange   Development of a new Appendix of G.8261.1 on PDV generation testing     Q13/15  
[ 2344 ]  
 
2012-08-28 RAD Data Communications, Ltd.   Consequence of floor delay changes under tight PLL bandwidth     Q13/15  
[ 2343 ]  
 
2012-08-28 Huawei Technologies Co. Ltd.   The TVL of Signaling message     Q13/15  
[ 2341 ]  
 
2012-08-28 Huawei Technologies Co. Ltd.   The effect of MAC control pause operation for PTP synchronization     Q13/15  
[ 2340 ]  
 
2012-08-28 Huawei Technologies Co. Ltd.   Test error of PRTC     Q13/15  
[ 2339 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   PHY and intra-node noise error     Q13/15  
[ 2338 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Analysis about SyncE rearrangement for different message delays of G.781     Q13/15  
[ 2276 ]  
 
2012-08-28 China Unicom   Concerns regarding the packet selection methods for the PEC     Q13/15  
[ 2275 ]  
 
2012-08-28 China Unicom   Proposals for specifying relative aspects of T-BC recommended in G.8273.2     Q13/15  
[ 2274 ]  
 
2012-08-28 China Unicom   G.8273.3: Proposals about the functions of T-TC devices based on experimental results     Q13/15  
[ 2245 ]  
 
2012-08-28 Huawei Technologies Co. Ltd. , Huawei Technologies Co. Ltd.   DVB_ASI Jitter Accumulation over OTN Islands     Q9/15, Q13/15  
[ 2244 ]  
 
2012-08-28 Huawei Technologies Co. Ltd. , Huawei Technologies Co. Ltd.   Criterion for Minimum Detectable Floor Delay Step using minMATIE     Q13/15  
[ 2243 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Effect of Turnaround on Time Transport Performance using PTP     Q13/15  
[ 2242 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Advantages of the Pdelay Mechanism in Time Transport using PTP for the case where SyncE is not Used for Frequency Transport     Q13/15  
[ 2241 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Discussion of T-BC/T-TSC Noise Generation for Phase/Time Synchronization using PTP without SyncE Support     Q13/15  
[ 2240 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Analysis of Protection Scenario 1 for Phase/Time Synchronization, for the Case of a Shorter SyncE Reference Chain     Q13/15  
[ 2239 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Further Discussion of BMCA Requirements for the Phase/Time PTP Telecom Profile, and Example Alternate BMCAs     Q13/15  
[ 2238 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths, with SyncE Transients Slowed Down by T-BCs and T-TSC, and Conclusions on Mitigation of Effect of the Rearrangement     Q13/15  
[ 2237 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Analysis of HRM2b SyncE Rearrangement with SyncE Transients Slowed Down by T-BCs     Q13/15  
[ 2235 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd. , Iometrix   Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths     Q13/15  
[ 2212 ]  
 
2012-08-28 Aviat Networks , Calnex Solutions Limited , Juniper Networks , Sprint , Vitesse Semiconductor Corporation   Transparent Clocks and Issues Around Perceived Layer Violations [G.8275.1]     Q13/15  
[ 2195 ]  
 
2012-08-27 Rakon Limited   Variable temperature test regime     Q13/15  
[ 2194 ]  
 
2012-08-27 Rakon Limited   G.8263 Clarification     Q13/15  
[ 2172 ]  
 
2012-08-27 China Mobile Communications Corporation , ZTE Corporation   Time sync architecture based on multiple PTP domains     Q13/15  
[ 2171 ]  
 
2012-08-27 China Mobile Communications Corporation , ZTE Corporation   Hold-off time and interactions between frequency and phase-time planes     Q13/15  
[ 2170 ]  
 
2012-08-27 China Mobile Communications Corporation , ZTE Corporation   A possible solution for multiple GMs and operator intervention     Q13/15  
[ 2169 ]  
 
2012-08-27 China Mobile Communications Corporation , ZTE Corporation   Sync OAM architecture and requirements     Q13/15  
[ 2168 ]  
 
2012-08-27 ZTE Corporation   Further analysis about BMCA of time profile     Q13/15  
[ 2167 ]  
 
2012-08-27 ZTE Corporation   The mapping between ToD and PTP     Q13/15  
[ 2155 ]  
 
2012-08-27 ZTE Corporation   Analysis of interactive mechanism between two layers     Q13/15  
[ 2143 ]  
 
2012-08-27 Calnex Solutions Limited , Deutsche Telekom AG   G.8273: Test methodology annex/appendix     Q13/15  
[ 2106 ]  
 
2012-08-26 ADVA Optical Networking   Architecture Considerations for Time Distribution     Q13/15  
[ 2105 ]  
 
2012-08-26 ADVA Optical Networking   G.8261.1 Network limits     Q13/15  
[ 2104 ]  
 
2012-08-26 ADVA Optical Networking   PTP Network Probe and PTP Clock Probe     Q13/15  
[ 2103 ]  
 
2012-08-26 China Mobile Communications Corporation   Exact PTP clockclass values in application     Q13/15  
[ 2102 ]  
 
2012-08-26 China Mobile Communications Corporation   Proposal on PTP multicast MAC address in 8275.1     Q13/15  
[ 2101 ]  
 
2012-08-26 China Mobile Communications Corporation   Test and analysis of time synchronization using 1588v2 in 100G OTN long haul transport network     Q13/15  
[ 2100 ]  
 
2012-08-26 China Mobile Communications Corporation   Coordinate mechanism for SyncE and PTP     Q13/15  
[ 2095 ]  
 
2012-08-25 SymmetriCom, Inc.   PRTC Timing Signal Variation for a Particular Design     Q13/15  
[ 2087 ]  
 
2012-08-25 PMC-Sierra, Inc.   Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes     Q9/15, Q14/15, Q13/15, Q11/15  
Results:487 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-6-28