International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 315 ]  
 
2008-11-25 MII, China, Huawei   G.inp: Simulation Results for Evaluation of Retransmission Methods     Q4/15  
[ 314 ]  
 
2008-11-25 MII, China, Huawei, ZTE   G.int: Proposal for Next-Generation LINK/PHY Interface     Q4/15  
[ 313 ]  
 
2008-11-25 MII, China, Huawei   G.vector: Preventing Disruption of Existing Lines During Joining     Q4/15  
[ 312 ]  
 
2008-11-25 MII, China, Huawei   G.inp: More Simulation Results for Evaluation of Retransmission Methods     Q4/15  
[ 311 ]  
 
2008-11-25 MII, China, Huawei   G.vdsl: Improving the Performance of Upstream Power Back-off     Q4/15  
[ 310 ]  
 
2008-11-25 MII, China, Huawei   G.inp: Impact of Impulse Noise Sensor on Retransmission on Delta Interface     Q4/15  
[ 309 ]  
 
2008-11-25 MII, China, Huawei, ZTE   G.int: Comments on LINK/PHY Interface     Q4/15  
[ 308 ]  
 
2008-11-25 MII, China, Huawei   G.inp: An Updated Model for Retransmission between PMD and PMS-TC Sub-Layers     Q4/15  
[ 307 ]  
 
2008-11-25 Alcatel-Lucent   G.8032 Flushing     Q9/15  
[ 306 ]  
 
2008-11-25 Alcatel-Lucent, AimValley BV   G.8032 WTR and WTB comments     Q9/15  
[ 305 ]  
 
2008-11-25 Alcatel-Lucent, AimValley BV   G.8032 Statemachine     Q9/15  
[ 304 ]  
 
2008-11-25 Alcatel-Lucent, AimValley BV   G.8032 Priority Logic and Statemachine     Q9/15  
[ 303 ]  
 
2008-11-25 Alcatel-Lucent, AimValley BV   G.8032 Hidden Transitions     Q9/15  
[ 302 ]  
 
2008-11-25 Nokia Siemens Networks   Comparison between synchronization metrics     Q13/15  
[ 301 ]  
 
2008-11-25 BT plc   VDSL: Noise testing with fluctuating crosstalk     Q4/15  
[ 300 ]  
 
2008-11-23 Infineon Technologies AG   Retransmission management in the TPS-TC layer     Q4/15  
[ 299 ]  
 
2008-11-23 ZTE Corporation   Proposal on automatic discovery requirements in WDM network in G.7714.1     Q14/15  
[ 298 ]  
 
2008-11-23 ZTE Corporation   Clarifications on Key Management in GPON System     Q2/15  
[ 297 ]  
 
2008-11-23 ZTE Corporation   BMC and SSM in 1588v2 Telecom Profiles for time/phase sync     Q13/15  
[ 296 ]  
 
2008-11-23 ZTE Corporation, CATR MII   Considerations about 1588v2 Telecom Profiles classification for time sync in G.8265     Q13/15  
[ 295 ]  
(Rev.1) 
2008-11-23 ZTE Corporation   Proposal to consider node resource management in G.8080 for WSON     Q12/15  
[ 294 ]  
 
2008-11-23 ZTE Corporation, China   Includes pending state to support flushing FDB in non_revertive mechanism (G.8032)     Q9/15  
[ 293 ]  
 
2008-11-23 ZTE Corporation, China   Flushing behaviour in interconnected ring protection (G.8032)     Q9/15  
[ 292 ]  
 
2008-11-23 ZTE Corporation, China   FDB Flush Problem in non_revertive operation     Q9/15  
[ 291 ]  
 
2008-11-23 ZTE Corporation, China   Difference between sub-ring and single ring protection (G.8032)     Q9/15  
[ 290 ]  
 
2008-11-23 ZTE Corporation, China   Comparison between shared-link and sub-ring models (G.8032)     Q9/15  
[ 289 ]  
 
2008-11-23 ZTE Corporation   Text Proposals in Appendix I for G.696.1 on mixed 10G/40G transmission     Q6/15  
[ 288 ]  
 
2008-11-23 ZTE Corporation, China   Proposals on optical attenuator parameters in G.671     Q7/15  
[ 287 ]  
 
2008-11-23 ZTE Corporation, China   Proposal on PDL and PMD parameters in G.671     Q7/15  
[ 286 ]  
 
2008-11-23 ZTE Corporation   Proposals to Add Coordination Between Source and Destination to section 6.2 of G.7713     Q14/15  
[ 285 ]  
 
2008-11-23 ZTE Corporation   Comments to G.8152     Q14/15  
[ 284 ]  
 
2008-11-23 ZTE Corporation   Comments to G.8052     Q14/15  
[ 283 ]  
 
2008-11-23 ZTE   Add "central frequency deviation" parameter for transmitter in G.698.2     Q6/15  
[ 282 ]  
 
2008-11-23 BT   G.lt: Time-varying interference measurement and characterisation     Q4/15  
[ 281 ]  
 
2008-11-23 Infineon Technologies AG   G.hn: Proposal for maximum wideband transmit power     Q4/15  
[ 280 ]  
 
2008-11-23 Infineon Technologies AG   G.hn: Proposal for text describing G.hn threat model     Q4/15  
[ 279 ]  
 
2008-11-23 ETRI (Republic of Korea)   G.8032 protection switching transient traffic performance requirement for next study period     Q9/15  
[ 278 ]  
 
2008-11-23 ETRI (Korea, Republic of)   FDB-delete scheme for fast protection switching in G.8032 Ethernet ring protection     Q9/15  
[ 277 ]  
 
2008-11-23 France Télécom, Tellabs   Creation of a new TLV in ESMC channel in order to transport frequency stability level information     Q13/15  
[ 276 ]  
 
2008-11-23 France Télécom, Tellabs   Proposed text for drafting of PTPv2 telecom profile frequency-oriented     Q13/15  
[ 275 ]  
 
2008-11-23 France Télécom, Tellabs   Discussion about the use of "Announce" and "Management" messages for PTPv2 telecom profile frequency-oriented     Q13/15  
[ 274 ]  
 
2008-11-23 Telecom Italia   Standards for 112 Gbit/s serial transmission     Q6/15  
[ 273 ]  
 
2008-11-23 Italy   Study items for Q6/15     Q6/15  
[ 272 ]  
 
2008-11-23 Alcatel-Lucent Italia, Alcatel Shanghai Bell, Ital   Naming Considerations regarding T-MPLS and MPLS-TP within ITU-T     Q9/15, Q3/15, Q11/15  
[ 271 ]  
 
2008-11-23 ZTE Corporation   Restoration exercise     Q14/15, Q12/15  
[ 270 ]  
 
2008-11-23 Italy   Document withdrawn (See C89)     Q6/15  
[ 269 ]  
 
2008-11-21 CopperGate Communications   G.hn: Profiles     Q4/15  
[ 268 ]  
 
2008-11-21 Infineon Technologies AG   G.hn: Proposal for fixed window setting     Q4/15  
[ 267 ]  
 
2008-11-21 Infineon Technologies AG, DS2   G.hn: Proposal to associate EVM values with the transmit power levels     Q4/15  
[ 266 ]  
 
1753-01-01 N/A   Withdrawn     N/A  
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21