International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2090 ]  
 
G.hn: Clarification on FACK     Marvell Semiconductor Inc.   Q4B/15   2012-08-25
[ 2089 ]  
 
G.hn: Proposal for Extended ACK implementation     Marvell Semiconductor Inc.   Q4B/15   2012-08-25
[ 2088 ]  
 
G.fast: Proposed Definitions for G.fast PMD     Ikanos Communications   Q4A/15   2012-08-25
[ 2087 ]  
 
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes     PMC-Sierra, Inc.   Q9/15, Q14/15, Q13/15, Q11/15   2012-08-25
[ 2086 ]  
 
Proposed clarification for the CSF start time in G.7041     PMC-Sierra, Inc.   Q11/15   2012-08-25
[ 2085 ]  
 
Proposal to allow a modified GFP frame alignment algorithm for high-speed interfaces     PMC-Sierra, Inc.   Q11/15   2012-08-25
[ 2084 ]  
 
Testing Packet Clocks (re. G.8263) - Part 2     Anue Systems   Q13/15   2012-08-25
[ 2083 ]  
 
Normal operation of telecom-grade network elements for supporting packet-based timing     Anue Systems   Q13/15   2012-08-25
[ 2082 ]  
 
Packet Timing Monitor - Definition     Anue Systems   Q13/15   2012-08-25
[ 2081 ]  
 
Annex for G.8273 discussing performance parameters for PTP clocks     Anue Systems   Q13/15   2012-08-25
[ 2080 ]  
 
Organization of T-BC performance requirements     Anue Systems   Q13/15   2012-08-25
[ 2079 ]  
 
Time Error of PTP master ports     Anue Systems   Q13/15   2012-08-24
[ 2078 ]  
 
Time error accumulation in chains of phase/time clocks     Anue Systems   Q13/15   2012-08-24
[ 2077 ]  
 
Estimating constant time error and related measurement methods for phase/time clocks     Anue Systems   Q13/15   2012-08-24
[ 2076 ]  
 
Requirements for fibres used in next generation submarine systems and new recommended text for G.654     OFS Fitel, LLC   Q5/15   2012-08-24
[ 2075 ]  
 
G.8260: Definition of Partial On-path Support     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2074 ]  
 
Starting point for the development of a new PTP profile for time and phase distribution over existing deployed networks     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2073 ]  
 
G.8272: Phase/Time Holdover Capability for a PRTC     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2072 ]  
 
Update to G.8021 for retrieval of on-demand intermediate measurements     Alcatel-Lucent Italia S.p.A. , Alcatel-Lucent USA Inc.   Q9/15   2012-08-24
[ 2071 ]  
 
G.adsl: Stable Sleep Mode Optimization for Energy Efficient DSL: Proposal     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4A/15   2012-08-24
[ 2070 ]  
 
G.smp Objectives     Alcatel-Lucent USA Inc. , Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2012-08-24
[ 2069 ]  
 
G.8272: Performance conditions for the PRTC     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2068 ]  
 
G.8265.1: Value of the PTP "Renewal Invited" flag     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2067 ]  
 
G.8265.1: Value of the PTP clockAccuracy Field     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2066 ]  
 
G.adsl: Stable Sleep Mode Optimization for Energy Efficient DSL     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4A/15   2012-08-24
[ 2065 ]  
 
Proposed Input for G.smp Summary Clause re Capacity Efficiency     Alcatel-Lucent USA Inc.   Q9/15   2012-08-24
[ 2064 ]  
(Rev.1) 
G.vdsl: Proposed Accuracy Target for LATN and SATN     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4A/15   2012-08-24
[ 2063 ]  
(Rev.1) 
G.8263: PDV Noise Tolerance Testing for the PEC-S-F     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2062 ]  
 
Mapping of 16G Fibre-Channel into OTN     Alcatel-Lucent USA Inc.   Q11/15   2012-08-24
[ 2061 ]  
(Rev.1-2) 
Proposed Input for G.smp Summary Clause re Mesh Topology Definition     Alcatel-Lucent USA Inc.   Q9/15   2012-08-24
[ 2060 ]  
 
G.8263: PDV Distribution for Noise Tolerance of Packet Slave Clocks     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2059 ]  
(Rev.1) 
G.ploam: Parameters for Data Gathering Messaging     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4A/15   2012-08-24
[ 2058 ]  
 
Misalignment among G.709, G.798 and G.872     Ciena Corporation   Q9/15, Q12/15, Q11/15   2012-08-24
[ 2057 ]  
 
G.vdsl: Proposed text for Data Gathering Messaging     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4A/15   2012-08-24
[ 2056 ]  
 
Generic considerations for protection resource assignments in G.smp     Alcatel-Lucent USA Inc. , Ciena Corporation   Q9/15   2012-08-24
[ 2055 ]  
 
Distributed G.8031 proposal     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2054 ]  
 
Requirements of Control Plane/Management Plane to support SMP     Ciena Corporation   Q9/15   2012-08-24
[ 2053 ]  
(Rev.1) 
Development of a new PTP Profile for Time/Phase Distribution     AT&T, Inc. , Sprint , SymmetriCom, Inc. , Verizon Communication Corporation   Q13/15   2012-08-24
[ 2052 ]  
 
Protection Interworking editorial comments     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2051 ]  
 
Bi-directional SMP Operation and Signalling Flow Sequence     Ciena Corporation   Q9/15   2012-08-24
[ 2050 ]  
(Rev.1) 
Proposal for determined text G.9955 Annex A - Amd1 - Padding of MAC frame     ERDF   Q4C/15   2012-08-24
[ 2049 ]  
 
Comments and clarifications on G.smp     Ciena Corporation   Q9/15   2012-08-24
[ 2048 ]  
 
G.odusmp Support of Both ODUj and ODUk Restoration     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2047 ]  
 
Use of CL-SNCG/S to simplify G.873.2 configurations     Ciena Corporation   Q9/15   2012-08-24
[ 2046 ]  
 
Not used  
Withdrawn by submitter
 
N/A   Q9/15   2012-08-24
[ 2045 ]  
 
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes     AT&T, Inc. , Ciena Corporation   Q9/15, Q14/15, Q13/15, Q11/15   2012-08-24
[ 2044 ]  
 
G.odusmp with TCM APS     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2043 ]  
 
Alternative to legacy interfaces for connecting PRTC to T-GM     Cisco Systems, Inc.   Q13/15   2012-08-24
[ 2042 ]  
 
G.8272: PRTC Support of SyncE and ESMC     Cisco Systems, Inc.   Q13/15   2012-08-24
[ 2041 ]  
 
G.smp multiple failure protection pre-emption     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2021-01-29