Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 915 ]
|
Comments on the proposed revisions for G.650.1
|
NTT
,
CLPAJ
|
Q5/15
|
2010-05-18 |
|
[ 914 ]
|
A shared mesh protection switching mechanism
|
ETRI
|
Q9/15
|
2010-05-18 |
|
[ 913 ]
|
A proposal of a shared mesh protection architecture in G.gsmp
|
ETRI
|
Q9/15
|
2010-05-18 |
|
[ 912 ]
|
Comments on the G.808.1
|
ETRI
|
Q9/15
|
2010-05-18 |
|
[ 911 ]
|
Addition of examples of APS protocol operation on multiple failures in the next version of G.808.1
|
ETRI
|
Q9/15
|
2010-05-18 |
|
[ 910 ]
|
Support for G.sdapp
|
KT
,
ETRI
|
Q6/15
|
2010-05-18 |
|
[ 909 ]
(Rev.1) |
Seed signal power in seeded DWDM applications
|
ETRI
|
Q6/15
|
2010-05-18 |
|
[ 908 ]
|
Proposed Frequency Grid Specification for G.sdapp
|
LG-Nortel
|
Q6/15
|
2010-05-18 |
|
[ 907 ]
|
Proposed Seed Source Power Spectral Density Specification for G.sdapp
|
LG-Nortel
|
Q6/15
|
2010-05-18 |
|
[ 906 ]
|
Proposed Baseline Text for G.sdapp
|
LG-Nortel
|
Q6/15
|
2010-05-18 |
|
[ 905 ]
|
Telecom Slave - State Machine Operations
|
Huawei
|
Q13/15
|
2010-05-18 |
|
[ 904 ]
|
G.827x Recommendations - High-Level Objectives
|
Huawei
,
CATR
,
MII
|
Q13/15
|
2010-05-18 |
|
[ 903 ]
|
Pulse-Per-Second Interface
|
Huawei
,
CATR
,
China Mobile Communications Corporation
,
MII
|
Q13/15
|
2010-05-18 |
|
[ 902 ]
|
PTP Profile Data Set Members
|
Huawei
|
Q13/15
|
2010-05-18 |
|
[ 901 ]
|
G.8264 ESMC Processing for G.8011.x Ethernet Services Types
|
Huawei
|
Q13/15, Q10/15
|
2010-05-18 |
|
[ 900 ]
|
Comments and Editorial Remarks for G.8265.1
|
Huawei
|
Q13/15, Q10/15
|
2010-05-18 |
|
[ 899 ]
|
Updated Telecom Slave Model
|
Huawei
,
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 898 ]
|
Flag Fields
|
Huawei
|
Q13/15
|
2010-05-18 |
|
[ 897 ]
|
Test Results of IEEE1588v2 hop-by-hop time synchronization using Boundary Clocks
|
Huawei
,
China Mobile Communications Corporation
|
Q13/15
|
2010-05-18 |
|
[ 896 ]
|
The use of SyncE and IEEE1588v2 for Time Distribution
|
Huawei
,
China Mobile Communications Corporation
|
Q13/15
|
2010-05-18 |
|
[ 895 ]
|
ESMC Transport over GPON
|
Huawei
,
BT
|
Q2/15, Q13/15
|
2010-05-18 |
|
[ 894 ]
|
G.8264 Amendment: editorial comments regarding the use of physical methods to deliver timing in a multi-operator context
|
Huawei
,
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 893 ]
|
Usage of PTP domain number for the time-profile
|
Huawei
|
Q13/15
|
2010-05-18 |
|
[ 892 ]
|
Proposed text modifications to the delay measurement process in G.8021
|
NEC Corporation
|
Q9/15
|
2010-05-18 |
|
[ 891 ]
|
Proposed text for ETH group functions in G.8021
|
NEC Corporation
|
Q9/15
|
2010-05-18 |
|
[ 890 ]
|
Consideration of the proactive FD/FDV measurements in G.8021/Y.1731
|
NEC Corporation
|
Q9/15, Q14/15, Q10/15
|
2010-05-18 |
|
[ 889 ]
|
Consideration of the enhancement of performance monitoring in G.8021/Y.1731
|
NEC Corporation
|
