Contributions
[ AI/Question: Q9/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2251 ]
(Rev.1) |
Propose to promoting the progress of MPLS-TP linear protection
|
Ministry of Industry and Information Technology (MIIT)
|
Q9/15
|
2012-08-28 |
|
[ 2245 ]
|
DVB_ASI Jitter Accumulation over OTN Islands
|
Huawei Technologies Co. Ltd.
,
Huawei Technologies Co. Ltd.
|
Q9/15, Q13/15
|
2012-08-28 |
|
[ 2232 ]
|
Consideration of G.mecp protection architecture
|
Hitachi, Ltd.
|
Q9/15
|
2012-08-28 |
|
[ 2231 ]
|
Proposal on the structure of G.8060 (G.ptneq)
|
Hitachi, Ltd.
|
Q9/15
|
2012-08-28 |
|
[ 2230 ]
|
Proposal for equipment type definition in G.8060 (G.ptneq)
|
Hitachi, Ltd.
|
Q9/15
|
2012-08-28 |
|
[ 2225 ]
|
Proposed text for ODU SMP Protocol
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2224 ]
|
Proposed text of Commands for G.odusmp
|
China Unicom
,
FiberHome Technologies Group
,
ZTE Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2222 ]
|
Editorial proposal for G.smp
|
China Unicom
,
FiberHome Technologies Group
,
ZTE Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2220 ]
|
Example scenarios for protection interworking
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2219 ]
|
Proposal of bi-directional failure in G.873.1
|
FiberHome Technologies Group
,
ZTE Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2214 ]
|
Comparison of ODU SMP Activation protocols
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2213 ]
|
G.ODUSMP Protocol Proposal
|
Infinera Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2196 ]
|
Proposal for adaptive bandwidth in Ethernet ring
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-27 |
|
[ 2193 ]
|
Clarification on adaptive bandwidth for G.808.1
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-27 |
|
[ 2192 ]
|
Proposal on protection switching interworking architecture for ring-to-ring and linear-to-ring schemes
|
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-27 |
|
[ 2191 ]
|
Proposal for new Appendix II to G.798.1
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-27 |
|
[ 2190 ]
|
Definition of Signal Degrade in packet networks
|
Alcatel-Lucent Italia S.p.A.; China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orckit Corrigent
,
Telecom Italia S.p.A.
,
ZTE Corporation
|
Q9/15, Q14/15, Q10/15
|
2012-08-27 |
|
[ 2177 ]
|
Extension of OTN hybrid equipment
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-27 |
|
[ 2166 ]
|
Requirements for Signal Degrade in packet networks
|
Alcatel-Lucent Italia S.p.A.; China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orckit Corrigent
,
Telecom Italia S.p.A.
,
ZTE Corporation
|
Q9/15, Q10/15
|
2012-08-27 |
|
[ 2158 ]
(Rev.1) |
To accelerate research on M-OTN equipment type in G798.1
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
|
Q9/15
|
2012-08-27 |
|
[ 2156 ]
|
The clrification about multipoint to point transport network services in G798.1
|
China Unicom
,
FiberHome Technologies Group
|
Q9/15
|
2012-08-27 |
|
[ 2154 ]
|
The Clarification of EOTN in G798.1,G8012.1 and G 8021.1
|
China Unicom
,
FiberHome Technologies Group
|
Q9/15
|
2012-08-27 |
|
[ 2152 ]
|
Proposed terminologies for ETH PM
|
Fujitsu Limited
|
Q9/15, Q14/15, Q10/15
|
2012-08-27 |
|
[ 2151 ]
|
Consideration on aSSF input for AIS insertion in G.8121
|
Fujitsu Limited
|
Q9/15
|
2012-08-27 |
|
[ 2150 ]
|
Proposed update to G.8121 Appendix I
|
Fujitsu Limited
|
Q9/15
|
2012-08-27 |
|
[ 2149 ]
|
Comments on ODU SMP
|
Fujitsu Limited
|
Q9/15
|
2012-08-27 |
|
[ 2148 ]
|
Proposal of the architectures for MPLS-TP linear protection
|
Fujitsu Limited
|
Q9/15
|
2012-08-27 |
|
[ 2147 ]
|
Comments on G.8021.1
|
Fujitsu Limited
|
Q9/15
|
2012-08-27 |
|
[ 2145 ]
|
Proposal for updated Table 7-1 in G.806
|
Fujitsu Limited
|
Q9/15
|
2012-08-27 |
|
[ 2144 ]
|
Proposed text for the guidance to performance measurement by ETH OAM
|
Fujitsu Limited
,
NEC Corporation
|
Q9/15, Q14/15, Q10/15
|
2012-08-27 |
|
[ 2133 ]
|
Correction of OAM "ETH-CSF"
Withdrawn: Incorrect document uploaded.
