International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 290 ]  
 
2008-11-23 ZTE Corporation, China   Comparison between shared-link and sub-ring models (G.8032)     Q9/15  
[ 289 ]  
 
2008-11-23 ZTE Corporation   Text Proposals in Appendix I for G.696.1 on mixed 10G/40G transmission     Q6/15  
[ 288 ]  
 
2008-11-23 ZTE Corporation, China   Proposals on optical attenuator parameters in G.671     Q7/15  
[ 287 ]  
 
2008-11-23 ZTE Corporation, China   Proposal on PDL and PMD parameters in G.671     Q7/15  
[ 286 ]  
 
2008-11-23 ZTE Corporation   Proposals to Add Coordination Between Source and Destination to section 6.2 of G.7713     Q14/15  
[ 285 ]  
 
2008-11-23 ZTE Corporation   Comments to G.8152     Q14/15  
[ 284 ]  
 
2008-11-23 ZTE Corporation   Comments to G.8052     Q14/15  
[ 283 ]  
 
2008-11-23 ZTE   Add "central frequency deviation" parameter for transmitter in G.698.2     Q6/15  
[ 282 ]  
 
2008-11-23 BT   G.lt: Time-varying interference measurement and characterisation     Q4/15  
[ 281 ]  
 
2008-11-23 Infineon Technologies AG   G.hn: Proposal for maximum wideband transmit power     Q4/15  
[ 280 ]  
 
2008-11-23 Infineon Technologies AG   G.hn: Proposal for text describing G.hn threat model     Q4/15  
[ 279 ]  
 
2008-11-23 ETRI (Republic of Korea)   G.8032 protection switching transient traffic performance requirement for next study period     Q9/15  
[ 278 ]  
 
2008-11-23 ETRI (Korea, Republic of)   FDB-delete scheme for fast protection switching in G.8032 Ethernet ring protection     Q9/15  
[ 277 ]  
 
2008-11-23 France Télécom, Tellabs   Creation of a new TLV in ESMC channel in order to transport frequency stability level information     Q13/15  
[ 276 ]  
 
2008-11-23 France Télécom, Tellabs   Proposed text for drafting of PTPv2 telecom profile frequency-oriented     Q13/15  
[ 275 ]  
 
2008-11-23 France Télécom, Tellabs   Discussion about the use of "Announce" and "Management" messages for PTPv2 telecom profile frequency-oriented     Q13/15  
[ 274 ]  
 
2008-11-23 Telecom Italia   Standards for 112 Gbit/s serial transmission     Q6/15  
[ 273 ]  
 
2008-11-23 Italy   Study items for Q6/15     Q6/15  
[ 272 ]  
 
2008-11-23 Alcatel-Lucent Italia, Alcatel Shanghai Bell, Ital   Naming Considerations regarding T-MPLS and MPLS-TP within ITU-T     Q9/15, Q3/15, Q11/15  
[ 271 ]  
 
2008-11-23 ZTE Corporation   Restoration exercise     Q14/15, Q12/15  
[ 270 ]  
 
2008-11-23 Italy   Document withdrawn (See C89)     Q6/15  
[ 269 ]  
 
2008-11-21 CopperGate Communications   G.hn: Profiles     Q4/15  
[ 268 ]  
 
2008-11-21 Infineon Technologies AG   G.hn: Proposal for fixed window setting     Q4/15  
[ 267 ]  
 
2008-11-21 Infineon Technologies AG, DS2   G.hn: Proposal to associate EVM values with the transmit power levels     Q4/15  
[ 266 ]  
 
1753-01-01 N/A   Withdrawn     N/A  
[ 265 ]  
 
2008-11-21 Alcatel-Lucent Bell N.V.   G.vector: Proposal for a frequency division multiplexing scheme for pilot sequences and sync-flags     Q4/15  
[ 264 ]  
 
2008-11-21 Alcatel-Lucent Bell N.V.   G.lt: Update to SELT-P draft text     Q4/15  
[ 263 ]  
 
2008-11-21 Gigle Semiconductor   Ghn: PLC Passband OFDM Parameters Proposal     Q4/15  
[ 262 ]  
 
2008-11-21 Infineon Technologies AG   G.INP: Further Details on Error Monitoring, OAM and Traffic Differentiation with the Unified Retransmission Method     Q4/15  
[ 261 ]  
 
2008-11-21 Infineon Technologies AG   G.hn: Proposal to use a single indexing rule     Q4/15  
[ 260 ]  
 
2008-11-21 Lucent Technologies, Inc - AimValley BV   Proposal to specify Failure of Protocol defects for the R-APS protocol     Q9/15  
[ 259 ]  
 
2008-11-21 France Telecom, Spidcom Technologies, Gigle Semico   G.hn: Proposal for a multi-mode FEC scheme     Q4/15  
[ 258 ]  
 
2008-11-21 Infineon Technologies AG   G.inp: Limitations of the PMS-TC Retransmisssion Scheme     Q4/15  
[ 257 ]  
 
2008-11-21 NTT   Proposed change in Draft Annex to G.709 for transcoding via 512B/513B     Q11/15  
[ 256 ]  
 
2008-11-21 DS2   Notification of IPR statement submission     Q4/15  
[ 255 ]  
 
2008-11-21 BT   G.lt: Communications Channel Extension for Measurement Data Retrieval     Q4/15  
[ 254 ]  
 
2008-11-21 Huawei technologies   Solution of fast GPON switching in long-reach PON scenario     Q2/15  
[ 253 ]  
 
2008-11-21 Huawei technologies Co., LTD   Proposal to support phase synchronization in GPON system     Q2/15  
[ 252 ]  
 
2008-11-21 Huawei technologies Co., LTD   Proposal to support ONT survival time attribute in G.984.4     Q2/15  
[ 251 ]  
 
2008-11-21 Huawei Technologies Co., Ltd. RAD Data communicati   Proposal on Continuous Mode of LR-PON     Q2/15  
[ 250 ]  
 
2008-11-21 Japan   Proposed text for ODU3ye/OTU3ye in supplement     Q11/15  
[ 249 ]  
 
2008-11-21 Alcatel Lucent Germany   Corrigendum for G.709 correcting small mistake and inconsistency with G.798     Q9/15, Q11/15  
[ 248 ]  
 
2008-11-21 Gigle Semiconductor   Ghn: EVM Requirements Proposal     Q4/15  
[ 247 ]  
 
2008-11-21 Deutsche Telekom   Proposal to include additional PMD-related parameters in the 40G and 100G modulation format comparison documents     Q7/15, Q6/15  
[ 246 ]  
 
2008-11-21 Ericsson AB   G.lt: Proposal for modifications to the "Loop Topology with cable-type identification" table in SELT     Q4/15  
[ 245 ]  
 
2008-11-21 Alcatel Lucent   Consideration of OTU4 FEC requirements     Q11/15  
[ 244 ]  
 
2008-11-21 Alcatel - Lucent Germany   Proposal for adding timing transparency to GFP (G.7041) mapping and its variant as given in G.Sup43 Clause 7.3 for 10GBase-R     Q11/15  
[ 243 ]  
 
2008-11-21 Alcatel - Lucent Germany   Considerations about Implementation friendly justification procressing of mapping of data into ODU4     Q11/15  
[ 242 ]  
 
2008-11-21 DS2   G.hn: Compression formats for the Ack message     Q4/15  
[ 241 ]  
 
2008-11-21 DS2   G.hn: Re-synchronization in STXOPs with CFTS     Q4/15  
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21