Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 315 ]
|
G.inp: Simulation Results for Evaluation of Retransmission Methods
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 314 ]
|
G.int: Proposal for Next-Generation LINK/PHY Interface
|
MII, China, Huawei, ZTE
|
Q4/15
|
2008-11-25 |
|
[ 313 ]
|
G.vector: Preventing Disruption of Existing Lines During Joining
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 312 ]
|
G.inp: More Simulation Results for Evaluation of Retransmission Methods
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 311 ]
|
G.vdsl: Improving the Performance of Upstream Power Back-off
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 310 ]
|
G.inp: Impact of Impulse Noise Sensor on Retransmission on Delta Interface
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 309 ]
|
G.int: Comments on LINK/PHY Interface
|
MII, China, Huawei, ZTE
|
Q4/15
|
2008-11-25 |
|
[ 308 ]
|
G.inp: An Updated Model for Retransmission between PMD and PMS-TC Sub-Layers
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 307 ]
|
G.8032 Flushing
|
Alcatel-Lucent
|
Q9/15
|
2008-11-25 |
|
[ 306 ]
|
G.8032 WTR and WTB comments
|
Alcatel-Lucent, AimValley BV
|
Q9/15
|
2008-11-25 |
|
[ 305 ]
|
G.8032 Statemachine
|
Alcatel-Lucent, AimValley BV
|
Q9/15
|
2008-11-25 |
|
[ 304 ]
|
G.8032 Priority Logic and Statemachine
|
Alcatel-Lucent, AimValley BV
|
Q9/15
|
2008-11-25 |
|
[ 303 ]
|
G.8032 Hidden Transitions
|
Alcatel-Lucent, AimValley BV
|
Q9/15
|
2008-11-25 |
|
[ 302 ]
|
Comparison between synchronization metrics
|
Nokia Siemens Networks
|
Q13/15
|
2008-11-25 |
|
[ 301 ]
|
VDSL: Noise testing with fluctuating crosstalk
|
BT plc
|
Q4/15
|
2008-11-25 |
|
[ 300 ]
|
Retransmission management in the TPS-TC layer
|
Infineon Technologies AG
|
Q4/15
|
2008-11-23 |
|
[ 299 ]
|
Proposal on automatic discovery requirements in WDM network in G.7714.1
|
ZTE Corporation
|
Q14/15
|
2008-11-23 |
|
[ 298 ]
|
Clarifications on Key Management in GPON System
|
ZTE Corporation
|
Q2/15
|
2008-11-23 |
|
[ 297 ]
|
BMC and SSM in 1588v2 Telecom Profiles for time/phase sync
|
ZTE Corporation
|
Q13/15
|
2008-11-23 |
|
[ 296 ]
|
Considerations about 1588v2 Telecom Profiles classification for time sync in G.8265
|
ZTE Corporation, CATR MII
|
Q13/15
|
2008-11-23 |
|
[ 295 ]
(Rev.1) |
Proposal to consider node resource management in G.8080 for WSON
|
ZTE Corporation
|
Q12/15
|
2008-11-23 |
|
[ 294 ]
|
Includes pending state to support flushing FDB in non_revertive mechanism (G.8032)
|
ZTE Corporation, China
|
Q9/15
|
2008-11-23 |
|
[ 293 ]
|
Flushing behaviour in interconnected ring protection (G.8032)
|
ZTE Corporation, China
|
Q9/15
|
2008-11-23 |
|
[ 292 ]
|
FDB Flush Problem in non_revertive operation
|
ZTE Corporation, China
|
Q9/15
|
2008-11-23 |
|
[ 291 ]
|
Difference between sub-ring and single ring protection (G.8032)
|
ZTE Corporation, China
|
