International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-12-05 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG15  TD-WP2 (2011-12-05) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-12-05 to 2011-12-16

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  [ 2011-12-05 ]  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:22 total items.
Temporary Documents  (WP2)  [ AI/Question: Q6/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 291-WP2 ]  
 
Report of Joint Q5, 16 and 18/15 meeting on the structure of WP2 (Geneva, December 2011)     Chairman WP2/15   Q8/15, Q7/15, Q6/15, Q5/15, Q18/15, Q17/15, Q16/15   2011-12-14
[ 290-WP2 ]  
 
Report of the Q6/15 meeting (Geneva, December 2011)     Rapporteur Q6/15   Q6/15   2011-12-14
[ 289-WP2 ]  
 
Liaison Statements from Q6/15 (Geneva, December 2011)     Rapporteur Q6/15   Q6/15   2011-12-14
[ 286-WP2 ]  
 
oLS: Reply to ETSI ATTM on Plastic optical fibre cabling for residential premises     Chairman WP2/15   Q7/15, Q6/15, Q5/15, Q18/15, Q16/15   2011-12-14
[ 265-WP2 ]  
(Rev.1) 
Correspondence on G.sdapp     Editor G.sdapp   Q6/15   2011-12-05
[ 263-WP2 ]  
 
Draft Revised Supplement ITU-T G.sup39 version 4.5     Editor G.sup39   Q6/15   2011-12-04
[ 262-WP2 ]  
(Rev.1) 
Correspondence on ITU-T G.sup39     Editor G.sup39   Q6/15   2011-12-04
[ 255-WP2 ]  
 
Base text for a new G.650.1 Appendix     Correspondence Leader on MPI, Editor G.650.1, Rapp   Q6/15, Q5/15   2011-11-29
[ 254-WP2 ]  
 
Correspondence Report on MPI Study Topic (G.650.1 Appendix)     Rapporteur Q5/15; Correspondence Leader on MPI   Q6/15, Q5/15   2011-11-29
[ 253-WP2 ]  
(Rev.1-4) 
WP2/15 draft agenda (Geneva, 5-16 December 2011)     Chairman WP2/15   Q8/15, Q7/15, Q6/15, Q5/15, Q18/15, Q17/15, Q16/15   2011-11-28
[ 251-WP2 ]  
(Rev.1) 
Proposed modifications to the text of Question 6/15 for the next study period     Rapporteur Q6/15, Associate Rapporteur Q6/15   Q6/15   2011-11-28
[ 249-WP2 ]  
(Rev.1) 
Draft agenda for the Q6/15 meeting, version 2     Rapporteur Q6/15   Q6/15   2011-11-25
[ 248-WP2 ]  
 
Recommendation ITU-T G.sdapp working draft     Editor G.sdapp   Q6/15   2011-11-25
[ 247-WP2 ]  
 
Proposed application parameters (version 1.4) for Recommendation ITU-T G.sdapp     Editor G.sdapp   Q6/15   2011-11-25
[ 246-WP2 ]  
 
Summary of correspondence on Recommendation ITU-T G.697     Editor G.697   Q6/15   2011-11-25
[ 245-WP2 ]  
 
Summary of correspondence on Recommendation ITU-T G.664     Editor G.664   Q6/15   2011-11-25
[ 244-WP2 ]  
 
Correspondence on Recommendation ITU-T G.680     Editor G.680   Q6/15   2011-11-24
[ 243-WP2 ]  
 
Draft revised Recommendation ITU-T G.680 Version 1.2     Editor G.680   Q6/15   2011-11-24
[ 242-WP2 ]  
 
Correspondence on G.959.1     Editor G.959.1   Q6/15   2011-11-24
[ 241-WP2 ]  
 
Correspondence on G.694.1     Editor G.694.1   Q6/15   2011-11-24
[ 239-WP2 ]  
 
Overview of contributions proposing parameters and related test methods for 40G modulation formats in G.698.2 Version 0.4     Editor G.698.2   Q6/15   2011-11-21
[ 234-WP2 ]  
 
iLS: Transfer of several L-series Recommendations from SG15 to SG5     ITU-T SG5   Q8/15, Q7/15, Q6/15, Q5/15, Q18/15, Q17/15, Q16/15   2011-05-10
Results:22 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-29