Contributions
[ AI/Question: Q13/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2240 ]
|
Analysis of Protection Scenario 1 for Phase/Time Synchronization, for the Case of a Shorter SyncE Reference Chain
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2239 ]
|
Further Discussion of BMCA Requirements for the Phase/Time PTP Telecom Profile, and Example Alternate BMCAs
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2238 ]
|
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths, with SyncE Transients Slowed Down by T-BCs and T-TSC, and Conclusions on Mitigation of Effect of the Rearrangement
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2237 ]
|
Analysis of HRM2b SyncE Rearrangement with SyncE Transients Slowed Down by T-BCs
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2235 ]
|
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix
|
Q13/15
|
2012-08-28 |
|
[ 2212 ]
|
Transparent Clocks and Issues Around Perceived Layer Violations [G.8275.1]
|
Aviat Networks
,
Calnex Solutions Limited
,
Juniper Networks
,
Sprint
,
Vitesse Semiconductor Corporation
|
Q13/15
|
2012-08-28 |
|
[ 2195 ]
|
Variable temperature test regime
|
Rakon Limited
|
Q13/15
|
2012-08-27 |
|
[ 2194 ]
|
G.8263 Clarification
|
Rakon Limited
|
Q13/15
|
2012-08-27 |
|
[ 2172 ]
|
Time sync architecture based on multiple PTP domains
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2171 ]
|
Hold-off time and interactions between frequency and phase-time planes
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2170 ]
|
A possible solution for multiple GMs and operator intervention
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2169 ]
|
Sync OAM architecture and requirements
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2168 ]
|
Further analysis about BMCA of time profile
|
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2167 ]
|
The mapping between ToD and PTP
|
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2155 ]
|
Analysis of interactive mechanism between two layers
|
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2143 ]
|
G.8273: Test methodology annex/appendix
|
Calnex Solutions Limited
,
Deutsche Telekom AG
|
Q13/15
|
2012-08-27 |
|
[ 2106 ]
|
Architecture Considerations for Time Distribution
|
ADVA Optical Networking
|
Q13/15
|
2012-08-26 |
|
[ 2105 ]
|
G.8261.1 Network limits
|
ADVA Optical Networking
|
Q13/15
|
2012-08-26 |
|
[ 2104 ]
|
PTP Network Probe and PTP Clock Probe
|
ADVA Optical Networking
|
Q13/15
|
2012-08-26 |
|
[ 2103 ]
|
Exact PTP clockclass values in application
|
China Mobile Communications Corporation
|
Q13/15
|
2012-08-26 |
|
[ 2102 ]
|
Proposal on PTP multicast MAC address in 8275.1
|
China Mobile Communications Corporation
|
Q13/15
|
2012-08-26 |
|
[ 2101 ]
|
Test and analysis of time synchronization using 1588v2 in 100G OTN long haul transport network
|
China Mobile Communications Corporation
|
Q13/15
|
2012-08-26 |
|
[ 2100 ]
|
Coordinate mechanism for SyncE and PTP
|
China Mobile Communications Corporation
|
Q13/15
|
2012-08-26 |
|
[ 2095 ]
|
PRTC Timing Signal Variation for a Particular Design
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-25 |
|
[ 2087 ]
|
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
PMC-Sierra, Inc.
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-25 |
|
[ 2084 ]
|
Testing Packet Clocks (re. G.8263) - Part 2
|
Anue Systems
|
Q13/15
|
2012-08-25 |
|
[ 2083 ]
|
Normal operation of telecom-grade network elements for supporting packet-based timing
|
Anue Systems
|
Q13/15
|
2012-08-25 |
|
[ 2082 ]
|
Packet Timing Monitor - Definition
|
Anue Systems
|
Q13/15
|
2012-08-25 |
|
[ 2081 ]
|
Annex for G.8273 discussing performance parameters for PTP clocks
|
Anue Systems
|
Q13/15
|
2012-08-25 |
|
[ 2080 ]
|
Organization of T-BC performance requirements
|
Anue Systems
|
Q13/15
|
2012-08-25 |
|
[ 2079 ]
|
Time Error of PTP master ports
|
Anue Systems
|
Q13/15
|
2012-08-24 |
|
[ 2078 ]
|
Time error accumulation in chains of phase/time clocks
|
Anue Systems
|
Q13/15
|
2012-08-24 |
|
[ 2077 ]
|
Estimating constant time error and related measurement methods for phase/time clocks
|
Anue Systems
|
Q13/15
|
2012-08-24 |
|
[ 2075 ]
|
G.8260: Definition of Partial On-path Support
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2074 ]
|
Starting point for the development of a new PTP profile for time and phase distribution over existing deployed networks
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2073 ]
|
G.8272: Phase/Time Holdover Capability for a PRTC
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2069 ]
|
G.8272: Performance conditions for the PRTC
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2068 ]
|
G.8265.1: Value of the PTP "Renewal Invited" flag
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2067 ]
|
G.8265.1: Value of the PTP clockAccuracy Field
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2063 ]
(Rev.1) |
G.8263: PDV Noise Tolerance Testing for the PEC-S-F
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2060 ]
|
G.8263: PDV Distribution for Noise Tolerance of Packet Slave Clocks
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2053 ]
(Rev.1) |
Development of a new PTP Profile for Time/Phase Distribution
|
AT&T, Inc.
,
Sprint
,
SymmetriCom, Inc.
,
Verizon Communication Corporation
|
Q13/15
|
2012-08-24 |
|
[ 2045 ]
|
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
AT&T, Inc.
,
Ciena Corporation
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-24 |
|
[ 2043 ]
|
Alternative to legacy interfaces for connecting PRTC to T-GM
|
Cisco Systems, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2042 ]
|
G.8272: PRTC Support of SyncE and ESMC
|
Cisco Systems, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2040 ]
|
Support of IPv6 for G.8265.1
|
Cisco Systems, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2039 ]
|
Two-step clock issue with multicast transmission
|
Cisco Systems, Inc.
|
Q13/15
|
2012-08-24 |
|
[ 2038 ]
|
Support of IP for G.8275.x
|
Cisco Systems, Inc.
,
Juniper Networks
|
Q13/15
|
2012-08-24 |
|
[ 2014 ]
(Rev.1) |
Considerations on Time Sync holdover and rearrangements
|
Telefon AB - LM Ericsson
|
Q13/15
|
2012-08-24 |
|
[ 2004 ]
(Rev.1) |
Considerations on Time sync Limits in G.8271.1
|
Calnex Solutions Limited
,
Telefon AB - LM Ericsson
|
Q13/15
|
2012-08-23 |
Results:92 total items. Result page:
-
1 -
2
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):