International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 1440 ]  
 
2011-02-02 Huawei   Second generation ETH MEP and MIP functions     Q9/15  
[ 1439 ]  
 
2011-02-02 NSN   Comments on differentiation of MPLS-TP environments     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1438 ]  
 
2011-02-02 Alcatel-Lucent Bell N.V.   G.gen: G.vdsl: G.ploam: Ambiguity of SES and UAS during re-initialization     Q4/15  
[ 1437 ]  
 
2011-02-02 Alcatel-Lucent Bell N.V.   G.vdsl: Re-Initialization Policies: Proposed changes to working text for G.993.2     Q4/15  
[ 1436 ]  
 
2011-02-02 NSN   Control elements for BMCA in telecom     Q13/15  
[ 1435 ]  
 
2011-02-02 NSN   MATIE, MTIE, and MAFE graphs into metrics definitions     Q13/15  
[ 1434 ]  
 
2011-02-02 CopperGate Communications   A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications"     Q4/15  
[ 1433 ]  
 
2011-02-02 CopperGate Communications   G.hn: Proposed Annex for extension of G.hn for optical transmission media     Q4/15  
[ 1432 ]  
 
2011-02-02 CopperGate Communications   G.hn: Backup Domain master related corrigendum items for G.9961     Q4/15  
[ 1431 ]  
 
2011-02-02 CopperGate Communications   G.hn: Corrigendum items for G.9961     Q4/15  
[ 1430 ]  
 
2011-02-02 CopperGate Communications   G.hn: Update of the text for the "symbol boosting" mechanism     Q4/15  
[ 1429 ]  
 
2011-02-02 CopperGate Communications   G.hn: Orthogonal preambles for the Neighbour domain interference mitigation (NDIM) mechanism     Q4/15  
[ 1428 ]  
 
2011-02-02 CopperGate Communications   G.hn: MIMO transmission scheme for PHY frames and signals other than 'frames where the payload is intended only for MIMO receivers', for G.hn-MIMO     Q4/15  
[ 1427 ]  
 
2011-02-02 CopperGate Communications   G.hn: Update of the "modulation of unloaded subcarriers" text of G.hn-MIMO     Q4/15  
[ 1426 ]  
 
2011-02-02 CopperGate Communications   G.hn: Channel estimation protocol for G.hn-MIMO     Q4/15  
[ 1425 ]  
 
2011-02-02 CopperGate Communications   G.hn: Update of the text of 'Tx ports mapping' for G.hn-MIMO     Q4/15  
[ 1424 ]  
 
2011-02-02 NSN   Treatment of delay jumps in PDV data     Q13/15  
[ 1423 ]  
 
2011-02-01 BT   Draft baseline text describing the Alternative Electrical Length Estimation Method (AELEM)     Q4/15  
[ 1422 ]  
 
2011-02-01 BT   G.adsl: G.vdsl : Low Power Modes for Remote VDSL2 Nodes     Q4/15  
[ 1421 ]  
 
2011-02-01 BT   G.VDSL: INM INPEQ Histogram     Q4/15  
[ 1420 ]  
 
2011-02-01 Huawei   Functional model of HAO     Q9/15, Q11/15  
[ 1419 ]  
 
2011-02-01 BT   G.VDSL: INM IAT Histogram     Q4/15  
[ 1418 ]  
 
2011-02-01 Calnex Solutions   Dealing with multiple criteria of packet selection     Q13/15  
[ 1417 ]  
 
2011-02-01 BT   G.LT: PSD Shaped SELT     Q4/15  
[ 1416 ]  
 
2011-02-01 ETRI   Modifications for draft G.798.1 (TD 379/P)     Q9/15  
[ 1415 ]  
 
2011-02-01 ETRI   Proposed modification on OTM-0.mvn in G.798     Q9/15  
[ 1414 ]  
 
2011-02-01 ETRI   Proposal for addition of HO OPU mapping types in G.709     Q11/15  
[ 1413 ]  
 
2011-02-01 ETRI   Proposed modification of G.709 (12/2009) Appendix XII for inclusion in G.709 Amendment 2     Q11/15  
[ 1412 ]  
 
2011-02-01 ETRI   Addition of new Appendix/G.7041 for ODUflex(GFP) packet data throughput     Q11/15  
[ 1411 ]  
 
2011-02-01 Marvell Semiconductor   Fixes in the recommendation to deal with multicast traffic     Q4/15  
[ 1410 ]  
 
2011-02-01 Marvell Semiconductor   G.hn: Proposal for Channel Estimation bandwidth reservation     Q4/15  
[ 1409 ]  
 
2011-02-01 Marvell Semiconductor   Bandwidth allocation protocol     Q4/15  
[ 1408 ]  
 
2011-02-01 Marvell Semiconductor   Proposal for Corrigendum (Geneva meeting) - analyzing different fixes to the current approved versions of G.9960 and G.9961     Q4/15  
[ 1407 ]  
 
2011-02-01 Ministry of Communications (Israel (State of))   G.vdsl: End to End Model and Precision requirements from ToD over VDSL2     Q4/15  
[ 1406 ]  
 
2011-02-01 A.T. Communication Channels , Ericsson   OMCI Tip-Ring Test Result for POTS UNI     Q2/15  
[ 1405 ]  
 
2011-02-01 A.T. Communication Channels , Ericsson   OMCI updates for Vendor-specific Test Parameters     Q2/15  
[ 1404 ]  
 
2011-02-01 A.T. Communication Channels , Alcatel-Lucent , Ericsson   Enabling variable message length in extended message format     Q2/15  
[ 1403 ]  
 
2011-02-01 BT   G.gen: G.hn: G.vdsl: Reference Modelling for FTTdp Final Drops - For Information     Q4/15  
[ 1402 ]  
 
2011-02-01 BT   G.gen: G.hn: G.vdsl: RF Ingress above 30 MHz - For Information     Q4/15  
[ 1401 ]  
 
2011-02-01 NTT   Improvement of Annex E/G.709 (40GbE/100GbE transport over OTN)     Q9/15, Q11/15  
[ 1400 ]  
 
2011-02-01 Ericsson   Time Error Budget in the Base Stations and considerations on the rearrangements in the time synchronization network     Q13/15  
[ 1399 ]  
 
2011-02-01 Alcatel-Lucent   Specification of DPSK demodulator or delay line interferometer towards revised G.671     Q7/15  
[ 1398 ]  
 
2011-02-01 Alcatel-Lucent   Considerations on flexible grids     Q6/15  
[ 1397 ]  
 
2011-02-01 Alcatel-Lucent   Progress on standardization of P-DPSK modulation format     Q6/15  
[ 1396 ]  
 
2011-02-01 Deutsche Telekom   Relation between G.aon and G.872     Q12/15  
[ 1395 ]  
 
2011-02-01 Deutsche Telekom   WCh clients in draft G.aon     Q12/15  
[ 1394 ]  
 
2011-02-01 Deutsche Telekom   Properties of a Wavelength Channel in draft G.aon     Q12/15  
[ 1393 ]  
 
2011-02-01 BT   G.INP: VDSL2 will require retransmission upstream     Q4/15  
[ 1392 ]  
 
2011-02-01 Deutsche Telekom   BBER objectives in Recommendation G.8201     Q9/15  
[ 1391 ]  
 
2011-02-01 BT   Synchronisation Budget     Q13/15  
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21