Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1965 ]
|
Request for Response to OIF Liaison Statement (oif2012.265.02) a
|
Alcatel-Lucent USA Inc.
,
Xtera Communications, Inc.
|
Q9/15, Q14/15
|
2012-08-22 |
|
[ 1964 ]
|
Proposed modification to existing Flyer "Optical Fibre and Cable"
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2012-08-20 |
|
[ 1963 ]
|
Consideration on OTL interface for OTU5
|
Fujitsu Limited
|
Q11/15
|
2012-08-17 |
|
[ 1962 ]
|
Flexible high speed interfaces
|
Ericsson UK
|
Q11/15
|
2012-08-16 |
|
[ 1961 ]
|
Traffic Differentiation in Transport Networks
|
Ericsson UK
|
Q9/15, Q12/15
|
2012-08-16 |
|
[ 1960 ]
|
Self Configuring Networks
|
Ericsson UK
|
Q9/15
|
2012-08-16 |
|
[ 1959 ]
(Rev.1) |
Bandwidth- Load sharing
|
Ericsson UK
|
Q9/15
|
2012-08-16 |
|
[ 1958 ]
(Rev.1) |
G.8273.2: Discussion on text for Sections 6 through 9.
|
Calnex Solutions Limited
|
Q13/15
|
2012-08-15 |
|
[ 1957 ]
|
Examples for ODU SMP scenarios
|
Huawei Technologies Co. Ltd.
,
Nokia Siemens Networks GmbH & Co. KG
|
Q9/15
|
2012-08-14 |
|
[ 1956 ]
|
Proposal for determined text G.9955 Annex A : Interleaver
|
ERDF
,
STMicroelectronics
|
Q4C/15
|
2012-08-12 |
|
[ 1955 ]
(Rev.1) |
Proposal for consented text G.9956 Annex A - Cor1 : Timestamp definition
|
ERDF
,
STMicroelectronics
|
Q4C/15
|
2012-08-12 |
|
[ 1954 ]
|
Proposal for consented text G.9956 Annex A - Cor1 : Short Address in Neighbour table
|
ERDF, STMicroelectronics
,
STMicroelectronics
|
Q4C/15
|
2012-08-11 |
|
[ 1953 ]
|
Introducing the concept of security in G.697
|
Telefon AB - LM Ericsson
|
Q6/15
|
2012-08-10 |
|
[ 1952 ]
|
Considerations about security at the optical layer
|
Telefon AB - LM Ericsson
|
Q6/15
|
2012-08-10 |
|
[ 1951 ]
|
Not used
Withdrawn: Reposted as TD677/PLEN
|
N/A
|
|
2012-08-09 |
|
[ 1950 ]
|
Not used
Withdrawn: Reposted as TD676/PLEN
|
N/A
|
|
2012-08-09 |
|
[ 1949 ]
(Rev.1) |
G.hnem: Proposal for the inclusion of PRIME Service Specific Convergence Layer for IPv6 in consented G.9956 Cor1 Annex B
|
STMicroelectronics
|
Q4C/15
|
2012-08-08 |
|
[ 1948 ]
(Rev.1) |
G.8273.3: Noise Error Definition for T-TC to control impact of traffic.
|
Calnex Solutions Limited
,
China Unicom
|
Q13/15
|
2012-08-08 |
|
[ 1947 ]
(Rev.1) |
G.8273.2: T-BC Noise Error Definition to control impact of traffic.
|
Calnex Solutions Limited
,
China Unicom
|
Q13/15
|
2012-08-08 |
|
[ 1946 ]
(Rev.1) |
G.8273.2: Phase Transient interface applicability.
|
Calnex Solutions Limited
|
Q13/15
|
2012-08-08 |
|
[ 1945 ]
|
Comments on Prysmian contribution for the preparation for consent of Rec. G.657
|
Telecom Italia S.p.A.
