International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1040 ]  
 
Field test of 1588v2 time sync based on physical layer frequency sync support     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1039 ]  
 
Definition related to time/phase sync in G.8260     ZTE , CMCC   Q13/15   2010-05-20
[ 1038 ]  
 
Performance analysis of 1588v2 time/sync in field test     ZTE , CMCC   Q13/15   2010-05-20
[ 1037 ]  
 
1588v2 test results with different clock mode and field network     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1036 ]  
(Rev.1) 
Consideration on Phase/Time synchronization over OTN     ZTE   Q13/15, Q11/15   2010-05-20
[ 1035 ]  
 
Proposal of Misconnection in Ring Protection     ZTE   Q9/15   2010-05-20
[ 1034 ]  
 
Consideration on LO ODUk Ring Protection     ZTE   Q9/15   2010-05-20
[ 1033 ]  
 
Comments on draft of G.ptneq generics     ZTE   Q9/15   2010-05-20
[ 1032 ]  
 
DNF at NR messages (G.8032)     ZTE   Q9/15   2010-05-20
[ 1031 ]  
 
SD scenarios (G.8031)     ZTE   Q9/15   2010-05-20
[ 1030 ]  
 
SD detection in G.8031     ZTE   Q9/15   2010-05-20
[ 1029 ]  
 
Rough estimation of system non-linear effects using non-linear phase in G.SUP 39     ZTE   Q6/15   2010-05-20
[ 1028 ]  
 
Filter phase ripple discussion for G.680     ZTE   Q6/15   2010-05-20
[ 1027 ]  
 
IPv6 Multicast filter     ZTE   Q2/15   2010-05-20
[ 1026 ]  
 
Proposal for Combo Reach Extender (CRE) device for G.987.re     ZTE   Q2/15   2010-05-20
[ 1025 ]  
 
Clarification on ODU Multiplexing     AT&T   Q13/15, Q12/15   2010-05-20
[ 1024 ]  
 
Construction of special optical fibre cables for extreme applications in sewer environment     Telecom Italia   Q16/15   2010-05-20
[ 1023 ]  
 
Transitional Link Study Points     Tellabs   Q12/15   2010-05-20
[ 1022 ]  
 
Model for the All Optical Network     Tellabs   Q12/15   2010-05-20
[ 1021 ]  
 
G.hnem: Coexistence of G.hnem with legacy narrow-band services     Lantiq   Q4/15   2010-05-20
[ 1020 ]  
 
G.hnem: Proposal to define runtime BATs in G.hnem     Lantiq   Q4/15   2010-05-20
[ 1019 ]  
 
G.8251: OTN timing aspects     France Télécom   Q13/15, Q11/15   2010-05-20
[ 1018 ]  
 
G.hnem: Proposal to address utility access network in G.hnem     Lantiq   Q4/15   2010-05-20
[ 1017 ]  
 
Network PDV accumulation study     France Télécom   Q13/15   2010-05-20
[ 1016 ]  
 
G.hnem: Proposal to use PHY-layer addressing in G.hnem     Lantiq   Q4/15   2010-05-20
[ 1015 ]  
 
G.cx: Proposal for additional changes before approval     Lantiq   Q4/15   2010-05-20
[ 1014 ]  
 
G.hnem: Proposal for G.hnem constellation mappings     Lantiq   Q4/15   2010-05-20
[ 1013 ]  
 
G.hnem: Advantage of coherent mappings for G.hnem     Lantiq   Q4/15   2010-05-20
[ 1012 ]  
 
Living List for XG-PON Transmission Convergence layer specification     Huawei , Mitsubishi , Motorola   Q2/15   2010-05-20
[ 1011 ]  
 
Proposed changes to add MMM     DS2   Q4/15   2010-05-20
[ 1010 ]  
 
Multi-Medium Mode: Default operational mode for G.9960 when in a multi-medium domain     DS2   Q4/15   2010-05-20
[ 1009 ]  
 
AMI application support Appendix for G.9960 and G.9961     DS2   Q4/15   2010-05-20
[ 1008 ]  
 
Concatenated Code For ITU-T G.hnem     Yitran   Q4/15   2010-05-20
[ 1007 ]  
 
G.hnem APC for Interfacing to IPv6     Yitran   Q4/15   2010-05-20
[ 1006 ]  
 
G.hnem Addressing Scheme     Yitran   Q4/15   2010-05-20
[ 1005 ]  
 
G.hnem Relaying Functionality     Yitran   Q4/15   2010-05-20
[ 1004 ]  
 
G.hnem Segmentation and Reassembly Mechanism     Yitran   Q4/15   2010-05-20
[ 1003 ]  
 
G.hnem LCC Frame Format     Yitran   Q4/15   2010-05-20
[ 1002 ]  
 
G.hnem Coherent Modulation Considerations     Yitran   Q4/15   2010-05-20
[ 1001 ]  
 
Equivalence of the IEEE 1588 Boundary Clock and Peer-to-Peer Transparent Clock for Synchronization Transport     Huawei   Q13/15   2010-05-20
[ 1000 ]  
 
Scale factors for ADSL2+ Virtual Noise     BT   Q4/15   2010-05-20
[ 999 ]  
 
Functional Model of Hitless Adjustment of ODUflex     Huawei   Q9/15   2010-05-20
[ 998 ]  
 
G.inp: On Retransmission REIN overhead formula     Lantiq   Q4/15   2010-05-20
[ 997 ]  
 
G.inp: Further comments on SRA Proposals for G.998.4     Lantiq   Q4/15   2010-05-20
[ 996 ]  
 
Comments and way forward for distribution of ToD over VDSL2 links     Lantiq   Q4/15   2010-05-20
[ 995 ]  
 
Treatment of delay jumps in relation with MAFE/MATIE     Nokia Siemens Networks   Q13/15   2010-05-20
[ 994 ]  
 
Packet metrics applied to two-way delay patterns     Nokia Siemens Networks   Q13/15   2010-05-20
[ 993 ]  
 
Analysis of the floor delay window method     Nokia Siemens Networks   Q13/15   2010-05-20
[ 992 ]  
 
Applicability of MATIE as a phase stability metric     Nokia Siemens Networks   Q13/15   2010-05-20
[ 991 ]  
 
Document withdrawn     Ericsson   Q6/15   2010-05-20
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2021-01-29