International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 13 : Meeting 2011-01-17 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 13  C (2011-01-17) 

ITU-T SG 13

Future networks including mobile and NGN

Study Period 2009

Meeting  from 2011-01-17 to 2011-01-28

held in Switzerland [Geneva]

Other Meetings : 2012-06-04  2012-02-17  2012-02-06  2011-10-10  2011-05-20  2010-09-16  2010-04-19  2010-01-29  2009-09-02  2009-05-22  2009-01-12 

Results:15 total items.
Contributions  [ Source: Korea (Rep. of) ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 827 ]  
 
Updating contents of Y.iras document-TD134     Korea (Rep. of)   Q14/13   2011-01-07
[ 826 ]  
 
Proposal for redefining term Condition and related information elements in Y.dpireq     Korea (Rep. of)   Q17/13   2011-01-07
[ 825 ]  
 
Draft Amendment to Recommendation Y.2122, "Information Model and Message Format for Flow Aggregate Information Exchange Functions (FIXF) in NGN"     Korea (Rep. of)   Q4/13   2011-01-07
[ 824 ]  
 
Proposed modification of Y.iptv-netcontrol-fw     Korea (Rep. of)   Q3/13   2011-01-07
[ 823 ]  
 
Proposed modification of Y.ipev     Korea (Rep. of)   Q12/13   2011-01-07
[ 822 ]  
 
Revised draft of Y.ipv6-vmh in 2011 January meeting     Korea (Rep. of)   Q7/13   2011-01-07
[ 821 ]  
 
Service scenario and use case for the profile based application adaptation service     Korea (Rep. of)   Q14/13   2011-01-07
[ 820 ]  
 
Modification of Roaming Procedures in Section 9     Korea (Rep. of)   Q22/13   2011-01-07
[ 819 ]  
 
Modification of Handover Scenarios in Section 11     Korea (Rep. of)   Q22/13   2011-01-07
[ 818 ]  
 
Modification of Handover Procedures in Section 9     Korea (Rep. of)   Q22/13   2011-01-07
[ 817 ]  
 
Proposal for the revised text for Section 7.2.1 in draft Y.ipv6split     Korea (Rep. of)   Q7/13   2011-01-07
[ 816 ]  
 
Proposal for the editorial changes in draft Y.ipv6split     Korea (Rep. of)   Q7/13   2011-01-07
[ 815 ]  
 
Proposed modifications in the service model of Y.gms     Korea (Rep. of)   Q14/13   2011-01-07
[ 814 ]  
 
Proposed modifications in the service scenarios of Y.gms     Korea (Rep. of)   Q14/13   2011-01-07
[ 813 ]  
 
Propose immediate approval of FG-FN Deliverable, "Future Networks: Objectives and Design Goals" as an ITU-T Recommendation     Korea (Rep. of)   Q21/13   2011-01-07
Results:15 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-30