International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 1465 ]  
(Rev.1) 
2011-02-02 United States of America   USA on Consent of Draft Recommendation G.tpoam     Q10/15  
[ 1464 ]  
 
2011-02-02 Lantiq AEG   G.hnem: Informative Appendix to describe use cases and installation examples     Q4/15  
[ 1463 ]  
 
2011-02-02 Deutsche Telekom   Wavelength conversion in reconfigurable multi-degree optical nodes     Q7/15  
[ 1462 ]  
 
2011-02-02 Deutsche Telekom   Considerations on transverse compatibility for systems according to G.698.2     Q6/15  
[ 1461 ]  
 
2011-02-02 NSN   Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications"     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1460 ]  
 
2011-02-02 CopperGate Communications   G.gen: G.vdsl: G.hn: On the feasibility of a low complexity G.hn based FTTdp solution     Q4/15  
[ 1459 ]  
 
2011-02-02 France Telecom , Tellabs   G.8260: comments on WD107 from Edinburgh interim meeting (PDV metrics)     Q13/15  
[ 1458 ]  
 
2011-02-02 France Telecom   Network PDV accumulation study with "end-to-end" data traffic model     Q13/15  
[ 1457 ]  
 
2011-02-02 France Telecom   G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented     Q13/15  
[ 1456 ]  
 
2011-02-02 France Telecom   G.8272: comments on PRTC limits proposal     Q13/15  
[ 1455 ]  
 
2011-02-02 France Telecom   G.8263: testing methodology for the PDV tolerance of a packet slave clock     Q13/15  
[ 1454 ]  
 
2011-02-02 France Telecom   G.8261.1: Hypothetical Reference Models proposal     Q13/15  
[ 1453 ]  
 
2011-02-02 France Telecom   G.8261.1: Preliminary proposal of PDV network limits for the HRM-1     Q13/15  
[ 1452 ]  
 
2011-02-02 France Telecom   Possible locations of external phase/time interfaces in a phase/time distribution chain based on Boundary Clocks     Q13/15  
[ 1451 ]  
 
2011-02-02 France Telecom   Analysis of phase/time distribution over OTN networks     Q9/15, Q13/15, Q11/15  
[ 1450 ]  
 
2011-02-02 France Telecom   Proposal of a Working Document from Q13 to Q2, Q4 and Q11 reflecting the current status of the work in Q13 on phase/time synchronization     Q13/15  
[ 1449 ]  
 
2011-02-02 NTT , Telecom Italia   Further consideration of requirements for on-demand segment monitoring in MPLS-TP     Q12/15, Q10/15  
[ 1448 ]  
 
2011-02-02 NTT   Consideration and proposal for resolving issue of OAM solutions in MPLS-TP     Q12/15, Q10/15  
[ 1447 ]  
 
2011-02-02 NTT   Proposal for additional delay measurement functions in MPLS-TP OAM     Q9/15, Q14/15, Q10/15  
[ 1446 ]  
 
2011-02-02 NTT   Proposal of adding topic of Timing and Synchronization Aspects of Packet Networks in OTNT SWP     Q3/15, Q13/15  
[ 1445 ]  
 
2011-02-02 ISOC   Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1444 ]  
 
2011-02-02 CopperGate Communications   G.hn: corrections to Tunnel termination for a corrigendum to G.9961     Q4/15  
[ 1443 ]  
 
2011-02-02 CopperGate Communications   G.hn: Handling multicast traffic in G.hn     Q4/15  
[ 1442 ]  
 
2011-02-02 CopperGate Communications   G.hn: Differentiate between DLL multicast traffic and PHY multicast traffic in G.hn     Q4/15  
[ 1441 ]  
 
2011-02-02 BT   Withdrawn: MPLS-TP Standards     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1440 ]  
 
2011-02-02 Huawei   Second generation ETH MEP and MIP functions     Q9/15  
[ 1439 ]  
 
2011-02-02 NSN   Comments on differentiation of MPLS-TP environments     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1438 ]  
 
2011-02-02 Alcatel-Lucent Bell N.V.   G.gen: G.vdsl: G.ploam: Ambiguity of SES and UAS during re-initialization     Q4/15  
[ 1437 ]  
 
2011-02-02 Alcatel-Lucent Bell N.V.   G.vdsl: Re-Initialization Policies: Proposed changes to working text for G.993.2     Q4/15  
[ 1436 ]  
 
2011-02-02 NSN   Control elements for BMCA in telecom     Q13/15  
[ 1435 ]  
 
2011-02-02 NSN   MATIE, MTIE, and MAFE graphs into metrics definitions     Q13/15  
[ 1434 ]  
 
2011-02-02 CopperGate Communications   A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications"     Q4/15  
[ 1433 ]  
 
2011-02-02 CopperGate Communications   G.hn: Proposed Annex for extension of G.hn for optical transmission media     Q4/15  
[ 1432 ]  
 
2011-02-02 CopperGate Communications   G.hn: Backup Domain master related corrigendum items for G.9961     Q4/15  
[ 1431 ]  
 
2011-02-02 CopperGate Communications   G.hn: Corrigendum items for G.9961     Q4/15  
[ 1430 ]  
 
2011-02-02 CopperGate Communications   G.hn: Update of the text for the "symbol boosting" mechanism     Q4/15  
[ 1429 ]  
 
2011-02-02 CopperGate Communications   G.hn: Orthogonal preambles for the Neighbour domain interference mitigation (NDIM) mechanism     Q4/15  
[ 1428 ]  
 
2011-02-02 CopperGate Communications   G.hn: MIMO transmission scheme for PHY frames and signals other than 'frames where the payload is intended only for MIMO receivers', for G.hn-MIMO     Q4/15  
[ 1427 ]  
 
2011-02-02 CopperGate Communications   G.hn: Update of the "modulation of unloaded subcarriers" text of G.hn-MIMO     Q4/15  
[ 1426 ]  
 
2011-02-02 CopperGate Communications   G.hn: Channel estimation protocol for G.hn-MIMO     Q4/15  
[ 1425 ]  
 
2011-02-02 CopperGate Communications   G.hn: Update of the text of 'Tx ports mapping' for G.hn-MIMO     Q4/15  
[ 1424 ]  
 
2011-02-02 NSN   Treatment of delay jumps in PDV data     Q13/15  
[ 1423 ]  
 
2011-02-01 BT   Draft baseline text describing the Alternative Electrical Length Estimation Method (AELEM)     Q4/15  
[ 1422 ]  
 
2011-02-01 BT   G.adsl: G.vdsl : Low Power Modes for Remote VDSL2 Nodes     Q4/15  
[ 1421 ]  
 
2011-02-01 BT   G.VDSL: INM INPEQ Histogram     Q4/15  
[ 1420 ]  
 
2011-02-01 Huawei   Functional model of HAO     Q9/15, Q11/15  
[ 1419 ]  
 
2011-02-01 BT   G.VDSL: INM IAT Histogram     Q4/15  
[ 1418 ]  
 
2011-02-01 Calnex Solutions   Dealing with multiple criteria of packet selection     Q13/15  
[ 1417 ]  
 
2011-02-01 BT   G.LT: PSD Shaped SELT     Q4/15  
[ 1416 ]  
 
2011-02-01 ETRI   Modifications for draft G.798.1 (TD 379/P)     Q9/15  
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21