International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-02-14 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-02-14) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:51 total items.
Result page:  1 - 2  - Next Next
Contributions  [ AI/Question: Q12/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1518 ]  
 
Structuring of MPLS-TP Recommendations     Telefónica Investigación y Desarrollo   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-11
[ 1496 ]  
 
Multilayer SCN Issues     Ciena Corporation   Q14/15, Q12/15   2011-02-02
[ 1495 ]  
 
G.8080 - SP10 - call routing     Ciena Corporation   Q14/15, Q12/15   2011-02-02
[ 1494 ]  
 
G.8080 and multi-layer topology     Ciena Corporation   Q12/15   2011-02-02
[ 1491 ]  
 
Editing of G.8010 V2     Ciena Corporation   Q12/15   2011-02-02
[ 1468 ]  
 
Transitional Link attributes for optical transponders and 3R regenerators in the OTN     Alcatel-Lucent   Q14/15, Q12/15   2011-02-02
[ 1461 ]  
 
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications"     NSN   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1449 ]  
 
Further consideration of requirements for on-demand segment monitoring in MPLS-TP     NTT , Telecom Italia   Q12/15, Q10/15   2011-02-02
[ 1448 ]  
 
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP     NTT   Q12/15, Q10/15   2011-02-02
[ 1445 ]  
 
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions     ISOC   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1441 ]  
 
Withdrawn: MPLS-TP Standards     BT   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1439 ]  
 
Comments on differentiation of MPLS-TP environments     NSN   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1396 ]  
 
Relation between G.aon and G.872     Deutsche Telekom   Q12/15   2011-02-01
[ 1395 ]  
 
WCh clients in draft G.aon     Deutsche Telekom   Q12/15   2011-02-01
[ 1394 ]  
 
Properties of a Wavelength Channel in draft G.aon     Deutsche Telekom   Q12/15   2011-02-01
[ 1385 ]  
 
Support for the consent of G.8110.1 and G.tpoam     Italy   Q12/15, Q10/15   2011-02-01
[ 1384 ]  
 
Structure and content of the MPLS-TP Recommendations     Telecom Italia   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1372 ]  
 
Withdrawn: Continued cooperation with IETF on MPLS for Transport Networks     Israel   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1370 ]  
 
Comments on working assumption at Berlin meeting and TD377 (wd31r1)     NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon   Q9/15, Q12/15, Q10/15   2011-02-01
[ 1362 ]  
 
Support for the consent of G.8110.1 and G.tpoam     SK Telecom , ETRI   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1361 ]  
 
Structure of the MPLS-TP Recommendations     SK Telecom , ETRI   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1346 ]  
 
Nested Restoration Domains - Data-plane maintenance overhead signals     Tellabs Oy   Q9/15, Q12/15, Q11/15   2011-02-01
[ 1324 ]  
 
Proposal to re-define the architectures for MPLS-TP linear protection     Fujitsu   Q9/15, Q12/15   2011-02-01
[ 1307 ]  
 
Associated Channel Type for G.tpoam     Portugal Telecom   Q12/15   2011-02-01
[ 1306 ]  
 
Support for the consent of G.8110.1 and G.tpoam     Portugal Telecom   Q12/15, Q10/15   2011-02-01
[ 1305 ]  
 
Procedural issues on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-02-01
[ 1303 ]  
 
Inter SDO Cooperation on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5   2011-02-01
[ 1301 ]  
 
Operator Requirements for MPLS-TP OAM     Verizon , BT , France Telecom Orange , Qwest , Telenor , Telstra   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1298 ]  
 
MPLS-TP OAM - issues with the proposed Y.1731 based OAM solution     Juniper Networks , Cisco , NSN , Verizon   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1297 ]  
 
Considerations on G.800 style ETH transport processing functions in draft revised G.8010     Huawei , Deutsche Telekom   Q12/15   2011-02-01
[ 1296 ]  
 
G.800 server subnetwork and ETH server subnetwork definitions     Huawei , Deutsche Telekom   Q12/15   2011-02-01
[ 1295 ]  
 
Models in G.8010     Huawei , Deutsche Telekom   Q9/15, Q14/15, Q12/15   2011-02-01
[ 1285 ]  
 
Associated Channel Type for G.tpoam     WIND   Q12/15   2011-01-31
[ 1279 ]  
 
Consideration on TS sequence in HAO     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1258 ]  
 
Comments on the requirement of the same number of tributary slots on every link along a resizable ODUflex connection in G.hao     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1256 ]  
 
Requirement for communication latency as a traffic engineering performance metric in ASON     ZTE   Q14/15, Q12/15   2011-01-31
[ 1248 ]  
 
PTN GACh+Y.1731 OAM interoperability test activities and result     CATR , China Mobile   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1247 ]  
 
Support for the consent of G.8110.1 and G.tpoam     China MIIT   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1244 ]  
 
Support for the consent of G.8110.1     NEC , Fujitsu , Hitachi   Q12/15   2011-01-31
[ 1221 ]  
 
Comments on draft G.aon     Huawei   Q12/15   2011-01-31
[ 1220 ]  
 
G.800 Terminology Proposals     Huawei   Q12/15   2011-01-31
[ 1207 ]  
 
Support for consent of G.tpoam     ZTE , Alcatel-Lucent Shanghai Bell , Fiberhome , Huawei   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1200 ]  
 
Withdrawn by TSB (superseded): See C-1297, "Considerations on G.800 style ETH transport processing functions in draft revised G.8010"     Huawei   Q12/15   2011-01-31
[ 1198 ]  
 
Proposed text for clauses 6.3.4.5.2 to 6.3.4.5.6 in draft revised G.8010     Huawei   Q12/15   2011-01-31
[ 1174 ]  
 
Evolution of G.8011 Ethernet Services     Ericsson Canada   Q12/15, Q10/15   2011-01-31
[ 1171 ]  
 
Comments on G.8010 Amendment 2     Ericsson Canada   Q9/15, Q12/15   2011-01-31
[ 1169 ]  
 
Proposal to align G.8021 with IEEE 802.1Q ingress VID filtering     Ericsson Canada   Q9/15, Q12/15   2011-01-31
[ 1167 ]  
 
PBB model for G.8021 & G.8010     Ericsson Canada   Q9/15, Q14/15, Q12/15   2011-01-31
[ 1143 ]  
(Rev.1) 
MPLS-TP Standards     United Kingdom   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-28
[ 1124 ]  
 
Structure and content of the MPLS-TP Recommendations     CMCC,CT , CATR   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-28
Results:51 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-25