Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1763 ]
(Rev.1) |
Consideration on the use of a new Ethertype for MPLS-TP
|
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1762 ]
(Rev.1) |
OTN SMP
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1761 ]
(Rev.1) |
Consideration on scope of OTN SMP
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1760 ]
(Rev.1) |
One service with multiple protection paths in SMP
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1759 ]
(Rev.1) |
Race conditions in G.smp
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1758 ]
(Rev.1) |
Automatic switch in G.smp
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1757 ]
(Rev.1) |
Consideration on the adaptation of OTU5 over multichannel parallel interfaces
|
China Unicom
,
ZTE Corporation
|
Q11/15
|
2011-11-22 |
|
[ 1756 ]
(Rev.1) |
MPLS-TP OAM Recommendations - Proposed way forward
|
Japan
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1755 ]
(Rev.1) |
Possible scenario and actions to allow progress on MPLS-TP
|
Japan
|
Q10/15
|
2011-11-22 |
|
[ 1754 ]
(Rev.1) |
Proposal of new recommendation on multi layer converged transport network (G.mlctn)
|
ZTE Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
|
2011-11-22 |
|
[ 1753 ]
(Rev.1) |
Draft of multi layer converged network informative document
|
ZTE Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
|
2011-11-22 |
|
[ 1752 ]
(Rev.1) |
JDSU Time Offset Measurement
|
JDSU Deutschland GmbH
|
Q13/15
|
2011-11-22 |
|
[ 1751 ]
(Rev.1) |
Draft document of G.epon
|
Mitsubishi Electric Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
OKI Electric Industry Company Ltd. (OKI)
|
Q2/15
|
2011-11-22 |
|
[ 1750 ]
(Rev.1) |
Proposal for change of jitter test parameters in O.174 amd.1
|
Communications and Information network Association of Japan (CIA
|
Q15/15
|
2011-11-22 |
|
[ 1749 ]
(Rev.1) |
Proposal for Jitter measurement linearity in Appendix VII/O.172
|
Communications and Information network Association of Japan (CIA
|
Q15/15
|
2011-11-22 |
|
[ 1748 ]
(Rev.1) |
Consideration on the node numbers and transmission distance of OTN SRP
|
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1747 ]
(Rev.1) |
Proposed text for the description of Extra Traffic in Draft Rec. G.873.2
|
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1746 ]
(Rev.1) |
Proposal of DC-DQPSK in G.sup39
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q6/15
|
2011-11-22 |
|
[ 1745 ]
(Rev.1) |
Parameter Definitions of delay line interferometer of DQPSK in G.671
|
ZTE Corporation
|
Q7/15
|
2011-11-22 |
|
[ 1744 ]
(Rev.1) |
Requirement for communication latency, latency variation and loss as traffic engineering performance metrics in ASON
|
ZTE Corporation
|
Q14/15, Q12/15
|
2011-11-22 |
|
[ 1743 ]
(Rev.1-2) |
Considerations on beyond 100G transmission for G.Sup 39
|
China Unicom
,
ZTE Corporation
|
Q6/15
|
2011-11-22 |
|
[ 1742 ]
(Rev.1) |
Proposal for studying constellation in G.Sup39
|
ZTE Corporation
|
Q6/15
|
2011-11-22 |
|
[ 1741 ]
(Rev.1) |
Considerations on EVM in G.698.2
|
ZTE Corporation
|
Q6/15
|
2011-11-22 |
|
[ 1740 ]
(Rev.1) |
Initiation Proposal of Multipoint Ethernet Connection Protection (MECP) study item in Q9/15
|
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1739 ]
(Rev.1) |
Guidelines for interworking Protection schemes
|
Ericsson UK
|
Q9/15
|
2011-11-22 |
|
[ 1738 ]
(Rev.1) |
On-grid frequencies up & down proposal in Decision 2 of Decision Tree
|
Gemfire Europe Limited
,
Huawei Technologies Co. Ltd.
