International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2012-09-10 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2012-09-10) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2012-09-10 to 2012-09-21

held in Switzerland [Geneva]

Other Meetings : 2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:92 total items.
Result page:  Previous -  1 - 2  -  Next
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2003 ]  
(Rev.1) 
Multicast address in the G.8275.1 profile     Telefon AB - LM Ericsson   Q13/15   2012-08-23
[ 2002 ]  
(Rev.1) 
Considerations on the constant asymmetry in the G.8271.1 network reference model     Telefon AB - LM Ericsson   Q13/15   2012-08-23
[ 1994 ]  
(Rev.1) 
EEC with enhanced Holdover     Telefon AB - LM Ericsson   Q13/15   2012-08-23
[ 1987 ]  
 
G.8272 latest draft editorial comments     Integrated Device Technology (IDT)   Q13/15   2012-08-22
[ 1986 ]  
 
G.8272 Summary     Integrated Device Technology (IDT)   Q13/15   2012-08-22
[ 1985 ]  
 
Time Error Budget to Allocate to Error Inside BC [G.8271 / G.8273.2]     Microsemi Semiconductor Corporation   Q13/15   2012-08-22
[ 1984 ]  
 
Thoughts on Options for Syntonization of T-BC without SyncE / T-BC Models     Microsemi Semiconductor Corporation   Q13/15   2012-08-22
[ 1983 ]  
 
Move Metrics from G.8261 to G.8260     Microsemi Semiconductor Corporation   Q13/15   2012-08-22
[ 1982 ]  
 
Holdover Requirement [G.8263]     Microsemi Semiconductor Corporation   Q13/15   2012-08-22
[ 1981 ]  
 
Temperature Profile Appendix [G.8263]     Microsemi Semiconductor Corporation   Q13/15   2012-08-22
[ 1976 ]  
 
Example of changes to G.8021 to support enhanced holdover     Ciena Canada   Q13/15   2012-08-22
[ 1975 ]  
 
Further considerations on PRTC modelling     Ciena Canada   Q13/15   2012-08-22
[ 1973 ]  
 
Use of G.805 to model PRTC and BC clocks     Ciena Canada   Q13/15   2012-08-22
[ 1958 ]  
(Rev.1) 
G.8273.2: Discussion on text for Sections 6 through 9.     Calnex Solutions Limited   Q13/15   2012-08-15
[ 1948 ]  
(Rev.1) 
G.8273.3: Noise Error Definition for T-TC to control impact of traffic.     Calnex Solutions Limited , China Unicom   Q13/15   2012-08-08
[ 1947 ]  
(Rev.1) 
G.8273.2: T-BC Noise Error Definition to control impact of traffic.     Calnex Solutions Limited , China Unicom   Q13/15   2012-08-08
[ 1946 ]  
(Rev.1) 
G.8273.2: Phase Transient interface applicability.     Calnex Solutions Limited   Q13/15   2012-08-08
Results:92 total items.
Result page:  Previous -  1 - 2  -  Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-9-19