Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1465 ]
(Rev.1) |
USA on Consent of Draft Recommendation G.tpoam
|
United States of America
|
Q10/15
|
2011-02-02 |
|
[ 1464 ]
|
G.hnem: Informative Appendix to describe use cases and installation examples
|
Lantiq AEG
|
Q4/15
|
2011-02-02 |
|
[ 1463 ]
|
Wavelength conversion in reconfigurable multi-degree optical nodes
|
Deutsche Telekom
|
Q7/15
|
2011-02-02 |
|
[ 1462 ]
|
Considerations on transverse compatibility for systems according to G.698.2
|
Deutsche Telekom
|
Q6/15
|
2011-02-02 |
|
[ 1461 ]
|
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications"
|
NSN
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-02 |
|
[ 1460 ]
|
G.gen: G.vdsl: G.hn: On the feasibility of a low complexity G.hn based FTTdp solution
|
CopperGate Communications
|
Q4/15
|
2011-02-02 |
|
[ 1459 ]
|
G.8260: comments on WD107 from Edinburgh interim meeting (PDV metrics)
|
France Telecom
,
Tellabs
|
Q13/15
|
2011-02-02 |
|
[ 1458 ]
|
Network PDV accumulation study with "end-to-end" data traffic model
|
France Telecom
|
Q13/15
|
2011-02-02 |
|
[ 1457 ]
|
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented
|
France Telecom
|
Q13/15
|
2011-02-02 |
|
[ 1456 ]
|
G.8272: comments on PRTC limits proposal
|
France Telecom
|
Q13/15
|
2011-02-02 |
|
[ 1455 ]
|
G.8263: testing methodology for the PDV tolerance of a packet slave clock
|
France Telecom
|
Q13/15
|
2011-02-02 |
|
[ 1454 ]
|
G.8261.1: Hypothetical Reference Models proposal
|
France Telecom
|
Q13/15
|
2011-02-02 |
|
[ 1453 ]
|
G.8261.1: Preliminary proposal of PDV network limits for the HRM-1
|
France Telecom
|
Q13/15
|
2011-02-02 |
|
[ 1452 ]
|
Possible locations of external phase/time interfaces in a phase/time distribution chain based on Boundary Clocks
|
France Telecom
|
Q13/15
|
2011-02-02 |
|
[ 1451 ]
|
Analysis of phase/time distribution over OTN networks
|
France Telecom
|
Q9/15, Q13/15, Q11/15
|
2011-02-02 |
|
[ 1450 ]
|
Proposal of a Working Document from Q13 to Q2, Q4 and Q11 reflecting the current status of the work in Q13 on phase/time synchronization
|
France Telecom
|
Q13/15
|
2011-02-02 |
|
[ 1449 ]
|
Further consideration of requirements for on-demand segment monitoring in MPLS-TP
|
NTT
,
Telecom Italia
|
Q12/15, Q10/15
|
2011-02-02 |
|
[ 1448 ]
|
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP
|
NTT
|
Q12/15, Q10/15
|
2011-02-02 |
|
[ 1447 ]
|
Proposal for additional delay measurement functions in MPLS-TP OAM
|
NTT
|
Q9/15, Q14/15, Q10/15
|
2011-02-02 |
|
[ 1446 ]
|
Proposal of adding topic of Timing and Synchronization Aspects of Packet Networks in OTNT SWP
|
NTT
|
Q3/15, Q13/15
|
2011-02-02 |
|
[ 1445 ]
|
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions
|
ISOC
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-02 |
|
[ 1444 ]
|
G.hn: corrections to Tunnel termination for a corrigendum to G.9961
|
CopperGate Communications
|
Q4/15
|
2011-02-02 |
|
[ 1443 ]
|
G.hn: Handling multicast traffic in G.hn
|
CopperGate Communications
|
Q4/15
|
2011-02-02 |
|
[ 1442 ]
|
G.hn: Differentiate between DLL multicast traffic and PHY multicast traffic in G.hn
