International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title AI/Question
[ 490 ]  
 
2009-09-17 Nortel Networks (Canada)   Interlayer Signalling Abstract Messages     Q14/15  
[ 489 ]  
 
2009-09-17 Nortel Networks (Canada)   G.8032 priorities for next version     Q9/15  
[ 488 ]  
 
2009-09-17 Integrated Device Technology (IDT)   IEEE-1588 Profile Identifier     Q13/15  
[ 487 ]  
 
2009-09-17 Integrated Device Technology (IDT)   IEEE-1588 and Synchronous Ethernet Architecture for G.8264.1     Q13/15  
[ 486 ]  
 
2009-09-17 Integrated Device Technology (IDT)   IEEE-1588 Master/Slave Architecture for G.8264.1     Q13/15  
[ 485 ]  
 
2009-09-17 Integrated Device Technology (IDT)   Clause 8.6 of G.8264.1 - Unicast message negotiation     Q13/15  
[ 484 ]  
 
2009-09-17 Swisscom (Switzerland) Ltd.   G.vector: Swisscom's views on vectoring     Q4/15  
[ 483 ]  
 
2009-09-17 CLPAJ & NTT   Proposals on revision of Recommendations G.652 and G.655.     Q5/15  
[ 482 ]  
 
2009-09-17 Alcatel-Lucent   Delivery of Frequency and Time Synchronization via PTP instances     Q13/15  
[ 481 ]  
 
2009-09-17 Integrated Device Technology (IDT)   Best Master Clock Algorithm     Q13/15  
[ 480 ]  
 
2009-09-17 Nortel Networks (Canada)   Relationship between wideband jitter and IEEE jitter specifications     Q13/15  
[ 479 ]  
 
2009-09-17 Telefónica, S.A.   Support for the approval of G.9960 and consent of G.hn Recommendations     Q4/15  
[ 478 ]  
 
2009-09-17 Nortel Networks (Canada)   Correction of potential ambiguity in G.8264 ESMC PDU     Q13/15  
[ 477 ]  
 
2009-09-17 Nortel Networks (Canada)   Clock protection aspects of the ordinary clock model of IEEE(TM)-1588-2008     Q13/15  
[ 476 ]  
 
2009-09-17 Nortel Networks (Canada)   G.8032 (Ring Interconnection Flush Issue)     Q9/15  
[ 475 ]  
 
2009-09-16 Nortel Networks (Canada)   G.8032 Ring Interconnect Performance     Q9/15  
[ 474 ]  
 
2009-09-16 Nortel Networks (Canada)   G.8032 E-LINE Support     Q9/15  
[ 473 ]  
 
2009-09-16 Ericsson   Details on Time Sync Methods in G.8266     Q13/15  
[ 472 ]  
 
2009-09-16 China Telecom , CATR , China Unicom , CMCC   Requirement of Embedded Latency Measurement in OTN Networks     Q11/15  
[ 471 ]  
 
2009-09-16 China Telecom , Huawei   CPRI over OTN requirement     Q11/15  
[ 470 ]  
 
2009-09-16 Ericsson   Time Sync Master definition in G.8266     Q13/15  
[ 469 ]  
 
2009-09-16 NTT , NEC , OKI , SEI   G.vector: Proposed Working Text for the crosstalk channel model optimized for Japanese environment in G.vector Appendix     Q4/15  
[ 468 ]  
 
2009-09-16 Ericsson AB   IPR: IPR Declaration of Ericsson AB with respect to G.996.2     Q4/15  
[ 467 ]  
 
2009-09-16 NTT   Proposal to introduce multi-granularity in photonic cross-connect switching in AON/WSON     Q12/15  
[ 466 ]  
 
2009-09-16 NTT   Proposal to promote discussions on optical components for advanced modulation/demodulation schemes used for high-speed large-capacity WDM transmission     Q7/15  
[ 465 ]  
 
2009-09-16 Fujitsu   Comments on Draft revised G.709 (TD95/Plen)     Q11/15  
[ 464 ]  
 
2009-09-16 Fujitsu   Proposed further clarification on Draft revised G.709 (TD95/Plen)     Q11/15  
[ 463 ]  
 
2009-09-16 Fujitsu   Proposed removal of Appendix I from Y.1731     Q10/15  
[ 462 ]  
 
2009-09-16 Fujitsu   Consideration on progressing G.873.1     Q9/15, Q3/15  
[ 461 ]  
 
2009-09-16 Fujitsu   Comments on draft revised G.798 (TD98/Plen)     Q9/15  
[ 460 ]  
 
2009-09-16 Fujitsu   Proposed modification for G.8121 and consideration of Ethernet as MPLS-TP client     Q9/15, Q14/15, Q12/15, Q10/15  
[ 459 ]  
 
2009-09-16 Fujitsu   Proposed restructuring of G.806     Q9/15  
[ 458 ]  
 
2009-09-16 Fujitsu   Proposed agreement on ETH-LT progress     Q9/15, Q10/15  
[ 457 ]  
 
2009-09-16 Ericsson   Directory listing capability, file transfer controller in G.984.4 am 2     Q2/15  
[ 456 ]  
 
2009-09-16 Ericsson   Document withdrawn     Q2/15  
[ 455 ]  
 
2009-09-16 Ericsson   Additional VoIP attributes in G.984.4 am 2     Q2/15  
[ 454 ]  
 
2009-09-16 Huawei Technologies , CATR , MII   Proposal to study Shared Mesh Protection     Q9/15  
[ 453 ]  
 
2009-09-16 Huawei Technologies   Considerations on the description of the ODU layer network in G.872 and G.8080     Q14/15, Q12/15  
[ 452 ]  
 
2009-09-16 Huawei Technologies   Transfer delay for FC over OTN     Q11/15  
[ 451 ]  
 
2009-09-16 NTT   Summary of correspondence activity on new supplement G.Sup.gafc     Q5/15  
[ 450 ]  
 
2009-09-16 NTT   Proposal on modification of Appendix I of Rec. G.971     Q8/15  
[ 449 ]  
 
2009-09-16 NTT   Proposed draft text for new appendix of Rec. G.976     Q8/15  
[ 448 ]  
 
2009-09-16 NTT   Proposal on modification of Appendix II of Rec. G.650.1     Q5/15  
[ 447 ]  
 
2009-09-16 Mitsubishi Electric Corporation   Proposed texts for clause 11.2.1 of G.8031     Q9/15  
[ 446 ]  
 
2009-09-16 N/A   Document withdrawn      
[ 445 ]  
 
2009-09-16 Huawei Technologies   Management of high capacity connections in the OTN     Q12/15  
[ 444 ]  
 
2009-09-16 N/A   Document withdrawn     Q14/15  
[ 443 ]  
 
2009-09-16 Huawei Technologies   Text proposal to align clause 9/G.872 with draft revised G.709     Q12/15  
[ 442 ]  
 
2009-09-16 N/A   Document withdrawn      
[ 441 ]  
 
2009-09-16 Huawei Technologies , China Mobile Communications Corporation , PMC-Sierra   GPON over OTN mapping     Q2/15, Q11/15  
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21