Français
Español
Home
:
ITU-T
:
SG15
:
Contributions
Recently posted
-
Search Meeting Documents
ITU-T SG15 C
ITU-T SG15
Max # of documents displayed/page:
Transport network structures
Study Period 2009
Results:
2390
total items.
Result page:
Previous
-
1
-
2
-
3
-
4
-
5
-
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
-
26
-
27
-
28
-
29
-
30
-
31
-
32
-
33
-
34
-
35
-
36
-
37
-
38
-
39
-
40
-
41
-
42
-
43
-
44
-
45
-
46
-
47
-
48
-
Next
Contributions
Number
Title
Source
AI/Question
Filter...
2/15
9/15
Q1/15
Q1/5
Q10/15
Q11/15
Q12/15
Q13/15
Q14/15
Q15/15
Q1515
Q16/15
Q17/15
Q18/15
Q2/15
Q3/15
Q4/15
Q4A/15
Q4B/15
Q4C/15
Q5/15
Q6/15
Q7/15
Q8/15
Q9/15
QALL/15
Clear filter
Date
[ 690 ]
Proposal on the state machine and APS PDU in G.8031
Huawei Technologies
Q9/15
2009-09-20
[ 689 ]
Proposal on ACL-SNCG/I protection switching for microwave network in G.8031
Huawei Technologies
Q9/15
2009-09-20
[ 688 ]
Proposal on extending linear protection switching for variable link in G.808.1
Huawei Technologies
9/15
2009-09-20
[ 687 ]
QL to clockClass mapping
Huawei Technologies
,
France Telecom Orange
Q13/15
2009-09-20
[ 686 ]
Discussion of G.8264.1 Message Forwarding Behaviour
Huawei Technologies
Q13/15
2009-09-20
[ 685 ]
Packet Master Traffic Load Analysis based on ITU-T PTP profile message rates
Huawei Technologies
,
CATR
,
MII
Q13/15
2009-09-20
[ 684 ]
(Rev.1)
Proposal on adding bandwidth notification function in G.808.1 and G.8031
Huawei Technologies
Q9/15
2009-09-20
[ 683 ]
G.800 Transport Entities
Huawei Technologies
Q12/15
2009-09-20
[ 682 ]
Discussion on the use of PTP domains in the PTPv2 telecom profile frequency-oriented
France Telecom Orange
Q13/15
2009-09-20
[ 681 ]
Application of IEEE1588-2008 sections A.9 (recommendation for unicast), 17.5 (unicast discovery) and 17.6 (acceptable master table) to the PTPv2 telecom profile frequency-oriented
France Telecom Orange
Q13/15
2009-09-20
[ 680 ]
Unicast message negotiation notes and corrections
France Telecom Orange
Q13/15
2009-09-20
[ 679 ]
Discussion on Synchronous Ethernet jitter specification
France Telecom Orange
Q13/15
2009-09-20
[ 678 ]
Application of IEEE1588-2008 section 19.3 to the PTPv2 telecom profile frequency-oriented
France Telecom Orange
Q13/15
2009-09-20
[ 677 ]
Use of physical methods to deliver timing in a multi-operator context
France Telecom Orange
Q13/15
2009-09-20
[ 676 ]
OTN island wander budget
France Telecom Orange
Q13/15
2009-09-20
[ 675 ]
Options to be considered for the definition of an Alternate BMCA in the scope of the PTPv2 telecom profile frequency-oriented
France Telecom Orange
Q13/15
2009-09-20
[ 674 ]
Ordinary clock attributes and data sets
France Telecom Orange
Q13/15
2009-09-20
[ 673 ]
Methodology for PDV network limits definition
France Telecom Orange
Q13/15
2009-09-20
[ 672 ]
Editorial comments in the latest draft of G.8264.1 (PTPv2 telecom profile frequency-oriented)
France Telecom Orange
Q13/15
2009-09-20
[ 671 ]
Discussion on the BMCA requirements of the PTPv2 telecom profile frequency-oriented
France Telecom Orange
Q13/15
2009-09-20
[ 670 ]
Discussion about the use of an "acceptable slave table" new feature in the PTPv2 telecom profile frequency-oriented
France Telecom Orange
Q13/15
2009-09-20
[ 669 ]
France Telecom view on the approval of Recommendation G.9960
France Telecom Orange
Q4/15
2009-09-20
[ 668 ]
Performance aspects of a packet slave clock targeting 50ppb and based on a physical clock with a large time constant and PDV accumulation discussions
France Telecom Orange
Q13/15
2009-09-20
[ 667 ]
Improve Main ring flushing due to sub-ring topology change through Port based flushing
Tejas Networks Ltd
Q9/15
2009-09-20
[ 666 ]
FS operation during node failure
Tejas Networks Ltd
Q9/15
2009-09-20
[ 665 ]
BPR Operation
Tejas Networks Ltd
Q9/15
2009-09-20
[ 664 ]
Traffic Black Holing with Multiple Failures
Tejas Networks Ltd
Q9/15
2009-09-20
[ 663 ]
Definitions of unidirectional support for Synchronous Ethernet.
