International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58 - 59 - 60 - 61 - 62 - 63 - 64 - 65 - 66 - 67 - 68 - 69 - 70 - 71 - 72 - 73 - 74 - 75 - 76 - 77 - 78 - 79 - 80 - 81 - 82 - 83 - 84 - 85 - 86 - 87 - 88 - 89 - 90 - 91 - 92 - 93 - 94 - 95 - 96  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 790 ]  
 
2010-05-14 Canada   Concern with bandwidth degrade notification for Y.1731     Q9/15, Q10/15  
[ 789 ]  
 
2010-05-14 Canada   Concern with G.ptneq & E-OTN     Q9/15, Q12/15  
[ 788 ]  
 
2010-05-14 Canada   Concern with ETREE proposal for G.ptneq & E-OTN     Q9/15, Q10/15  
[ 787 ]  
 
2010-05-14 N/A   Document withdrawn (see TD 317/WP3)     N/A  
[ 786 ]  
 
2010-05-14 Alcatel-Lucent Italy   Ethernet Proactive Frame Delay Measurement     Q9/15, Q14/15, Q10/15  
[ 785 ]  
 
2010-05-14 Alcatel-Lucent , BT , Cable & Wireless Communications , France Telecom Orange , Nokia Siemens Networks , Swisscom , Technicolor , Telecom Italia , Telekomunikacja Polska   Proposed ITU-T Rec. on remote management of CPE     Q4/15, Q2/15, Q1/15  
[ 784 ]  
 
2010-05-12 Federal Republic of Germany   Request for revising ITU-T Rec. G.9960 Unified high-speed wire-line based home networking transceivers - Foundation     Q4/15  
[ 783 ]  
 
2010-05-12 Federal Republic of Germany   Support for the approval of G.9961, G.9960 Corrigendum 1, and G.9972 Recommendations     Q4/15  
[ 782 ]  
 
2010-05-12 Alcatel-Lucent Bell NV   Proposed New Recommendation on remote management of CPE over broadband networks - CPE WAN Management Protocol (CWMP)     Q4/15, Q2/15, Q1/15  
[ 781 ]  
 
2010-05-11 Alcatel-Lucent   Proposed text for the revision of ITU-T Recommendation G.7712     Q14/15  
[ 780 ]  
 
2010-05-10 France Télécom , Cisco   Test plan for PDV generation of a single equipment involved in IEEE1588-2008 transport     Q13/15  
[ 779 ]  
 
2010-05-10 Symmetricom, LSI   Proposed Primary Reference Time Clock Performance for G.8271     Q13/15  
[ 778 ]  
 
2010-05-11 JDSU   Proposed jitter specifications for O.174     Q15/15  
[ 777 ]  
 
2010-05-11 Alcatel Lucent Germany   G.873.2 text proposal for Sections 7.1 and following     Q9/15  
[ 776 ]  
 
2010-05-10 Alcatel Lucent Germany   G.873.2 text for wrapping versus steering comparison     Q9/15  
[ 775 ]  
 
2010-05-10 Symmetricom   Support for the mixed unicast/multicast mode of operation in G.8265.1     Q13/15  
[ 774 ]  
 
2010-05-10 Symmetricom   PDV histogram plot for G.8260 Appendix I     Q13/15  
[ 773 ]  
 
2010-05-10 Symmetricom   Measurement configuration for PDV measurements     Q13/15  
[ 772 ]  
 
2010-05-10 Symmetricom   Relationship of PDV metrics to PTP slave performance     Q13/15  
[ 771 ]  
 
2010-05-10 Symmetricom , Nokia-Siemens   xTDEV/MAFE Definitions and Usage for G.8260 Appendix     Q13/15  
[ 770 ]  
 
2010-05-10 Symmetricom   Definition of Time Error and PDV for packet timing signals     Q13/15  
[ 769 ]  
 
2010-05-10 Symmetricom   Definition of Packet Delay Variation (PDV) for timing applications     Q13/15  
[ 768 ]  
 
2010-05-10 Symmetricom   Definition of "Packet Based Method" in G.8260     Q13/15  
[ 767 ]  
 
2010-05-10 Symmetricom   The need for multiple protocol instances in PTP slaves     Q13/15  
[ 766 ]  
 
2010-05-10 Symmetricom   Comments by John Eidson on the PTP Telecom Profile for Frequency Distribution     Q13/15  
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58 - 59 - 60 - 61 - 62 - 63 - 64 - 65 - 66 - 67 - 68 - 69 - 70 - 71 - 72 - 73 - 74 - 75 - 76 - 77 - 78 - 79 - 80 - 81 - 82 - 83 - 84 - 85 - 86 - 87 - 88 - 89 - 90 - 91 - 92 - 93 - 94 - 95 - 96  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21