International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2008-12-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2008-12-01) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2008-12-01 to 2008-12-12

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15 

Results:57 total items.
Result page:  1 - 2  - Next Next
Contributions  [ AI/Question: Q9/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 338 ]  
 
G.8032 SF and FS     Alcatel-Lucent, AimValley BV   Q9/15   2008-11-28
[ 335 ]  
 
Signal Degrade (SD) triggered protection switching     Huawei Technologies Co., Ltd.   Q9/15   2008-11-26
[ 334 ]  
 
Proposal on the link recovery in case of multiple failures in G.8032     Huawei Technologies Co., Ltd.   Q9/15   2008-11-26
[ 333 ]  
 
Proposal on the ring node initialization in G.8032     Huawei Technologies Co., Ltd.   Q9/15   2008-11-26
[ 332 ]  
 
Proposal on flush optimization support in G.8032     Huawei Technologies Co., Ltd.   Q9/15   2008-11-26
[ 331 ]  
 
Proposal on non-revertive mode in G.80323     Huawei Technologies Co., Ltd.   Q9/15   2008-11-26
[ 307 ]  
 
G.8032 Flushing     Alcatel-Lucent   Q9/15   2008-11-25
[ 306 ]  
 
G.8032 WTR and WTB comments     Alcatel-Lucent, AimValley BV   Q9/15   2008-11-25
[ 305 ]  
 
G.8032 Statemachine     Alcatel-Lucent, AimValley BV   Q9/15   2008-11-25
[ 304 ]  
 
G.8032 Priority Logic and Statemachine     Alcatel-Lucent, AimValley BV   Q9/15   2008-11-25
[ 303 ]  
 
G.8032 Hidden Transitions     Alcatel-Lucent, AimValley BV   Q9/15   2008-11-25
[ 294 ]  
 
Includes pending state to support flushing FDB in non_revertive mechanism (G.8032)     ZTE Corporation, China   Q9/15   2008-11-23
[ 293 ]  
 
Flushing behaviour in interconnected ring protection (G.8032)     ZTE Corporation, China   Q9/15   2008-11-23
[ 292 ]  
 
FDB Flush Problem in non_revertive operation     ZTE Corporation, China   Q9/15   2008-11-23
[ 291 ]  
 
Difference between sub-ring and single ring protection (G.8032)     ZTE Corporation, China   Q9/15   2008-11-23
[ 290 ]  
 
Comparison between shared-link and sub-ring models (G.8032)     ZTE Corporation, China   Q9/15   2008-11-23
[ 279 ]  
 
G.8032 protection switching transient traffic performance requirement for next study period     ETRI (Republic of Korea)   Q9/15   2008-11-23
[ 278 ]  
 
FDB-delete scheme for fast protection switching in G.8032 Ethernet ring protection     ETRI (Korea, Republic of)   Q9/15   2008-11-23
[ 272 ]  
 
Naming Considerations regarding T-MPLS and MPLS-TP within ITU-T     Alcatel-Lucent Italia, Alcatel Shanghai Bell, Ital   Q9/15, Q3/15, Q11/15   2008-11-23
[ 260 ]  
 
Proposal to specify Failure of Protocol defects for the R-APS protocol     Lucent Technologies, Inc - AimValley BV   Q9/15   2008-11-21
[ 249 ]  
 
Corrigendum for G.709 correcting small mistake and inconsistency with G.798     Alcatel Lucent Germany   Q9/15, Q11/15   2008-11-21
[ 233 ]  
 
Text proposal for clause 9.1.4/G.8021 ETH Split Horizon Flow Forwarding Function     Huawei Technologies Co., Ltd.   Q9/15   2008-11-21
[ 226 ]  
 
Signal quality supervision functionality added into OCh and OMS layer (G.798)     MII China   Q9/15   2008-11-21
[ 217 ]  
 
