International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-12-05 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-12-05) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-12-05 to 2011-12-16

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:65 total items.
Result page:  1 - 2  - Next Next
Contributions  [ Source: Huawei Technologies Co. Ltd. ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1912 ]  
 
Maintaining the common OTN functional model in draft revised G.872     Huawei Technologies Co. Ltd. , China Mobile Communications Corporation , China Telecommunications Corporation   Q9/15, Q14/15, Q12/15, Q11/15   2011-11-22
[ 1908 ]  
 
Alignment of G.7044 and G.798     Huawei Technologies Co. Ltd.   Q9/15   2011-11-22
[ 1903 ]  
(Rev.1) +Add.1 
Differences between APS and PSC for MPLS-TP linear protection     Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co. Ltd.   Q9/15   2011-11-22
[ 1900 ]  
 
Proposal for maintaining Optical Duo Binary as modulation format for 40G applications in G.698.2     China , China Mobile Communications Corporation , China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1883 ]  
 
Y.1731 extension for Throughput Measurement     Huawei Technologies Co. Ltd.   Q9/15, Q10/15   2011-11-22
[ 1882 ]  
 
Model for Ethernet Remote Customer Service Interfaces     Huawei Technologies Co. Ltd.   Q12/15   2011-11-22
[ 1881 ]  
 
Transport Entity Role Examples     Huawei Technologies Co. Ltd.   Q12/15   2011-11-22
[ 1878 ]  
(Rev.1) 
Further Consideration of the Enhancement of LMM/LMR to support proactive LM     Huawei Technologies Co. Ltd.   Q9/15, Q10/15   2011-11-22
[ 1874 ]  
(Rev.1) 
G.vector: Initialization for Simultaneous Joining Lines     Huawei Technologies Co. Ltd.   Q4/15   2011-11-22
[ 1872 ]  
(Rev.1) 
G.fast: TDD Frame Structure and Timing Overhead     Huawei Technologies Co. Ltd.   Q4/15   2011-11-22
[ 1868 ]  
(Rev.1) 
G.fast: Point-to-Point Distribution is the Right Choice for G.fast     Huawei Technologies Co. Ltd.   Q4/15   2011-11-22
[ 1864 ]  
(Rev.1) 
G.fast: Equal-Length FEXT Measurements on PE05 Cable     Huawei Technologies Co. Ltd.   Q4/15   2011-11-22
[ 1862 ]  
(Rev.1) 
G.fast: Target Bit Error Rate of G.fast at Gamma Interface     Huawei Technologies Co. Ltd.   Q4/15   2011-11-22
[ 1849 ]  
 
Draft document of G.multi     Huawei Technologies Co. Ltd.   Q2/15   2011-11-22
[ 1848 ]  
(Rev.1) 
Proposed relationship of security related ME/attributes and OMCI MIB audit/sync increment     China , China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q2/15   2011-11-22
[ 1841 ]  
 
