Contributions  |
|
Number
|
Received
|
Source
|
Title
|
Questions
|
|
[ 1465 ]
(Rev.1) |
2011-02-02 |
United States of America
|
USA on Consent of Draft Recommendation G.tpoam
|
Q10/15
|
|
[ 1464 ]
|
2011-02-02 |
Lantiq AEG
|
G.hnem: Informative Appendix to describe use cases and installation examples
|
Q4/15
|
|
[ 1463 ]
|
2011-02-02 |
Deutsche Telekom
|
Wavelength conversion in reconfigurable multi-degree optical nodes
|
Q7/15
|
|
[ 1462 ]
|
2011-02-02 |
Deutsche Telekom
|
Considerations on transverse compatibility for systems according to G.698.2
|
Q6/15
|
|
[ 1461 ]
|
2011-02-02 |
NSN
|
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications"
|
Q9/15, Q14/15, Q12/15, Q10/15
|
|
[ 1460 ]
|
2011-02-02 |
CopperGate Communications
|
G.gen: G.vdsl: G.hn: On the feasibility of a low complexity G.hn based FTTdp solution
|
Q4/15
|
|
[ 1459 ]
|
2011-02-02 |
France Telecom
,
Tellabs
|
G.8260: comments on WD107 from Edinburgh interim meeting (PDV metrics)
|
Q13/15
|
|
[ 1458 ]
|
2011-02-02 |
France Telecom
|
Network PDV accumulation study with "end-to-end" data traffic model
|
Q13/15
|
|
[ 1457 ]
|
2011-02-02 |
France Telecom
|
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented
|
Q13/15
|
|
[ 1456 ]
|
2011-02-02 |
France Telecom
|
G.8272: comments on PRTC limits proposal
|
Q13/15
|
|
[ 1455 ]
|
2011-02-02 |
France Telecom
|
G.8263: testing methodology for the PDV tolerance of a packet slave clock
|
Q13/15
|
|
[ 1454 ]
|
2011-02-02 |
France Telecom
|
G.8261.1: Hypothetical Reference Models proposal
|
Q13/15
|
|
[ 1453 ]
|
2011-02-02 |
France Telecom
|
G.8261.1: Preliminary proposal of PDV network limits for the HRM-1
|
Q13/15
|
|
[ 1452 ]
|
2011-02-02 |
France Telecom
|
Possible locations of external phase/time interfaces in a phase/time distribution chain based on Boundary Clocks
|
Q13/15
|
|
[ 1451 ]
|
2011-02-02 |
France Telecom
|
Analysis of phase/time distribution over OTN networks
|
Q9/15, Q13/15, Q11/15
|
|
[ 1450 ]
|
2011-02-02 |
France Telecom
|
Proposal of a Working Document from Q13 to Q2, Q4 and Q11 reflecting the current status of the work in Q13 on phase/time synchronization
|
Q13/15
|
|
[ 1449 ]
|
2011-02-02 |
NTT
,
Telecom Italia
|
Further consideration of requirements for on-demand segment monitoring in MPLS-TP
|
Q12/15, Q10/15
|
|
[ 1448 ]
|
2011-02-02 |
NTT
|
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP
|
Q12/15, Q10/15
|
|
[ 1447 ]
|
2011-02-02 |
NTT
|
Proposal for additional delay measurement functions in MPLS-TP OAM
|
Q9/15, Q14/15, Q10/15
|
|
[ 1446 ]
|
2011-02-02 |
NTT
|
Proposal of adding topic of Timing and Synchronization Aspects of Packet Networks in OTNT SWP
|
Q3/15, Q13/15
|
|
[ 1445 ]
|
2011-02-02 |
ISOC
|
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions
|
Q9/15, Q14/15, Q12/15, Q10/15
|
|
[ 1444 ]
|
2011-02-02 |
CopperGate Communications
|
G.hn: corrections to Tunnel termination for a corrigendum to G.9961
|
Q4/15
|
|
[ 1443 ]
|
2011-02-02 |
CopperGate Communications
|
G.hn: Handling multicast traffic in G.hn
|
Q4/15
|
|
[ 1442 ]
|
2011-02-02 |
CopperGate Communications
|
G.hn: Differentiate between DLL multicast traffic and PHY multicast traffic in G.hn
|
Q4/15
|
|
[ 1441 ]
|
2011-02-02 |
BT
|
Withdrawn: MPLS-TP Standards
|
Q9/15, Q14/15, Q12/15, Q10/15
|
Results:2390 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48 -
49 -
50 -
51 -
52 -
53 -
54 -
55 -
56 -
57 -
58 -
59 -
60 -
61 -
62 -
63 -
64 -
65 -
66 -
67 -
68 -
69 -
70 -
71 -
72 -
73 -
74 -
75 -
76 -
77 -
78 -
79 -
80 -
81 -
82 -
83 -
84 -
85 -
86 -
87 -
88 -
89 -
90 -
91 -
92 -
93 -
94 -
95 -
96
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):