A couple of correction proposals to G.798     MII, China   Q9/15   2008-11-21
[ 216 ]  
 
Proposal of various modifications to G.8032 version 2     Lucent Technologies, Inc   Q9/15   2008-11-21
[ 180 ]  
 
Proposed text for G.supxx "Client services Sub ODU1 mapping into OTN using HO-VC mapping"     Alcatel-Lucent   Q9/15   2008-11-21
[ 171 ]  
 
Comments on draft Recommendation G.8032 Version 2     ETRI   Q9/15   2008-11-21
[ 162 ]  
 
Comments on the current text of G.808.2 and G.808.1     Hitachi   Q9/15   2008-11-21
[ 161 ]  
 
Comments on RPL location in shared link case in G.8032v2     Hitachi   Q9/15   2008-11-21
[ 156 ]  
 
State machine modification for forced switch in G.8032 Version 2     ETRI, Korea (Republic of)   Q9/15   2008-11-21
[ 148 ]  
 
Proposal on the modification of the state machine initialization and some figures in G.8032v2     ETRI   Q9/15   2008-11-21
[ 127 ]  
 
Ethernet Ring Topology Proposal     ADTRAN   Q9/15, Q14/15, Q12/15   2008-11-20
[ 126 ]  
 
Proposed modification for the interoperability of ETH-LT in Y.1731     Fujitsu   Q9/15, Q10/15   2008-11-20
[ 114 ]  
 
Reconsideration of topology restrictions on G.8032v2     NEC Corporation and Fujitsu   Q9/15   2008-11-20
[ 105 ]  
 
G.8021 Appendix II Correction     AT&T   Q9/15   2008-11-20
[ 102 ]  
 
Comments on G.8032 Version 2 - Ethernet ring protection switching     Korea (Republic of)   Q9/15   2008-11-20
[ 94 ]  
 
G.8032 Efficient Flushing Mechanism     Tejas Networks Ltd   Q9/15   2008-11-20
[ 93 ]  
 
G.8032 Dual Node Interconnect     Tejas Networks Ltd   Q9/15   2008-11-20
[ 80 ]  
(Rev.1) 
Proposed modification of clearing FS/MS commands on G.8032     NEC Corporation   Q9/15   2008-11-19
[ 63 ]  
 
Requirement for protected ring designation on shared link failure.     NTT   Q9/15   2008-11-18
[ 61 ]  
 
A requirement of flexible interconnected rings construction for an ERP functional model     NTT   Q9/15   2008-11-18
[ 57 ]  
 
Proposal of G.8032 Adaptation Function Description to G.8021     NTT, Nokia Siemens Networks GmbH & Co. KG   Q9/15   2008-11-18
[ 55 ]  
 
Proposal of scope and order of priority for the second version of G.8032.     NTT, Nokia Siemens Networks GmbH & Co. KG   Q9/15   2008-11-18
[ 45 ]  
 
G.8032 (ERP Version Control Protocol)     Nortel Networks (Canada)   Q9/15   2008-11-18
[ 44 ]  
 
G.8032 (Multiple Failure Support)     Nortel Networks (Canada)   Q9/15   2008-11-18
[ 43 ]  
 
G.8032 (Ring and Sub-Ring Proposal)     Nortel Networks (Canada)   Q9/15   2008-11-18
[ 40 ]  
 
Proposed inclusion of a PBB model in G.8021     Nortel Networks (Canada)   Q9/15, Q12/15   2008-11-18
[ 39 ]  
 
G.8032 (ERP Protocol Enhancements in Support of Backwards Compatibility)     Nortel Networks (Canada)   Q9/15   2008-11-18
[ 37 ]  
 
Summary of WSON work     Ciena Corporation   Q9/15, Q14/15, Q12/15   2008-11-18
[ 18 ]  
 
G.8021 Adaptation Function For PBB     Nortel Networks (Canada)   Q9/15   2008-11-17
Results:57 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-26