|
CopperGate Communications
|
Q4/15
|
2011-02-02 |
|
[ 1441 ]
|
Withdrawn: MPLS-TP Standards
|
BT
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-02 |
|
[ 1440 ]
|
Second generation ETH MEP and MIP functions
|
Huawei
|
Q9/15
|
2011-02-02 |
|
[ 1439 ]
|
Comments on differentiation of MPLS-TP environments
|
NSN
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-02 |
|
[ 1438 ]
|
G.gen: G.vdsl: G.ploam: Ambiguity of SES and UAS during re-initialization
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-02-02 |
|
[ 1437 ]
|
G.vdsl: Re-Initialization Policies: Proposed changes to working text for G.993.2
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-02-02 |
|
[ 1436 ]
|
Control elements for BMCA in telecom
|
NSN
|
Q13/15
|
2011-02-02 |
|
[ 1435 ]
|
MATIE, MTIE, and MAFE graphs into metrics definitions
|
NSN
|
Q13/15
|
2011-02-02 |
|
[ 1434 ]
|
A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications"
|
CopperGate Communications
|
Q4/15
|
2011-02-02 |
|
[ 1433 ]
|
G.hn: Proposed Annex for extension of G.hn for optical transmission media
|
CopperGate Communications
|
Q4/15
|
2011-02-02 |
|
[ 1432 ]
|
G.hn: Backup Domain master related corrigendum items for G.9961
|
CopperGate Communications
|
Q4/15
|
2011-02-02 |
|
[ 1431 ]
|
G.hn: Corrigendum items for G.9961
|
CopperGate Communications
|
Q4/15
|
2011-02-02 |
|
[ 1430 ]
|
G.hn: Update of the text for the "symbol boosting" mechanism
|
CopperGate Communications
|
Q4/15
|
2011-02-02 |
|
[ 1429 ]
|
G.hn: Orthogonal preambles for the Neighbour domain interference mitigation (NDIM) mechanism
|
CopperGate Communications
|
Q4/15
|
2011-02-02 |
|
[ 1428 ]
|
G.hn: MIMO transmission scheme for PHY frames and signals other than 'frames where the payload is intended only for MIMO receivers', for G.hn-MIMO
|
CopperGate Communications
|
Q4/15
|
2011-02-02 |
|
[ 1427 ]
|
G.hn: Update of the "modulation of unloaded subcarriers" text of G.hn-MIMO
|
CopperGate Communications
|
Q4/15
|
2011-02-02 |
|
[ 1426 ]
|
G.hn: Channel estimation protocol for G.hn-MIMO
|
CopperGate Communications
|
Q4/15
|
2011-02-02 |
|
[ 1425 ]
|
G.hn: Update of the text of 'Tx ports mapping' for G.hn-MIMO
|
CopperGate Communications
|
Q4/15
|
2011-02-02 |
|
[ 1424 ]
|
Treatment of delay jumps in PDV data
|
NSN
|
Q13/15
|
2011-02-02 |
|
[ 1423 ]
|
Draft baseline text describing the Alternative Electrical Length Estimation Method (AELEM)
|
BT
|
Q4/15
|
2011-02-01 |
|
[ 1422 ]
|
G.adsl: G.vdsl : Low Power Modes for Remote VDSL2 Nodes
|
BT
|
Q4/15
|
2011-02-01 |
|
[ 1421 ]
|
G.VDSL: INM INPEQ Histogram
|
BT
|
Q4/15
|
2011-02-01 |
|
[ 1420 ]
|
Functional model of HAO
|
Huawei
|
Q9/15, Q11/15
|
2011-02-01 |
|
[ 1419 ]
|
G.VDSL: INM IAT Histogram
|
BT
|
Q4/15
|
2011-02-01 |
|
[ 1418 ]
|
Dealing with multiple criteria of packet selection
|
Calnex Solutions
|
Q13/15
|
2011-02-01 |
|
[ 1417 ]
|
G.LT: PSD Shaped SELT
|
BT
|
Q4/15
|
2011-02-01 |
|
[ 1416 ]
|
Modifications for draft G.798.1 (TD 379/P)
|
ETRI
|
Q9/15
|
2011-02-01 |
Results:2390 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):