|
FiberHome Technologies Group
|
Q9/15
|
2012-08-27 |
|
[ 2132 ]
|
gsmp permanent 1 to 1 smp
|
FiberHome Technologies Group
|
Q9/15
|
2012-08-27 |
|
[ 2131 ]
(Rev.1-2) |
example of state machine for SMP
|
China Unicom
,
FiberHome Technologies Group
,
ZTE Corporation
|
Q9/15
|
2012-08-27 |
|
[ 2115 ]
|
Consideration of the CSF function on G.8021
|
NEC Corporation
|
Q9/15
|
2012-08-27 |
|
[ 2114 ]
|
Clarification of APS protocol type on G.smp m:1 architecture
|
NEC Corporation
|
Q9/15
|
2012-08-27 |
|
[ 2113 ]
|
Proposed text for the network connectivity in G.Supplement for G.8032
|
NEC Corporation
|
Q9/15
|
2012-08-27 |
|
[ 2107 ]
|
OAM configuration examples for G.supplement for G.8032
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15
|
2012-08-27 |
|
[ 2099 ]
(Rev.1-2) |
Analysis and comparison on PTN ring protection proposals
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15
|
2012-08-26 |
|
[ 2098 ]
(Rev.1-3) |
MPLS-TP Shared-Ring protection (MSRP) mechanism for ring topology
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15
|
2012-08-26 |
|
[ 2097 ]
(Rev.1-2) |
PTN requirements on Ring protection
Revision 2 of this Contribution is incorrectly titled; the correct title is: PTN requirements on Ring protection
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15
|
2012-08-26 |
|
[ 2096 ]
(Rev.1-2) |
Promoting progress of G.8131.1 MPLS-TP APS Linear Protection
|
China Mobile Communications Corporation; China
|
Q9/15
|
2012-08-26 |
|
[ 2087 ]
|
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
PMC-Sierra, Inc.
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-25 |
|
[ 2072 ]
|
Update to G.8021 for retrieval of on-demand intermediate measurements
|
Alcatel-Lucent Italia S.p.A.
,
Alcatel-Lucent USA Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2070 ]
|
G.smp Objectives
|
Alcatel-Lucent USA Inc.
,
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2065 ]
|
Proposed Input for G.smp Summary Clause re Capacity Efficiency
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2061 ]
(Rev.1-2) |
Proposed Input for G.smp Summary Clause re Mesh Topology Definition
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2058 ]
|
Misalignment among G.709, G.798 and G.872
|
Ciena Corporation
|
Q9/15, Q12/15, Q11/15
|
2012-08-24 |
|
[ 2056 ]
|
Generic considerations for protection resource assignments in G.smp
|
Alcatel-Lucent USA Inc.
,
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2055 ]
|
Distributed G.8031 proposal
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2012-08-24 |
|
[ 2054 ]
|
Requirements of Control Plane/Management Plane to support SMP
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
Results:125 total items. Result page:
-
1 -
2 -
3
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):