Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1243 ]
|
Comments on the extension of proactive loss measurement in Y.1731/G.8021
|
NEC
,
Hitatchi
|
Q9/15, Q10/15
|
2011-01-31 |
|
[ 1242 ]
|
G.gen, G.vdsl: An Introduction to Advances in Multi-Wire Transmission Technologies
|
Huawei
|
Q4/15
|
2011-01-31 |
|
[ 1241 ]
|
G.vdsl: Updated Working Text for Distribution of Time-of-Day over VDSL2 Links
|
Huawei
,
China MIIT
|
Q4/15
|
2011-01-31 |
|
[ 1240 ]
|
G.vector: A Comment on G.993.5 (04/2010)
|
Huawei
|
Q4/15
|
2011-01-31 |
|
[ 1239 ]
|
Proposed clarification of ETH-CSF specification in Y.1731
|
NEC
|
Q9/15, Q10/15
|
2011-01-31 |
|
[ 1238 ]
|
The end-to-end service resilience with combination of G.8032 and STP
|
NEC
|
Q9/15
|
2011-01-31 |
|
[ 1237 ]
|
Consideration of SD triggered Protection Switching in G.8031
|
NEC
|
Q9/15
|
2011-01-31 |
|
[ 1236 ]
|
Proposed modifications to ETH-SLM processes in G.8021
|
NEC
|
Q9/15
|
2011-01-31 |
|
[ 1235 ]
|
Proposal on maximum PTP clock number in the time reference model
|
CMCC
,
CATR
,
ZTE
|
Q13/15
|
2011-01-31 |
|
[ 1234 ]
|
TOD specification
|
CMCC
,
CATR
,
Huawei
,
ZTE
|
Q13/15
|
2011-01-31 |
|
[ 1233 ]
|
PTP frequency sync with partial timing support
|
ZTE
|
Q13/15
|
2011-01-31 |
|
[ 1232 ]
|
Proposals on the BC simulation model in G.8273
|
ZTE
|
Q13/15
|
2011-01-31 |
|
[ 1231 ]
|
Proposed text for initial draft of O.xgponjitter
|
CIAJ
|
Q15/15
|
2011-01-31 |
|
[ 1230 ]
|
Proposal for change of jitter test parameters in O.174 amd.1
|
CIAJ
|
Q15/15
|
2011-01-31 |
|
[ 1229 ]
|
G.hn: Proposal for neighbour domain co-ordination
|
Metanoia Technologies
|
Q4/15
|
2011-01-31 |
|
[ 1228 ]
|
G.inp: Proposed clarification to retransmission return channel
|
Metanoia Technologies
|
Q4/15
|
2011-01-31 |
|
[ 1227 ]
|
The wavelength bands for G.sdapp systems
|
KT
|
Q6/15
|
2011-01-31 |
|
[ 1226 ]
|
Comments on draft Recommendation L.coi
|
NTT
|
Q16/15
|
2011-01-31 |
|
[ 1225 ]
|
Draft new Recommendation L.aid "Aerial infrastructure design for optical access network"
|
NTT
|
Q18/15
|
2011-01-31 |
|
[ 1224 ]
|
Draft new Recommendation L.omtl "An optical fibre cable maintenance support, monitoring and testing system for optical fibre cable networks for trunk lines"
|
NTT
|
Q17/15
|
2011-01-31 |
|
[ 1223 ]
|
Information on MPI characteristics under various deployment conditions
|
NTT
|
Q5/15
|
2011-01-31 |
|
[ 1222 ]
|
Draft Appendix to G.650.3 regarding macrobending detection method
|
SoftBank Telecom
|
Q5/15
|
2011-01-31 |
|
[ 1221 ]
|
Comments on draft G.aon
|
Huawei
|
Q12/15
|
2011-01-31 |
|
[ 1220 ]
|
G.800 Terminology Proposals
|
Huawei
|
Q12/15
|
2011-01-31 |
|
[ 1219 ]
|
G.827x Renumbering
|
RAD Data Communications
|
Q13/15
|
2011-01-31 |
|
[ 1218 ]
|
Grandmaster Clock Functional Model
|
RAD Data Communications
|
Q13/15
|
2011-01-31 |
|
[ 1217 ]
|