|
Q5/15
|
2012-07-30 |
|
[ 1944 ]
|
Proposed changes to facilitate future approval of draft new Recommendation G.9980 (according to WTSA-08 Resolution 1, Section 9.5.5)
|
Germany
|
Q4C/15, Q4B/15, Q4A/15, Q2/15, Q1/15
|
2012-07-13 |
|
[ 1943 ]
|
Germany's considerations regarding the proceedings of draft new Recommendation G.9980
|
Germany
|
QALL/15
|
2012-07-10 |
|
[ 1942 ]
(Rev.1) |
ZTE Proposal for L.64 on appendix III and IV
|
ZTE Corporation
|
Q17/15
|
2012-07-09 |
|
[ 1941 ]
|
Proposed Revisions to the Appendix III and IV in the Draft Revised Rec. ITU-T L.64
|
Huawei Technologies Co. Ltd.
|
|
2012-07-03 |
|
[ 1940 ]
|
Not used
No document uploaded
|
N/A
|
|
2012-06-04 |
|
[ 1939 ]
|
Not used
Withdrawn by submitter
|
N/A
|
|
2012-01-06 |
|
[ 1938 ]
|
G.fast: Multi-layer TCAM
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-24 |
|
[ 1937 ]
|
Mapping of G.798 atomic functions to G.874.1 object classes
|
Deutsche Telekom AG
|
Q14/15
|
2011-11-23 |
|
[ 1936 ]
|
G.hnem: Proposal for subcarrier spacing of coexistence preamble symbols
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-23 |
|
[ 1935 ]
|
G.vector: Editorial fix in G.993.5 Figure 7-4 and 7-5.
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-23 |
|
[ 1934 ]
|
G.gen: G.vdsl: G.vector: VDSL2 Dynamic Virtual Noise
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-23 |
|
[ 1933 ]
|
G.ploam: MIB parameters to support the ATTNDR improved calculation method
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-23 |
|
[ 1932 ]
|
G.vdsl: ATTNDR improved calculation method: proposed text changes
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-23 |
|
[ 1931 ]
|
G.fast: TDMA performance in practical topologies
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-23 |
|
[ 1930 ]
|
G.fast: TCAM: regain the capacity lost in the noise margin
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-23 |
|
[ 1929 ]
|
Freq Grid and Index contrast for OD/OM filters
|
Electronics and Telecommunications Research Institute (ETRI)
,
KT Corporation
,
LG-Ericsson
|
Q6/15
|
2011-11-23 |
|
[ 1928 ]
|
Measurement Methods for Phase/Time Clocks
|
Deutsche Telekom AG
|
Q13/15
|
2011-11-23 |
|
[ 1927 ]
|
PTP and SyncE over OTN-ODU0
|
Deutsche Telekom AG
|
Q13/15
|
2011-11-23 |
|
[ 1926 ]
|
G.8271: Minor editorial improvements
|
Deutsche Telekom AG
|
Q13/15
|
2011-11-23 |
|
[ 1925 ]
|
G.8271 1pps interface performance specification
|
Deutsche Telekom AG
,
France Télécom Orange
|
Q13/15
|
2011-11-23 |
|
[ 1924 ]
|
Additional Simulation Results of Packet Slave Clock Frequency Based Upon 2nd Order PLL
|
Tellabs Oy
,
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1923 ]
(Rev.1) |
G.hnem: Proposal for text fixes in G.9956
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1922 ]
(Rev.1) |
G.hnem: Number of PFH symbols for regions other than Europe and North America
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1921 ]
|
[G.ADSL] Low Power ADSL2 (and ADSL2plus)
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1920 ]
(Rev.1) |
G.hnem: On the maximum number of payload repetitions in G.9955
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1919 ]
(Rev.1) |
G.hnem: Proposal to update the text describing the interleaver
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1918 ]
(Rev.1) |
G.hnem: Text changes to accommodate 1-bit BAT
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1917 ]
(Rev.1) |
G.hnem: Proposal to update the text for Annex E of G.9955
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1916 ]
(Rev.1) |
Parameter proposals for PTP time profile
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2011-11-22 |
Results:2390 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):