Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2340 ]
|
Test error of PRTC
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2339 ]
|
PHY and intra-node noise error
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2338 ]
|
Analysis about SyncE rearrangement for different message delays of G.781
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2337 ]
|
Considerations about APS protocol phases in G.smp
|
Alcatel-Lucent Italia S.p.A.
|
Q9/15
|
2012-08-28 |
|
[ 2336 ]
|
Considerations for Ethernet SD detection using CCM counting
|
Alcatel-Lucent Italia S.p.A.
|
Q9/15
|
2012-08-28 |
|
[ 2335 ]
|
Comments to G.8121 Amd1
|
Alcatel-Lucent Italia S.p.A.
|
Q9/15
|
2012-08-28 |
|
[ 2334 ]
(Rev.1) |
Proposal for inclusion of PtP WDM use cases in G.ngpon2.1
|
ADVA Optical Networking
,
Ericsson, Inc.
,
France Télécom Orange
,
Nokia Siemens Networks GmbH & Co. KG
|
Q2/15
|
2012-08-28 |
|
[ 2333 ]
(Rev.1) |
Frequency slot assignment of multicarrier OCh
|
Deutsche Telekom AG
|
Q11/15
|
2012-08-28 |
|
[ 2332 ]
(Rev.1) |
Requirements on OTN interfaces beyond 100 Gbit/s
|
Deutsche Telekom AG
|
Q11/15
|
2012-08-28 |
|
[ 2331 ]
(Rev.1) |
Proposal for future OTN interfaces
|
Deutsche Telekom AG
|
Q11/15
|
2012-08-28 |
|
[ 2330 ]
|
G.FAST: On TDD frame size
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2329 ]
|
G.FAST: On LDPC versus RS+TC
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2328 ]
|
G.FAST: On selection of RTX scheme
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2327 ]
|
A proposal to modification of G.709 to add OTU0 frame
|
Electronics and Telecommunications Research Institute (ETRI)
,
LG-Ericsson
,
SK Telecom
|
Q11/15
|
2012-08-28 |
|
[ 2326 ]
|
G.FAST: On dynamic asymmetry ratio
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2325 ]
|
G.FAST: On managing FTTdp functional elements that may have intermitted powering
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2324 ]
|
Proposal of progressing multipoint Ethernet connection protection (MECP) as a formal work item
|
Electronics and Telecommunications Research Institute (ETRI)
,
SK Telecom
|
Q9/15
|
2012-08-28 |
|
[ 2323 ]
|
Ultra-dense WDM metro system
|
Nokia Siemens Networks GmbH & Co. KG
|
Q6/15
|
2012-08-28 |
|
[ 2322 ]
(Rev.1) |
Terminology for Sub-Lambda Photonically Switched Network (SLPSN)
|
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Portugal Telecom, SGPS, S.A.
,
Swisscom SA
,
Telecom Italia S.p.A.
,
Telefónica, S.A.
,
Telstra Corporation Ltd.
,
Verizon Communication Corporation
|
Q3/15, Q12/15
|
2012-08-28 |
|
[ 2321 ]
+Add.1 |
Latest draft of G.8131.1 and some considerations
|
Telecom Italia S.p.A.
|
Q9/15
|
2012-08-28 |
|
[ 2320 ]
|
Not used
Withdrawn: Reposted as TD762/WP3
|
N/A
|
|
2012-08-28 |
|
[ 2319 ]
|
Technical analysis of PSC protocol for MPLS-TP linear protection
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2012-08-28 |
|
[ 2318 ]
|
G.fast: Mandatory support of 4096 sub-carriers
|
A1 Telekom Austria AG
,
France Télécom Orange
,
Telecom Italia S.p.A.
,
TeliaSonera AB
|
Q4A/15
|
2012-08-28 |
|
[ 2317 ]
|
Extended RAM Option for Retransmission in VDSL2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2316 ]
(Rev.1) |
G.FAST: FTTdp Power Budget
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2315 ]
|
Impact of Sources of Experimental Error on KL0 Determination
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-28 |
|
[ 2314 ]
|
Proposal of Consent of Recommendation on APS based MPLS-TP Linear Protection
|
Japan
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2012-08-28 |
|
[ 2313 ]
|
Network objectives and APS protocol message communication for MECP
|
Korea (Rep. of)
|
Q9/15
|
2012-08-28 |
|
[ 2312 ]
|
Proposed texts for Clause 6.1.2 (SMP for Packet Networks) in G.smp
|
Korea (Rep. of)
|
Q9/15
|
2012-08-28 |
|
[ 2311 ]
|
Proposed modifications to external commands in G.smp
|
Korea (Rep. of)
|
Q9/15
|
2012-08-28 |
|
[ 2310 ]
|
Out-of-service in PSC based MPLS-TP linear protection
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2012-08-28 |
|
[ 2309 ]
|
G.fast: On Net Coding Gain
|
Huawei Technologies Co. Ltd.
