Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 865 ]
|
G.8260: methodology to perform a PDV measurement
|
France Télécom, Ericsson
|
Q13/15
|
2010-05-18 |
|
[ 864 ]
|
G.hnem: Report on informal ad-hoc - Performance of the FEC for G.hnem
|
Lantiq
,
DS2
,
Yitran
|
Q4/15
|
2010-05-18 |
|
[ 863 ]
|
G.hnem: Proposal to specify immediate acknowledgement
|
Lantiq
|
Q4/15
|
2010-05-18 |
|
[ 862 ]
(Rev.1) |
The removal of Floor Delay steps in Network PDV metrics
|
Calnex Solutions
|
Q13/15
|
2010-05-18 |
|
[ 861 ]
|
Development of a Wander requirement for 1588v2 Boundary Clocks
|
Calnex Solutions
|
Q13/15
|
2010-05-18 |
|
[ 860 ]
|
Proposed addition of 'No APS Message Received' defect to G.8021
|
Tellabs
|
Q9/15
|
2010-05-18 |
|
[ 859 ]
|
Further considerations for ODUk delay measurement processes
|
Tellabs
|
Q9/15
|
2010-05-18 |
|
[ 858 ]
|
Adding administrative state to ODU multiplexing adaptation functions
|
Tellabs
|
Q9/15
|
2010-05-18 |
|
[ 857 ]
|
G.hnem: Proposal for G.hnem encryption scheme
|
Lantiq
|
Q4/15
|
2010-05-18 |
|
[ 856 ]
|
G.INP: SRA Proposal for G.998.4
|
Broadcom
|
Q4/15
|
2010-05-18 |
|
[ 855 ]
|
G.vdsl: Proposed Text for Distribution of Time-of-Day over VDSL2 Links
|
Broadcom
|
Q4/15
|
2010-05-18 |
|
[ 854 ]
|
G.vdsl: G.adsl: Comments and way forward on INM accuracy
|
Broadcom
|
Q4/15
|
2010-05-18 |
|
[ 853 ]
|
Proposed description of optical source for optical phase sensitive modulation/demodulation schemes used for high-speed large-capacity WDM transmission
|
NTT
|
Q7/15
|
2010-05-17 |
|
[ 852 ]
|
Proposal for adding a new category, A3, to ITU-T Recommendation G.657 (Full Texts)
|
Corning
|
Q5/15
|
2010-05-17 |
|
[ 851 ]
|
Number not used
|
SoftBank Telecom
|
Q5/15
|
2010-05-17 |
|
[ 850 ]
|
VDSL2 issues for discussion at dedicated DSL meetings
|
Swisscom Ltd
|
Q4/15
|
2010-05-17 |
|
[ 849 ]
|
Proposal for adding a new sub-category, A3, to ITU-T Recommendation G.657 (Explanation)
|
Corning
|
Q5/15
|
2010-05-17 |
|
[ 848 ]
|
Draft supplement: 10-Gigabit-capable Passive Optical Networks (XG-PON): MAC/SERDES TO PMD interface
|
PMC-Sierra
|
Q2/15
|
2010-05-17 |
|
[ 847 ]
|
Noise transfer on the same SyncE copper port
|
Cisco
|
Q13/15
|
2010-05-17 |
|
[ 846 ]
|
Standardisation of DP-QPSK modulation format
|
Ciena Corporation
|
Q6/15
|
2010-05-17 |
|
[ 845 ]
|
An Approach to Include OTN interfaces in Optical Fibre Submarine Cable Systems
|
China Unicom
|
Q8/15
|
2010-05-17 |
|
[ 844 ]
|
G.8262 V.2 minor comments
|
Deutsche Telekom
|
Q13/15
|
2010-05-17 |
|
[ 843 ]
|
Flush Logic for Non-virtual Channel
|
Nokia Siemens Networks
|
Q9/15
|
2010-05-17 |
|
[ 842 ]
|
Time and Phase Sync noise budget in G.8271
|
Ericsson
|
Q13/15
|
2010-05-17 |
|
[ 841 ]
|
Details on Time Sync Methods in G.8271
|
Ericsson
|
Q13/15
|