Tellabs
Q13/15
2009-09-20
[ 662 ]
Discussion on providing an accurate time synchronization service using the native capabilities of time capable network technologies.
Tellabs
,
France Telecom Orange
Q2/15
2009-09-20
[ 661 ]
G.hn: Support of variable AIFG in G.hn
DS2
Q4/15
2009-09-20
[ 660 ]
G.hn: Proposed text modification for section 8.11 (Channel estimation protocol)
DS2
Q4/15
2009-09-20
[ 659 ]
G.hn: Update of the IFG-related text of 8.2, 8.3
Infineon Technologies AEG
Q4/15
2009-09-20
[ 658 ]
G.hn: Proposed text for TS grid synchronization recovery
DS2
Q4/15
2009-09-20
[ 657 ]
G.hn: Text updates for Acknowledgement Protocol operation
DS2
Q4/15
2009-09-20
[ 656 ]
G.hn: Transmission and reception window operation in Multicast traffic with Acks.
DS2
Q4/15
2009-09-20
[ 655 ]
G.hn: Flexible PHY-frame header extension
DS2
Q4/15
2009-09-20
[ 654 ]
G.hn: Updated proposal on topology discovery and routing calculation
DS2
Q4/15
2009-09-20
[ 653 ]
Proposal for RMAP Relaying
DS2
Q4/15
2009-09-20
[ 652 ]
Status of Support for Relays in G.hn
DS2
Q4/15
2009-09-20
[ 651 ]
Proposal for Registration via Relays
DS2
Q4/15
2009-09-20
[ 650 ]
Updated proposal for Neighbor Networks Support
DS2
Q4/15
2009-09-20
[ 649 ]
Adding FLOWID/PRIO field to ACK Frame Type
DS2
Q4/15
2009-09-20
[ 648 ]
Proposal for Authentication via Relays
DS2
Q4/15
2009-09-20
[ 647 ]
Bursting of ACK messages
DS2
Q4/15
2009-09-20
[ 646 ]
Extending DOMAIN_ID field to 6 bits
DS2
Q4/15
2009-09-20
[ 645 ]
G.hn: Proposal to update the text of section 8.9.2 (Multicast and broadcast transmission)
Infineon Technologies
Q4/15
2009-09-20
[ 644 ]
Duplication in G.LT issues list
BT plc
Q4/15
2009-09-20
[ 643 ]
G.lt: New MELT-PMD Configuration Parameters
Infineon Technologies
Q4/15
2009-09-20
[ 642 ]
G.inp: Example of transmit state machine for initialization
Infineon Technologies
Q4/15
2009-09-20
[ 641 ]
G.inp: Modifications to section 9.6 of G.inp
Infineon Technologies
Q4/15
2009-09-20
Results:
2390
total items.
Result page:
Previous
-
1
-
2
-
3
-
4
-
5
-
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
-
26
-
27
-
28
-
29
-
30
-
31
-
32
-
33
-
34
-
35
-
36
-
37
-
38
-
39
-
40
-
41
-
42
-
43
-
44
-
45
-
46
-
47
-
48
-
Next
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Test ITU Translate for automated document translation
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2021-01-29