|
Q4A/15
|
2012-08-28 |
|
[ 2308 ]
|
Proposal for inclusion of Performance Measurement Methods of Advanced Modulation Formats in G.ngpon2.2
|
Electronics and Telecommunications Research Institute (ETRI)
,
Nokia Siemens Networks GmbH & Co. KG
|
Q2/15
|
2012-08-28 |
|
[ 2307 ]
|
Proposal for consented Corrigendum 1 of G.9956: Physical Carrier Sense
|
Yitran Communications Ltd.
|
Q4C/15
|
2012-08-28 |
|
[ 2306 ]
|
Proposal for determined Amendment 1 of G.9955 Annex A : Optional coherent mode
|
Yitran Communications Ltd.
|
Q4C/15
|
2012-08-28 |
|
[ 2305 ]
|
Proposal for inclusion of Advanced Modulation Formats in G.ngpon2.2
|
Electronics and Telecommunications Research Institute (ETRI)
,
Nokia Siemens Networks GmbH & Co. KG
|
Q2/15
|
2012-08-28 |
|
[ 2304 ]
|
Proposal for consented Corrigendum 1 of G.9956: various comments
|
Yitran Communications Ltd.
|
Q4C/15
|
2012-08-28 |
|
[ 2303 ]
|
Proposal for determined Amendment 1 of G.9955 Annex A : LQI calculation
|
Yitran Communications Ltd.
|
Q4C/15
|
2012-08-28 |
|
[ 2302 ]
|
G.fast: First DMT Symbol After Inactivity Period
|
Huawei Technologies Co. Ltd.
|
Q4A/15
|
2012-08-28 |
|
[ 2301 ]
|
G.vector: Extending maximum duration of O-P-VECTOR 1 signal
|
Huawei Technologies Co. Ltd.
|
Q4A/15
|
2012-08-28 |
|
[ 2300 ]
|
Proposal to add fixed wavelength assignment in physical layer in G.multi
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q2/15
|
2012-08-28 |
|
[ 2299 ]
|
Proposal for determined Amendment 1 of G.9955: Robust and super robust modulation
|
Yitran Communications Ltd.
|
Q4C/15
|
2012-08-28 |
|
[ 2298 ]
(Rev.1) |
Proposal to add some parameter definitions for G.ng-pon2.2
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q2/15
|
2012-08-28 |
|
[ 2297 ]
|
Proposal for determined Amendment 1 of G.9955 Annex A : Interleaver
|
Yitran Communications Ltd.
|
Q4C/15
|
2012-08-28 |
|
[ 2296 ]
|
Proposal to add O-OFDM as another line code option in the Annex A of the G.ngpon2.2
|
Electronics and Telecommunications Research Institute (ETRI)
,
Nokia Siemens Networks GmbH & Co. KG
|
Q2/15
|
2012-08-28 |
|
[ 2295 ]
|
Proposal for determined Amendment 1 of G.9955: Carrier Sense timing
|
Yitran Communications Ltd.
|
Q4C/15
|
2012-08-28 |
|
[ 2294 ]
|
Proposal for determined Amendment 1 of G.9955 Annex D : Pilots equation
|
Yitran Communications Ltd.
|
Q4C/15
|
2012-08-28 |
|
[ 2293 ]
|
Proposal for determined Amendment 1 of G.9955 Annex A : Adaptive Tone masking
|
Yitran Communications Ltd.
|
Q4C/15
|
2012-08-28 |
|
[ 2292 ]
|
Proposal for determined Amendment 1 of G.9955 Annex D : Preamble gain
|
Yitran Communications Ltd.
|
Q4C/15
|
2012-08-28 |
|
[ 2291 ]
(Rev.1) |
Optical Splitter Insertion Loss data representation
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q7/15
|
2012-08-28 |
Results:2390 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):