Telecom Boundary Clock Functional Model
|
RAD Data Communications
|
Q13/15
|
2011-01-31 |
|
[ 1216 ]
|
Aspects of Time Distribution over GPON
|
RAD Data Communications
|
Q13/15
|
2011-01-31 |
|
[ 1215 ]
|
G.827x 1 pps output specification: Minimum requirements - A vendor perspective
|
RAD Data Communications
|
Q13/15
|
2011-01-31 |
|
[ 1214 ]
|
New Quality Level for Synchronous Ethernet
|
RAD Data Communications
|
Q13/15
|
2011-01-31 |
|
[ 1213 ]
|
PTP Clocks Simulation Models
|
RAD Data Communications
|
Q13/15
|
2011-01-31 |
|
[ 1212 ]
|
Noise Sources in Time Distribution Schemes
|
RAD Data Communications
|
Q13/15
|
2011-01-31 |
|
[ 1211 ]
|
IPv6 related MEs updation for G.988
|
ZTE
,
China MII
|
Q2/15
|
2011-01-31 |
|
[ 1210 ]
|
The support of OSC transmition 1588V2 in OTN/G.798.1
|
Fiberhome Technologies Group
,
China Academy of Telecommunication Research
|
Q9/15, Q13/15, Q11/15
|
2011-01-31 |
|
[ 1209 ]
|
OAM for G.ptneq
|
NSN
|
Q9/15
|
2011-01-31 |
|
[ 1208 ]
(Rev.1) |
Non-ERP node in ring (G.8032)
|
ZTE
,
China
|
Q9/15
|
2011-01-31 |
|
[ 1207 ]
|
Support for consent of G.tpoam
|
ZTE
,
Alcatel-Lucent Shanghai Bell
,
Fiberhome
,
Huawei
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-01-31 |
|
[ 1206 ]
|
Updated description for multicast preview function in G.988
|
ZTE
,
Huawei
|
Q2/15
|
2011-01-31 |
|
[ 1205 ]
|
Ignore value setting for attribute Dynamic filtering ageing time of ME MAC bridge service profile in G.988
|
ZTE
|
Q2/15
|
2011-01-31 |
|
[ 1204 ]
|
Proposal for adding a term in G.tpoam
|
Fiberhome Technologies Group
|
Q10/15
|
2011-01-31 |
|
[ 1203 ]
|
The Clarification of application scope of CC function in G.tpoam
|
Fiberhome Technologies Group
|
Q10/15
|
2011-01-31 |
|
[ 1202 ]
|
Description of Up and Down MEP and MIP functions in G.tpoam
|
FiberHome Technologies Group
,
China
|
Q10/15
|
2011-01-31 |
|
[ 1201 ]
|
Clarification of half MIP and full MIP functions
|
FiberHome Technologies Group
,
China
|
Q10/15
|
2011-01-31 |
|
[ 1200 ]
|
Withdrawn by TSB (superseded): See C-1297, "Considerations on G.800 style ETH transport processing functions in draft revised G.8010"
|
Huawei
|
Q12/15
|
2011-01-31 |
|
[ 1199 ]
|
1DM checking and DMR generation
|
Alcatel-Lucent USA
|
Q9/15, Q10/15
|
2011-01-31 |
|
[ 1198 ]
|
Proposed text for clauses 6.3.4.5.2 to 6.3.4.5.6 in draft revised G.8010
|
Huawei
|
Q12/15
|
2011-01-31 |
|
[ 1197 ]
|
Proposed extension of clause 6/G.8011
|
Huawei
|
Q10/15
|
2011-01-31 |
|
[ 1196 ]
|
Application of EOTN within MEF Global Interconnect
|
Huawei
|
Q9/15, Q10/15
|
2011-01-31 |
|
[ 1195 ]
|
Withdrawn by TSB (superseded): See C-1295, "Models in G.8010"
|
N/A
|
|
2011-01-31 |
|
[ 1194 ]
|
Withdrawn by TSB (superseded): See C-1296, "G.800 server subnetwork and ETH server subnetwork definitions"
|
N/A
|
|
2011-01-31 |
Results:418 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):