International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:170 total items.
Result page:   -  1 - 2 - 3 - 4  - Next Next
Contributions  [ AI/Question: Q12/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1881 ]  
 
Transport Entity Role Examples     Huawei Technologies Co. Ltd.   Q12/15   2011-11-22
[ 1871 ]  
 
Comments on draft revised G.872     Deutsche Telekom AG   Q12/15   2011-11-22
[ 1869 ]  
(Rev.1) 
Proposal for a new recommendation G.wavereuse based on wavelength re-use     Finisar Corporation , LG-Ericsson , Telefon AB - LM Ericsson   Q6/15, Q2/15, Q12/15, Q11/15   2011-11-22
[ 1867 ]  
(Rev.1) 
Ciena's views on Progressing work on Recs. G.8113.1 and G.8113.2     Ciena Corporation   Q12/15   2011-11-22
[ 1858 ]  
 
Black Link related amendments to G.872     Deutsche Telekom AG   Q12/15   2011-11-22
[ 1857 ]  
 
Architectural models of OTN transport services     Deutsche Telekom AG   Q12/15   2011-11-22
[ 1847 ]  
 
China Propose to make progress on MPLS-TP OAM Standardization     China   Q9/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1844 ]  
 
Requirements for L0/L1/L2 Multi-layer Convergence Network     China , China Mobile Communications Corporation   Q9/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1843 ]  
 
G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results     China , China Mobile Communications Corporation   Q9/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1822 ]  
(Rev.1) 
Considerations about PTN and PSN applications for MPLS-TP     Italy   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1821 ]  
(Rev.2) 
Considerations about collaboration between ITU-T and IETF on MPLS-TP     Italy   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1818 ]  
(Rev.1) 
Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics     Huawei Technologies Co. Ltd.   Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15   2011-11-22
[ 1776 ]  
 
Multi layer optimization alternatives associated with Ethernet Service support     Huawei Technologies Co. Ltd.   Q12/15   2011-11-22
[ 1763 ]  
(Rev.1) 
Consideration on the use of a new Ethertype for MPLS-TP     Huawei Technologies Co. Ltd. , ZTE Corporation   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1756 ]  
(Rev.1) 
MPLS-TP OAM Recommendations - Proposed way forward     Japan   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1754 ]  
(Rev.1) 
Proposal of new recommendation on multi layer converged transport network (G.mlctn)     ZTE Corporation   Q9/15, Q14/15, Q12/15, Q11/15, Q10/15   2011-11-22
[ 1753 ]  
(Rev.1) 
Draft of multi layer converged network informative document     ZTE Corporation   Q9/15, Q14/15, Q12/15, Q11/15, Q10/15   2011-11-22
[ 1744 ]  
(Rev.1) 
Requirement for communication latency, latency variation and loss as traffic engineering performance metrics in ASON     ZTE Corporation   Q14/15, Q12/15   2011-11-22
[ 1719 ]  
 
Maintaining the functional model of the OTN in G.872     Germany   Q12/15   2011-11-21
[ 1717 ]  
(Rev.1) 
Progressing MPLS-TP OAM, Equipment, and Management Recommendations     Alcatel-Lucent USA Inc.   Q9/15, Q12/15, Q10/15   2011-11-21
[ 1694 ]  
 
Withdrawn, duplicate of C-1843 - G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results  
Withdrawn
 
China , China Mobile Communications Corporation   Q9/15, Q14/15, Q12/15, Q10/15   2011-11-21
[ 1690 ]  
(Rev.1) 
Proposal to study the convergence of PON and transport network in the next study period     ZTE Corporation   Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-11-21
[ 1689 ]  
(Rev.1) 
Proposal to study the convergence of optical and packet in the next study period     ZTE Corporation   Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2011-11-21
[ 1688 ]  
(Rev.1) 
Proposal for joint discussion about flexible grid network     ZTE Corporation   Q9/15, Q6/15, Q14/15, Q12/15, Q11/15   2011-11-21
[ 1623 ]  
 
Elaboration on G.8110.1 AAP Comment Regarding Uniform Model Text     Cisco Systems, Inc. , Ericsson, Inc. , Extreme Networks   Q9/15, Q12/15   2011-11-20
[ 1610 ]  
(Rev.1) 
Management of G.872 v2 (aon)     Ciena Corporation   Q14/15, Q12/15   2011-11-19
[ 1594 ]  
(Rev.1) 
Progress on G.8021.1     Ciena Corporation   Q9/15, Q12/15   2011-11-18
[ 1593 ]  
(Rev.1) 
Editing of G.8010 V2     Ciena Corporation   Q12/15   2011-11-18
[ 1592 ]  
(Rev.1) 
E-OTN work overlap among Questions     Ciena Corporation   Q9/15, Q12/15, Q10/15   2011-11-18
[ 1573 ]  
(Rev.1) 
Flexible Rate OTU signal     Finisar Corporation , Infinera Corporation , Verizon Communication Corporation   Q6/15, Q12/15, Q11/15   2011-11-18
[ 1568 ]  
 
Proposal and Comments on MPLS-TP     Cisco Systems, Inc. , Ericsson, Inc. , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-11-18
[ 1542 ]  
(Rev.1) 
G.8080 - SP10 - Call Routing Discussion     Ciena Canada   Q14/15, Q12/15   2011-11-17
[ 1527 ]  
(Rev.1-3) 
Standardization of optical switching (photonic sub-lambda switching)     France Télécom Orange , Portugal Telecom, SGPS, S.A. , Swisscom SA , Telecom Italia S.p.A. , Telefónica, S.A. , Telstra Corporation Ltd. , Verizon Communication Corporation   Q12/15   2011-11-15
[ 1518 ]  
 
Structuring of MPLS-TP Recommendations     Telefónica Investigación y Desarrollo   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-11
[ 1496 ]  
 
Multilayer SCN Issues     Ciena Corporation   Q14/15, Q12/15   2011-02-02
[ 1495 ]  
 
G.8080 - SP10 - call routing     Ciena Corporation   Q14/15, Q12/15   2011-02-02
[ 1494 ]  
 
G.8080 and multi-layer topology     Ciena Corporation   Q12/15   2011-02-02
[ 1491 ]  
 
Editing of G.8010 V2     Ciena Corporation   Q12/15   2011-02-02
[ 1468 ]  
 
Transitional Link attributes for optical transponders and 3R regenerators in the OTN     Alcatel-Lucent   Q14/15, Q12/15   2011-02-02
[ 1461 ]  
 
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications"     NSN   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1449 ]  
 
Further consideration of requirements for on-demand segment monitoring in MPLS-TP     NTT , Telecom Italia   Q12/15, Q10/15   2011-02-02
[ 1448 ]  
 
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP     NTT   Q12/15, Q10/15   2011-02-02
[ 1445 ]  
 
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions     ISOC   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1441 ]  
 
Withdrawn: MPLS-TP Standards     BT   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1439 ]  
 
Comments on differentiation of MPLS-TP environments     NSN   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1396 ]  
 
Relation between G.aon and G.872     Deutsche Telekom   Q12/15   2011-02-01
[ 1395 ]  
 
WCh clients in draft G.aon     Deutsche Telekom   Q12/15   2011-02-01
[ 1394 ]  
 
Properties of a Wavelength Channel in draft G.aon     Deutsche Telekom   Q12/15   2011-02-01
[ 1385 ]  
 
Support for the consent of G.8110.1 and G.tpoam     Italy   Q12/15, Q10/15   2011-02-01
[ 1384 ]  
 
Structure and content of the MPLS-TP Recommendations     Telecom Italia   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
Results:170 total items.
Result page:   -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-13