|
Q6/15
|
2011-11-22 |
|
[ 1737 ]
(Rev.1) |
Gigabit-capable Passive Optical Networks (G PON): Reach Extension; Contribution to Amendment 2: Raman amplified G-PON extender
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
OFS Fitel, LLC
|
Q2/15
|
2011-11-21 |
|
[ 1736 ]
(Rev.1) |
USA on Continued Work to Progress a Solution on G.8113.1
|
United States
|
Q10/15
|
2011-11-21 |
|
[ 1735 ]
(Rev.1) |
Internet Engineering Steering Group (IESG) Liaison Statement: Email Correspondence Between IETF Chair and TSB Director
|
Internet Society
|
|
2011-11-21 |
|
[ 1734 ]
|
Status of Jitter/Wander Requirements and Performance for the Transport of SDI Video Clients over OTN
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2011-11-21 |
|
[ 1733 ]
|
Rise time requirements of RS422 1PPS_OUT signal
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2011-11-21 |
|
[ 1732 ]
(Rev.1) |
Policy principles for cooperative standards development
|
Internet Society
|
|
2011-11-21 |
|
[ 1731 ]
|
Jitter/Wander Testing Related to Transport of PTPv2 Messages over OTN
|
Huawei Technologies Co. Ltd.
|
|
2011-11-21 |
|
[ 1730 ]
|
Maximum FFO of the Output of a Second-Order PLL due to a Sinusoidal and Triangular Wave Input
|
France Télécom Orange
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1729 ]
|
Initial Simulation Results for Transport of Time over the HRM2b chain of Boundary Clocks
|
France Télécom Orange
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1728 ]
|
Detection and removal of Delay Jumps using FWPR and minMATIE
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2011-11-21 |
|
[ 1727 ]
|
ESCON, Infiniband, and DVB_ASI Jitter Accumulation over OTN Islands
|
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2011-11-21 |
|
[ 1726 ]
|
Criterion for Minimum Detectable Floor Delay Step using minMATIE
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2011-11-21 |
|
[ 1725 ]
|
Initial Simulation Results for Transport of Time over the HRM3 chain of Boundary Clocks, with SyncE Reference Chain Rearrangements
|
France Télécom Orange
,
France Télécom Orange
,
Huawei Technologies Co.
,
Iometrix, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1724 ]
(Rev.1) |
Comments on TD 527
|
Cisco Systems, Inc.
,
France Télécom Orange
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
|
QALL/15, Q10/15, Q1/15
|
2011-11-21 |
|
[ 1723 ]
(Rev.1) |
Request for evaluation of OTN support for CPRI
|
AT&T, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1722 ]
(Rev.1) |
G.798 PT Interworking Smart?
|
AT&T, Inc.
|
Q9/15
|
2011-11-21 |
|
[ 1721 ]
|
Request for clarification on the February closing Plenary of ITU-T SG 15
|
Germany
|
QALL/15
|
2011-11-21 |
|
[ 1720 ]
|
Germany's observations regarding IETF RFCs in the ITU-T
|
Germany
|
QALL/15
|
2011-11-21 |
|
[ 1719 ]
|
Maintaining the functional model of the OTN in G.872
|
Germany
|
Q12/15
|
2011-11-21 |
|
[ 1718 ]
(Rev.1) |
Comments on the draft text of revised L.64
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2011-11-21 |
|
[ 1717 ]
(Rev.1) |
Progressing MPLS-TP OAM, Equipment, and Management Recommendations
|
Alcatel-Lucent USA Inc.
|
Q9/15, Q12/15, Q10/15
|
2011-11-21 |
|
[ 1716 ]
(Rev.1) |
SMP Protocol Functionality
|
Nokia Siemens Networks GmbH & Co. KG
|
Q9/15
|
2011-11-21 |
|
[ 1715 ]
(Rev.1) |
Proposed study plan of Question 17/15 for next study period
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2011-11-21 |
|
[ 1714 ]
(Rev.1) |
Development of G.SMP
|
Nokia Siemens Networks GmbH & Co. KG
|
Q9/15
|
2011-11-21 |
Results:420 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):