Proposal of RS422 1PPS time/phase as a time measurement interface     China , China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q13/15   2011-11-22
[ 1831 ]  
(Rev.1) 
Text proposal for clause 16 "Multiplexing/aggregation of Ethernet Connection signals" in new Recommendation G.8012.1     China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Q10/15   2011-11-22
[ 1830 ]  
(Rev.1) 
Updated requirement description and proposed text for adaptive bandwidth scenario in G.808.1     Huawei Technologies Co. Ltd.   Q9/15   2011-11-22
[ 1829 ]  
(Rev.1) 
Proposal to add ETH CL-SNCG/I protection to G.8031     Huawei Technologies Co. Ltd.   Q9/15   2011-11-22
[ 1828 ]  
(Rev.1) 
G.sdapp ongrid frequencies up&down on decision 2 of G.sdapp decision tree     Gemfire Europe Limited , Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1827 ]  
(Rev.1) 
Proposal for refining the OSNR calculation with the impact of channel-dependent variation     Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1826 ]  
(Rev.1) 
Proposal for ODB parameter values for 40G applications in G.698.2     Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1825 ]  
(Rev.1) 
Proposal for modifying wording on Flexible Grid in revised G.694.1     Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1824 ]  
(Rev.1) 
Proposal for modifying definition of OSNR in G.Sup39     Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1823 ]  
(Rev.1) 
Proposal for eye mask related criteria for DQPSK time domain skew detection in G.698.2     Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1819 ]  
(Rev.1) 
G.sdapp offgrid frequencies proposal on decision 3 of G.sdapp decision tree     Alphion Corporation , Gemfire Europe Limited , Huawei Technologies Co. Ltd. , Juniper Networks   Q6/15   2011-11-22
[ 1818 ]  
(Rev.1) 
Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics     Huawei Technologies Co. Ltd.   Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15   2011-11-22
[ 1817 ]  
(Rev.1) 
G.8021 editors contribution: OAM extraction process     Huawei Technologies Co. Ltd. , NEC Corporation   Q9/15   2011-11-22
[ 1816 ]  
(Rev.1) 
ODU SMP signalling considerations     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2011-11-22
[ 1814 ]  
(Rev.1) 
Proposal of ODU Shared Mesh Protection     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2011-11-22
[ 1813 ]  
(Rev.1) 
Protection Switching Interwoirking     Ericsson UK , Huawei Technologies Co. Ltd.   Q9/15   2011-11-22
[ 1808 ]  
(Rev.1) 
Text proposal for clause 15 "Mapping of client signals" in new Recommendation G.8012.1     China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Q10/15   2011-11-22
[ 1805 ]  
(Rev.1) 
Introduction of the super timeslots for ODU5     Huawei Technologies Co. Ltd.   Q11/15   2011-11-22
[ 1803 ]  
(Rev.1) 
Multi-VID ETH MEP and MIP functions     Huawei Technologies Co. Ltd.   Q9/15   2011-11-22
[ 1801 ]  
(Rev.1) 
Text proposal for Annex A "P2P, RMP, MP2MP, Hairpin Ethernet Connection Identifiers" of G.8012.1     China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Q10/15   2011-11-22
[ 1795 ]  
(Rev.1) 
G.8012 - G.8012.1 relationship     Huawei Technologies Co. Ltd.   Q10/15   2011-11-22
[ 1789 ]  
(Rev.1) 
Ethernet NNI and UNI information containment relationships     Huawei Technologies Co. Ltd.   Q10/15   2011-11-22
[ 1786 ]  
(Rev.1) 
Text proposal for Annex B "EVC <-> EC Peering and EVC <=> EC Client/Server Relationships" in new Recommendation G.8012.1     Huawei Technologies Co. Ltd.   Q10/15   2011-11-22
[ 1782 ]  
 
Withdrawn: reposted as TD240/WP2 - Characteristics of monitoring systems for optical fibre submarine cable systems  
Withdrawn
 
Huawei Technologies Co. Ltd.   Q8/15   2011-11-22
[ 1780 ]  
(Rev.1) 
Consideration on PTP over OTN solution options     Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2011-11-22
[ 1779 ]  
(Rev.1) 
Ethernet transport network node and port examples for inclusion in G.8021.1     Huawei Technologies Co. Ltd.   Q9/15   2011-11-22
[ 1778 ]  
(Rev.1) 
Update 1+1 SNC/N protection descriptions in clause 11.2/G.808.1     Huawei Technologies Co. Ltd.   Q9/15   2011-11-22
[ 1776 ]  
 
Multi layer optimization alternatives associated with Ethernet Service support     Huawei Technologies Co. Ltd.   Q12/15   2011-11-22
[ 1772 ]  
(Rev.1) 
Development of PTP time transport HRMs that encompass OTN     Alcatel-Lucent Italia S.p.A. , Huawei Technologies Co. Ltd.   Q13/15   2011-11-22
[ 1771 ]  
(Rev.1) 
Comment list of G.multi     Huawei Technologies Co. Ltd.   Q2/15   2011-11-22
[ 1770 ]  
(Rev.1) 
Modification to MPLS PW related MEs     Huawei Technologies Co. Ltd.   Q2/15   2011-11-22
[ 1768 ]  
(Rev.1) 
Protection GEM Port for Port Correlation     Huawei Technologies Co. Ltd.   Q2/15   2011-11-22
[ 1767 ]  
 
Withdrawn; Duplicate of C-1768 - Protection GEM Port for Port Correlation  
Withdrawn
 
Huawei Technologies Co. Ltd.   Q2/15   2011-11-22
[ 1763 ]  
(Rev.1) 
Consideration on the use of a new Ethertype for MPLS-TP     Huawei Technologies Co. Ltd. , ZTE Corporation   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1740 ]  
(Rev.1) 
Initiation Proposal of Multipoint Ethernet Connection Protection (MECP) study item in Q9/15     Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co. Ltd.   Q9/15   2011-11-22
Results:65 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-28