Q9/15, Q14/15, Q10/15
|
2010-05-18 |
|
[ 888 ]
|
Proposal for OMCI transport in Ethernet PON
|
Mitsubishi
,
Ericsson
,
HItachi
,
NTT
|
Q2/15
|
2010-05-18 |
|
[ 887 ]
|
Black-hole problem due to address mis-learning in G.8032
|
Korea (Republic of)
|
Q9/15
|
2010-05-18 |
|
[ 886 ]
|
Proposal to modify failure of protocol conditions in G.8031 and G.873.1
|
Korea (Republic of)
|
Q9/15
|
2010-05-18 |
|
[ 885 ]
|
MS-W (Manual Switch to Working) in revertive operation in G.8031
|
Korea (Republic of)
|
Q9/15
|
2010-05-18 |
|
[ 884 ]
|
Proposal to comprehensively classify modulation/demodulation and multiplex/demultiplex schemes used in optical transmission systems
|
NTT
|
Q6/15
|
2010-05-18 |
|
[ 883 ]
|
Applications of G.9960, G.9961 Transceivers for Smart Grid applications: Advanced Metering infrastructure, Energy Management in the home, and Electric Vehicles
|
Lantiq Beteiligungs
,
DS2
|
Q4/15
|
2010-05-18 |
|
[ 882 ]
|
Consideration of jitter performance measurement method for XG-PON optical interfaces
|
CIAJ
|
Q2/15, Q15/15
|
2010-05-18 |
|
[ 881 ]
|
Proposal for definition of COTDR
|
CIAJ
|
Q8/15, Q15/15
|
2010-05-18 |
|
[ 880 ]
|
Proposal for correction of table1 parameters in O.174
|
CIAJ
|
Q15/15
|
2010-05-18 |
|
[ 879 ]
|
Proposal for addition of jitter test parameters and text in O.174
|
CIAJ
|
Q15/15
|
2010-05-18 |
|
[ 878 ]
|
Proposal for Title, Summary and Scope of O.xgponjitter
|
CIAJ
|
Q2/15, Q15/15
|
2010-05-18 |
|
[ 877 ]
|
Comments on the protocol specifications in Y.1731
|
NEC Corporation
|
Q10/15
|
2010-05-18 |
|
[ 876 ]
|
Issues with the Transparent Clock concept of PTPv2 in a telecom environment
|
France Télécom
|
Q4/15, Q2/15, Q13/15
|
2010-05-18 |
|
[ 875 ]
|
Architecture for phase and time distribution
|
France Télécom
|
Q4/15, Q2/15, Q13/15
|
2010-05-18 |
|
[ 874 ]
|
G.hn: 802.1Qat support in G.hn
|
Intel Corp.
|
Q4/15
|
2010-05-18 |
|
[ 873 ]
|
G.8260: discussion on packet pre-selection criteria and comments on cluster and FWPR PDV metrics
|
France Télécomq
|
Q13/15
|
2010-05-18 |
|
[ 872 ]
|
G.8260: technical comments regarding WD115 (PDV metrics) from San Jose interim meeting
|
France Télécom
,
Tellabs
|
Q13/15
|
2010-05-18 |
|
[ 871 ]
|
G.8260: definition of floor delay, delay steps, and comments on Appendix I
|
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 870 ]
|
G.8260: list of requirements for PDV metrics
|
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 869 ]
|
G.cx: A concern regarding operation with non-standardized systems
|
CopperGate Communications
|
Q4/15
|
2010-05-18 |
|
[ 868 ]
|
G.hn: IPR Statement of CopperGate Communications
|
CopperGate Communications
|
Q4/15
|
2010-05-18 |
|
[ 867 ]
|
G3 Low Frequency Narrow Band OFDM PLC Proposal
|
Maxim Integrated Products, Inc.
|
Q4/15
|
2010-05-18 |
|
[ 866 ]
|
Rogue ONU draft supplement
|
Verizon
|
Q2/15
|
2010-05-18 |
Results:2390 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):