Contributions  |
|
Number
|
Received
|
Source
|
Title
|
Questions
|
|
[ 1540 ]
(Rev.1) |
2011-11-17 |
Ericsson Canada, Inc.
|
Proposed DRNI work item
|
Q9/15
|
|
[ 1539 ]
(Rev.1) |
2011-11-17 |
Ericsson Canada, Inc.
|
Proposed G.8021.1
|
Q9/15, Q10/15
|
|
[ 1538 ]
(Rev.1) |
2011-11-17 |
Ciena Canada
|
Example of changes to G.8021 to support enhanced holdover
|
Q13/15
|
|
[ 1537 ]
(Rev.1) |
2011-11-17 |
Ciena Canada
|
G.8032 Support of E.LINE, E-TREE, and E-LAN Services
|
Q9/15
|
|
[ 1536 ]
|
2011-11-18 |
N/A
|
Withdrawn
Withdrawn
|
N/A
|
|
[ 1535 ]
(Rev.1) |
2011-11-17 |
Zarlink Semiconductor
|
Clean-up of G.8260 text
|
Q13/15
|
|
[ 1534 ]
(Rev.1) |
2011-11-17 |
Zarlink Semiconductor
|
Harmonization of cluster & percentile selection for clock emulation metrics
|
Q13/15
|
|
[ 1533 ]
(Rev.1) |
2011-11-17 |
China Unicom
,
Nokia Siemens Networks GmbH & Co. KG
|
Proposal to start a new recommendation G.metro (Ultra-dense WDM applications enabled by coherent detection and tuneable transceiver functionality)
|
Q6/15, Q2/15
|
|
[ 1532 ]
|
2011-11-17 |
Nippon Telegraph and Telephone Corporation (NTT)
|
Cost estimation of type X and proposal of new N:1 PON protection scheme
|
Q2/15
|
|
[ 1531 ]
(Rev.1) |
2011-11-17 |
Israel
|
Support for the consent and approval of G.hn draft Recommendations
|
Q4/15
|
|
[ 1530 ]
(Rev.1) |
2011-11-17 |
Israel
|
G.vector: Vectoring in the Presence of UPBO
|
Q4/15
|
|
[ 1529 ]
(Rev.1) |
2011-11-17 |
Ericsson UK
|
Proposal to study and include load sharing in G.808.1
|
Q9/15
|
|
[ 1528 ]
|
2011-11-15 |
Nokia Siemens Networks GmbH & Co. KG
|
Further example for the use of flexible grids in Appendix I of Rec. G.694.1
|
Q6/15
|
|
[ 1527 ]
(Rev.1-3) |
2011-11-15 |
France Télécom Orange
,
Portugal Telecom, SGPS, S.A.
,
Swisscom SA
,
Telecom Italia S.p.A.
,
Telefónica, S.A.
,
Telstra Corporation Ltd.
,
Verizon Communication Corporation
|
Standardization of optical switching (photonic sub-lambda switching)
|
Q12/15
|
|
[ 1526 ]
(Rev.1) |
2011-11-15 |
Ericsson UK
|
G.798 - default setting for PT=20 (2.5 G Time Slot)
|
Q9/15
|
|
[ 1525 ]
(Rev.1) |
2011-11-11 |
Prysmian SpA
|
MPI: Experimental comparison between the ECL and the Fiber-Stretching test methods
|
Q5/15
|
|
[ 1524 ]
(Rev.1) |
2011-10-28 |
Prysmian SpA
|
Future revision of Rec. G.657 (bend-loss insensitive SMF)
|
Q5/15
|
|
[ 1523 ]
(Rev.1-3) |
2011-10-14 |
Huawei Technologies Co. Ltd.
|
Amendment of G.8113.1 based on results of Beijing expert meeting
|
Q10/15
|
|
[ 1522 ]
|
2011-09-05 |
France
|
Template to describe a proposed new ITU-T Recommendation
|
QALL/15
|
|
[ 1521 ]
(Rev.1) |
2011-08-23 |
ERDF
|
Submission to update the G3 DLL specs in Recommendation ITU-T G.9956
|
Q4/15
|
|
[ 1520 ]
|
2011-08-23 |
Deutsche Telekom
|
DOCUMENT WITHDRAWN
|
Q6/15, Q11/15
|
|
[ 1519 ]
|
2011-07-11 |
Deutsche Telekom
|
New OTN interfaces in ITU-T G.709
|
Q6/15, Q11/15
|
|
[ 1518 ]
|
2011-02-11 |
Telefónica Investigación y Desarrollo
|
Structuring of MPLS-TP Recommendations
|
Q9/15, Q14/15, Q12/15, Q10/15
|
|
[ 1517 ]
|
2011-02-02 |
Huawei
|
Specification of a Pulse per Second (1PPS) interface for Telecom
|
Q13/15
|
|
[ 1516 ]
|
2011-02-02 |
Huawei
|
Translation of an IP Multicast address to an Ethernet MAC Multicast address
|
Q13/15
|
Results:2390 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48 -
49 -
50 -
51 -
52 -
53 -
54 -
55 -
56 -
57 -
58 -
59 -
60 -
61 -
62 -
63 -
64 -
65 -
66 -
67 -
68 -
69 -
70 -
71 -
72 -
73 -
74 -
75 -
76 -
77 -
78 -
79 -
80 -
81 -
82 -
83 -
84 -
85 -
86 -
87 -
88 -
89 -
90 -
91 -
92 -
93 -
94 -
95 -
96
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):