Q9/15
|
2008-11-23 |
|
[ 290 ]
|
Comparison between shared-link and sub-ring models (G.8032)
|
ZTE Corporation, China
|
Q9/15
|
2008-11-23 |
|
[ 289 ]
|
Text Proposals in Appendix I for G.696.1 on mixed 10G/40G transmission
|
ZTE Corporation
|
Q6/15
|
2008-11-23 |
|
[ 288 ]
|
Proposals on optical attenuator parameters in G.671
|
ZTE Corporation, China
|
Q7/15
|
2008-11-23 |
|
[ 287 ]
|
Proposal on PDL and PMD parameters in G.671
|
ZTE Corporation, China
|
Q7/15
|
2008-11-23 |
|
[ 286 ]
|
Proposals to Add Coordination Between Source and Destination to section 6.2 of G.7713
|
ZTE Corporation
|
Q14/15
|
2008-11-23 |
|
[ 285 ]
|
Comments to G.8152
|
ZTE Corporation
|
Q14/15
|
2008-11-23 |
|
[ 284 ]
|
Comments to G.8052
|
ZTE Corporation
|
Q14/15
|
2008-11-23 |
|
[ 283 ]
|
Add "central frequency deviation" parameter for transmitter in G.698.2
|
ZTE
|
Q6/15
|
2008-11-23 |
|
[ 282 ]
|
G.lt: Time-varying interference measurement and characterisation
|
BT
|
Q4/15
|
2008-11-23 |
|
[ 281 ]
|
G.hn: Proposal for maximum wideband transmit power
|
Infineon Technologies AG
|
Q4/15
|
2008-11-23 |
|
[ 280 ]
|
G.hn: Proposal for text describing G.hn threat model
|
Infineon Technologies AG
|
Q4/15
|
2008-11-23 |
|
[ 279 ]
|
G.8032 protection switching transient traffic performance requirement for next study period
|
ETRI (Republic of Korea)
|
Q9/15
|
2008-11-23 |
|
[ 278 ]
|
FDB-delete scheme for fast protection switching in G.8032 Ethernet ring protection
|
ETRI (Korea, Republic of)
|
Q9/15
|
2008-11-23 |
|
[ 277 ]
|
Creation of a new TLV in ESMC channel in order to transport frequency stability level information
|
France Télécom, Tellabs
|
Q13/15
|
2008-11-23 |
|
[ 276 ]
|
Proposed text for drafting of PTPv2 telecom profile frequency-oriented
|
France Télécom, Tellabs
|
Q13/15
|
2008-11-23 |
|
[ 275 ]
|
Discussion about the use of "Announce" and "Management" messages for PTPv2 telecom profile frequency-oriented
|
France Télécom, Tellabs
|
Q13/15
|
2008-11-23 |
|
[ 274 ]
|
Standards for 112 Gbit/s serial transmission
|
Telecom Italia
|
Q6/15
|
2008-11-23 |
|
[ 273 ]
|
Study items for Q6/15
|
Italy
|
Q6/15
|
2008-11-23 |
|
[ 272 ]
|
Naming Considerations regarding T-MPLS and MPLS-TP within ITU-T
|
Alcatel-Lucent Italia, Alcatel Shanghai Bell, Ital
|
Q9/15, Q3/15, Q11/15
|
2008-11-23 |
|
[ 271 ]
|
Restoration exercise
|
ZTE Corporation
|
Q14/15, Q12/15
|
2008-11-23 |
|
[ 270 ]
|
Document withdrawn (See C89)
|
Italy
|
Q6/15
|
2008-11-23 |
|
[ 269 ]
|
G.hn: Profiles
|
CopperGate Communications
|
Q4/15
|
2008-11-21 |
|
[ 268 ]
|
G.hn: Proposal for fixed window setting
|
Infineon Technologies AG
|
Q4/15
|
2008-11-21 |
|
[ 267 ]
|
G.hn: Proposal to associate EVM values with the transmit power levels
|
Infineon Technologies AG, DS2
|
Q4/15
|
2008-11-21 |
|
[ 266 ]
|
Withdrawn
|
N/A
|
|
1753-01-01 |
Results:2390 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):