Contributions
[ AI/Question: Q9/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2149 ]
|
Comments on ODU SMP
|
Fujitsu Limited
|
Q9/15
|
2012-08-27 |
|
[ 2148 ]
|
Proposal of the architectures for MPLS-TP linear protection
|
Fujitsu Limited
|
Q9/15
|
2012-08-27 |
|
[ 2147 ]
|
Comments on G.8021.1
|
Fujitsu Limited
|
Q9/15
|
2012-08-27 |
|
[ 2145 ]
|
Proposal for updated Table 7-1 in G.806
|
Fujitsu Limited
|
Q9/15
|
2012-08-27 |
|
[ 2144 ]
|
Proposed text for the guidance to performance measurement by ETH OAM
|
Fujitsu Limited
,
NEC Corporation
|
Q9/15, Q14/15, Q10/15
|
2012-08-27 |
|
[ 2133 ]
|
Correction of OAM "ETH-CSF"
Withdrawn: Incorrect document uploaded.
|
FiberHome Technologies Group
|
Q9/15
|
2012-08-27 |
|
[ 2132 ]
|
gsmp permanent 1 to 1 smp
|
FiberHome Technologies Group
|
Q9/15
|
2012-08-27 |
|
[ 2131 ]
(Rev.1-2) |
example of state machine for SMP
|
China Unicom
,
FiberHome Technologies Group
,
ZTE Corporation
|
Q9/15
|
2012-08-27 |
|
[ 2115 ]
|
Consideration of the CSF function on G.8021
|
NEC Corporation
|
Q9/15
|
2012-08-27 |
|
[ 2114 ]
|
Clarification of APS protocol type on G.smp m:1 architecture
|
NEC Corporation
|
Q9/15
|
2012-08-27 |
|
[ 2113 ]
|
Proposed text for the network connectivity in G.Supplement for G.8032
|
NEC Corporation
|
Q9/15
|
2012-08-27 |
|
[ 2107 ]
|
OAM configuration examples for G.supplement for G.8032
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15
|
2012-08-27 |
|
[ 2099 ]
(Rev.1-2) |
Analysis and comparison on PTN ring protection proposals
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15
|
2012-08-26 |
|
[ 2098 ]
(Rev.1-3) |
MPLS-TP Shared-Ring protection (MSRP) mechanism for ring topology
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15
|
2012-08-26 |
|
[ 2097 ]
(Rev.1-2) |
PTN requirements on Ring protection
Revision 2 of this Contribution is incorrectly titled; the correct title is: PTN requirements on Ring protection
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15
|
2012-08-26 |
|
[ 2096 ]
(Rev.1-2) |
Promoting progress of G.8131.1 MPLS-TP APS Linear Protection
|
China Mobile Communications Corporation; China
|
Q9/15
|
2012-08-26 |
|
[ 2087 ]
|
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
PMC-Sierra, Inc.
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-25 |
|
[ 2072 ]
|
Update to G.8021 for retrieval of on-demand intermediate measurements
|
Alcatel-Lucent Italia S.p.A.
,
Alcatel-Lucent USA Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2070 ]
|
G.smp Objectives
|
Alcatel-Lucent USA Inc.
,
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2065 ]
|
Proposed Input for G.smp Summary Clause re Capacity Efficiency
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2061 ]
(Rev.1-2) |
Proposed Input for G.smp Summary Clause re Mesh Topology Definition
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2058 ]
|
Misalignment among G.709, G.798 and G.872
|
Ciena Corporation
|
Q9/15, Q12/15, Q11/15
|
2012-08-24 |
|
[ 2056 ]
|
Generic considerations for protection resource assignments in G.smp
|
Alcatel-Lucent USA Inc.
,
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2055 ]
|
Distributed G.8031 proposal
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2054 ]
|
Requirements of Control Plane/Management Plane to support SMP
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2052 ]
|
Protection Interworking editorial comments
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2051 ]
|
Bi-directional SMP Operation and Signalling Flow Sequence
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2049 ]
|
Comments and clarifications on G.smp
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2048 ]
|
G.odusmp Support of Both ODUj and ODUk Restoration
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2047 ]
|
Use of CL-SNCG/S to simplify G.873.2 configurations
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2046 ]
|
Not used
Withdrawn by submitter
|
N/A
|
Q9/15
|
2012-08-24 |
|
[ 2045 ]
|
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
AT&T, Inc.
,
Ciena Corporation
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-24 |
|
[ 2044 ]
|
G.odusmp with TCM APS
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2041 ]
|
G.smp multiple failure protection pre-emption
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2037 ]
|
ODU SMP APS protocol considerations
|
Tellabs Oy
|
Q9/15
|
2012-08-24 |
|
[ 2036 ]
|
Protection Interworking - Linear Protection Generic Models
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2035 ]
|
Alignment of APS specifications in G.873.1, G.798, and G.709
|
Tellabs Oy
|
Q9/15, Q11/15
|
2012-08-24 |
|
[ 2034 ]
|
Proposed appendix to G.798.1 concerning SNC implementation considerations
|
Tellabs Oy
|
Q9/15
|
2012-08-24 |
|
[ 2030 ]
|
Update to the AIS Insert process in G.8121.2
|
Cisco Systems, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2029 ]
|
Update to the AIS Insert process in G.8121
|
Cisco Systems, Inc.
|
Q9/15, Q14/15
|
2012-08-24 |
|
[ 2028 ]
|
Proposed Text for adding Lock Instruct functions to G.8121.2
|
Cisco Systems, Inc.
|
Q9/15, Q14/15
|
2012-08-24 |
|
[ 2027 ]
|
Proposed Text for adding Lock Instruct functions to G.8121
|
Cisco Systems, Inc.
|
Q9/15, Q14/15
|
2012-08-24 |
|
[ 2026 ]
|
Proposed text for G.8121 Appendix describing PHB flows
|
Cisco Systems, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2025 ]
|
Updates to G.8121.2 for alignment with G.8121
|
Cisco Systems, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2023 ]
|
Terminology for Performance Monitoring in G.8013/Y.1731
|
Cisco Systems, Inc.
|
Q9/15, Q14/15, Q10/15
|
2012-08-24 |
|
[ 2021 ]
|
Proposal for Updating External Commands
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-24 |
|
[ 2020 ]
|
ODU SMP Protocol
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-24 |
|
[ 2019 ]
|
ODU SMP Application Analysis
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-24 |
|
[ 2018 ]
|
Editorial Suggestions for G.smp
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-24 |
|
[ 2017 ]
|
Discussion and Update for ODU SMP Node Functional Model
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-24 |
Results:125 total items. Result page:
Previous -
1 -
2 -
3
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):