2010-05-17 |
|
[ 840 ]
|
Time and Phase Sync Requirements Updates in G.8271
|
Ericsson
|
Q13/15
|
2010-05-17 |
|
[ 839 ]
|
G.8261.1 scope proposal
|
Ericsson
|
Q13/15
|
2010-05-17 |
|
[ 838 ]
|
Discussion on CPRI over OTN Sync Requirements
|
Ericsson
|
Q13/15
|
2010-05-17 |
|
[ 837 ]
|
Proposal to update Appendix of G.696.1 considering PDL-induced penalty in polarization-multiplexed WDM systems
|
KDDI
|
Q6/15
|
2010-05-17 |
|
[ 836 ]
|
Proposal for the study of an evaluation standard for relatively low baud-rate optical signal modulation technique and coherent detection technique
|
KDDI
|
Q6/15
|
2010-05-17 |
|
[ 835 ]
|
Fibre macrobending detection method
|
SoftBank Telecom
|
Q5/15
|
2010-05-17 |
|
[ 834 ]
|
Compatibility among different fibre types
|
Italy
|
Q5/15
|
2010-05-17 |
|
[ 833 ]
|
Bend insensitive fibres: splices compatibility
|
Italy
|
Q5/15
|
2010-05-17 |
|
[ 832 ]
|
Optional OAM Toolset for MPLS-TP technology to promptly satisfy market needs
|
Italy
|
Q10/15
|
2010-05-17 |
|
[ 831 ]
|
New Recommendation G.rmon
|
Italy
|
Q6/15
|
2010-05-17 |
|
[ 830 ]
|
Considerations about SD in G.8031
|
Alcatel-Lucent
|
Q9/15
|
2010-05-17 |
|
[ 829 ]
|
Considerations about MPLS-TP OAM requirement and mechanisms
|
China Unicom
|
Q9/15, Q10/15
|
2010-05-22 |
|
[ 828 ]
|
Proposal to Add Protection with Dual-homing Sink Nodes in G.ptneq
|
China United Network Communications Group Company
|
Q9/15
|
2010-05-17 |
|
[ 827 ]
|
Protection switching in G.ptneq
|
China Unicom,China Mobile, China <Academy> of Tele
|
Q9/15
|
2010-05-17 |
|
[ 826 ]
|
Discussion on MPLS-TP OAM mechanisms
|
China Telecom
|
Q10/15
|
2010-05-17 |
|
[ 825 ]
|
Requirement for multi stages multiplex/demultiplex configuration
|
China Telecom
,
China Mobile
,
China Unicom
,
ZTE
|
Q9/15, Q14/15, Q12/15
|
2010-05-17 |
|
[ 824 ]
|
Vectoring-friendly VTU-R
|
Alcatel-Lucent
,
Belgacom
,
Swisscom
|
Q4/15
|
2010-05-17 |
|
[ 823 ]
|
Propose to add an appendix to describe EVPRM solution to G.8011.4
|
Alcatel Lucent Shanghai Bell
,
CATR
,
Ministry of Information Industry of P.R. of China
|
Q10/15
|
2010-05-17 |
|
[ 822 ]
|
Proposals about MPLS-TP OAM mechanisms
|
China Mobile
|
Q10/15
|
2010-05-17 |
|
[ 821 ]
|
Modulation Schemes For G.hnem
|
Texas Instruments
|
Q4/15
|
2010-05-16 |
|
[ 820 ]
|
Interleaver design for ITU-T G.hnem
|
Texas Instruments
|
Q4/15
|
2010-05-16 |
|
[ 819 ]
|
G.hnem header contents and format
|
Texas Instruments
|
Q4/15
|
2010-05-16 |
|
[ 818 ]
|
OFDM Numerology For G.hnem
|
Texas Instruments
|
Q4/15
|
2010-05-16 |
|
[ 817 ]
|
Comments on Transitional Link Study Points
|
Huawei
|
Q12/15
|
2010-05-16 |
|
[ 816 ]
|
Delivered Throughput Measurement using LMM/LMR
|
Huawei
|
Q10/15
|
2010-05-16 |
Results:2390 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):