International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58 - 59 - 60 - 61 - 62 - 63 - 64 - 65 - 66 - 67 - 68 - 69 - 70 - 71 - 72 - 73 - 74 - 75 - 76 - 77 - 78 - 79 - 80 - 81 - 82 - 83 - 84 - 85 - 86 - 87 - 88 - 89 - 90 - 91 - 92 - 93 - 94 - 95 - 96  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 690 ]  
 
2009-09-20 Huawei Technologies   Proposal on the state machine and APS PDU in G.8031     Q9/15  
[ 689 ]  
 
2009-09-20 Huawei Technologies   Proposal on ACL-SNCG/I protection switching for microwave network in G.8031     Q9/15  
[ 688 ]  
 
2009-09-20 Huawei Technologies   Proposal on extending linear protection switching for variable link in G.808.1     9/15  
[ 687 ]  
 
2009-09-20 Huawei Technologies , France Telecom Orange   QL to clockClass mapping     Q13/15  
[ 686 ]  
 
2009-09-20 Huawei Technologies   Discussion of G.8264.1 Message Forwarding Behaviour     Q13/15  
[ 685 ]  
 
2009-09-20 Huawei Technologies , CATR , MII   Packet Master Traffic Load Analysis based on ITU-T PTP profile message rates     Q13/15  
[ 684 ]  
(Rev.1) 
2009-09-20 Huawei Technologies   Proposal on adding bandwidth notification function in G.808.1 and G.8031     Q9/15  
[ 683 ]  
 
2009-09-20 Huawei Technologies   G.800 Transport Entities     Q12/15  
[ 682 ]  
 
2009-09-20 France Telecom Orange   Discussion on the use of PTP domains in the PTPv2 telecom profile frequency-oriented     Q13/15  
[ 681 ]  
 
2009-09-20 France Telecom Orange   Application of IEEE1588-2008 sections A.9 (recommendation for unicast), 17.5 (unicast discovery) and 17.6 (acceptable master table) to the PTPv2 telecom profile frequency-oriented     Q13/15  
[ 680 ]  
 
2009-09-20 France Telecom Orange   Unicast message negotiation notes and corrections     Q13/15  
[ 679 ]  
 
2009-09-20 France Telecom Orange   Discussion on Synchronous Ethernet jitter specification     Q13/15  
[ 678 ]  
 
2009-09-20 France Telecom Orange   Application of IEEE1588-2008 section 19.3 to the PTPv2 telecom profile frequency-oriented     Q13/15  
[ 677 ]  
 
2009-09-20 France Telecom Orange   Use of physical methods to deliver timing in a multi-operator context     Q13/15  
[ 676 ]  
 
2009-09-20 France Telecom Orange   OTN island wander budget     Q13/15  
[ 675 ]  
 
2009-09-20 France Telecom Orange   Options to be considered for the definition of an Alternate BMCA in the scope of the PTPv2 telecom profile frequency-oriented     Q13/15  
[ 674 ]  
 
2009-09-20 France Telecom Orange   Ordinary clock attributes and data sets     Q13/15  
[ 673 ]  
 
2009-09-20 France Telecom Orange   Methodology for PDV network limits definition     Q13/15  
[ 672 ]  
 
2009-09-20 France Telecom Orange   Editorial comments in the latest draft of G.8264.1 (PTPv2 telecom profile frequency-oriented)     Q13/15  
[ 671 ]  
 
2009-09-20 France Telecom Orange   Discussion on the BMCA requirements of the PTPv2 telecom profile frequency-oriented     Q13/15  
[ 670 ]  
 
2009-09-20 France Telecom Orange   Discussion about the use of an "acceptable slave table" new feature in the PTPv2 telecom profile frequency-oriented     Q13/15  
[ 669 ]  
 
2009-09-20 France Telecom Orange   France Telecom view on the approval of Recommendation G.9960     Q4/15  
[ 668 ]  
 
2009-09-20 France Telecom Orange   Performance aspects of a packet slave clock targeting 50ppb and based on a physical clock with a large time constant and PDV accumulation discussions     Q13/15  
[ 667 ]  
 
2009-09-20 Tejas Networks Ltd   Improve Main ring flushing due to sub-ring topology change through Port based flushing     Q9/15  
[ 666 ]  
 
2009-09-20 Tejas Networks Ltd   FS operation during node failure     Q9/15  
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58 - 59 - 60 - 61 - 62 - 63 - 64 - 65 - 66 - 67 - 68 - 69 - 70 - 71 - 72 - 73 - 74 - 75 - 76 - 77 - 78 - 79 - 80 - 81 - 82 - 83 - 84 - 85 - 86 - 87 - 88 - 89 - 90 - 91 - 92 - 93 - 94 - 95 - 96  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21