International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2009-09-28 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2009-09-28) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2009-09-28 to 2009-10-09

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-05-15  2008-12-01 

Results:83 total items.
Result page:  1 - 2  - Next Next
Contributions  [ AI/Question: 9/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 745 ]  
 
Supporting a broadband backhaul application in the PTN     Huawei Technologies   Q9/15   2009-09-22
[ 725 ]  
 
Editorial modification proposal for G.8032 version 2     Republic of Korea   Q9/15   2009-09-20
[ 724 ]  
 
FDB flush operation immune to delayed data frames     Republic of Korea   Q9/15   2009-09-20
[ 723 ]  
 
FDB inconsistency problem caused by delayed data frames     Republic of Korea   Q9/15   2009-09-20
[ 722 ]  
 
Proposal on the modification of initialization scheme in Ethernet ring protection network in G.8032v1.     ETRI   Q9/15   2009-09-20
[ 721 ]  
 
Efficient network restoration scheme for G.8032     Republic of Korea   Q9/15   2009-09-20
[ 720 ]  
 
The appropriate use of Guard timer in pending state in G.8032     Republic of Korea   Q9/15   2009-09-20
[ 701 ]  
 
Proposal to define ATM, FR, PPP, HDLC, SDH over Ethernet mappings     Huawei Technologies   Q9/15, Q10/15   2009-09-20
[ 700 ]  
 
Proposal on Ring Protection     Huawei Technologies   Q9/15   2009-09-20
[ 699 ]  
 
Proposal on PTN Equipment Types     Huawei Technologies   Q9/15   2009-09-20
[ 698 ]  
 
Proposal on MVC and EVC in G.ptneq     Huawei Technologies   Q9/15   2009-09-20
[ 697 ]  
 
Extension of APS for Generic Dual Node Interconnection Protection     Huawei Technologies   Q9/15   2009-09-20
[ 690 ]  
 
Proposal on the state machine and APS PDU in G.8031     Huawei Technologies   Q9/15   2009-09-20
[ 689 ]  
 
Proposal on ACL-SNCG/I protection switching for microwave network in G.8031     Huawei Technologies   Q9/15   2009-09-20
[ 688 ]  
 
Proposal on extending linear protection switching for variable link in G.808.1     Huawei Technologies   9/15   2009-09-20
[ 684 ]  
(Rev.1) 
Proposal on adding bandwidth notification function in G.808.1 and G.8031     Huawei Technologies   Q9/15   2009-09-20
[ 667 ]  
 
Improve Main ring flushing due to sub-ring topology change through Port based flushing     Tejas Networks Ltd   Q9/15   2009-09-20
[ 666 ]  
 
FS operation during node failure     Tejas Networks Ltd   Q9/15   2009-09-20
[ 665 ]  
 
BPR Operation     Tejas Networks Ltd   Q9/15   2009-09-20
[ 664 ]  
 
Traffic Black Holing with Multiple Failures     Tejas Networks Ltd   Q9/15   2009-09-20
[ 596 ]  
 
FDB flush scheme for G.8032 Ethernet ring protection     ETRI   Q9/15   2009-09-18
[ 588 ]  
 
Proposal for avoiding re-flushing (G.8032)     ZTE Corporation   Q9/15   2009-09-18
[ 584 ]  
 
Solution to backward compatibility logic problem in G.8032v2 (G.8032)     ZTE Corporation   Q9/15   2009-09-18
[ 578 ]  
 
Comments on blocking the both ends of RPL (G.8032)     ZTE Corporation   Q9/15   2009-09-18
[ 576 ]  
 
Proposal for behaviour of RPL owner receiving an NR message with higher NODE_ID in G.8032v2     NTT   Q9/15   2009-09-18
[ 575 ]  
 
A set of methods for flushing FDB in G.8032v2     NTT   Q9/15   2009-09-18
[ 574 ]  
 
Support of protection mechanism in case of multi-ring network with double failures in G.8032v2     NTT   Q9/15   2009-09-18
[ 573 ]  
 
Clarification of state machine in case of Clear to remote MS/FS node in G.8032v2     NTT   Q9/15   2009-09-18
[ 572 ]  
 
ODUflex hitless resizing method     Huawei Technologies , China Mobile Communications Corp   Q9/15, Q11/15   2009-09-18
[ 571 ]  
 
Proposal for enhancements to Interconnection Flush logic in G.8032v2     NTT   Q9/15   2009-09-18
[ 570 ]  
 
Guidelines for configuration of VIDs and Ring-IDs of R-APS channels in G.8032v2     NTT   Q9/15   2009-09-18
[ 566 ]  
 
Considerations on the coexistence of Forced Switch and Signal Fail in G.8032 v2     ETRI   Q9/15   2009-09-18
[ 559 ]  
 
Proposals about MPLS-TP and Ethernet Protection Support Signal Degrade     CATR , China Mobile Communications Corp , MIIT   Q9/15, Q10/15   2009-09-18
[ 555 ]  
 
Comments and proposals on the Summary text of G.808.2     HItachi   Q9/15   2009-09-18
[ 554 ]  
 
Comments and proposals on the text of group protection in G.808.2     Hitachi   Q9/15   2009-09-18
[ 553 ]  
 
Comments and proposals on the Summary and Scope of G.808.1     Hitachi   Q9/15   2009-09-18
[ 552 ]  
 
Comments on the layer stack description in G.ptneq     Hitachi   Q9/15   2009-09-18
[ 546 ]  
 
G.8032v2 Priority Logic description update     NSN   Q9/15   2009-09-18
[ 533 ]  
 
HO and LO ODUk Shared Ring Protection (SRP)     Huawei Technologies , China Academy of Telecommunication Research, MII , China Mobile Communications Corporation   Q9/15   2009-09-18
[ 524 ]  
 
Proposal to determine BS/GS based on near-end information in G.8021     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 523 ]  
 
Proposal to clarify MI_CC_Enable only controls CCM generation in G.8021     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 522 ]  
 
G.8031 handling of DNR and WTR requests in revertive and non revertive mode, respectively     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 521 ]  
 
G.8031 state transition when WTR timers differ at both ends     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 520 ]  
 
G.8031 state transitions when a Clear command is issued, or SF-P (or SF) recovers     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 519 ]  
 
G.8031 state transitions when working recovers from SF     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 518 ]  
 
Maintaining the independence of the two ring interconnection options in G.8032v2     Alcatel-Lucent USA   Q9/15   2009-09-18
[ 516 ]  
 
Proposal to rename the "RPL Node" in G.8032v2     Alcatel-Lucent USA   Q9/15   2009-09-18
[ 514 ]  
 
Proposal to review and update G.8032 Study Points and Living List     Alcatel-Lucent USA   Q9/15   2009-09-18
[ 512 ]  
 
Proposed modifications to G.8021 and G.8032 for R-APS-specific dFOP-PM and dFOP-TO     Alcatel-Lucent USA, AimValley BV   Q9/15   2009-09-17
[ 503 ]  
 
G.8032v2 Priority Logic description update     NSN   Q9/15   2009-09-17
Results:83 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-28