International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 11 : Meeting 2009-09-02 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 11  C (2009-09-02) 

ITU-T SG 11

Signalling requirements, protocols and test specifications

Study Period 2009

Meeting  from 2009-09-02 to 2009-09-10

held in Argentina [Mar del Plata]

Other Meetings : 2012-06-11  2012-02-17  2011-10-17  2011-05-20  2011-05-13  2011-01-24  2010-09-10  2010-04-26  2010-01-28  2009-05-21  2009-01-19 

Results:5 total items.
Contributions  [ AI/Question: Q15/11 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 124 ]  
 
Proposal of new clause data delivery mechanism to X.mmc-3     ETRI   Q15/11   2009-08-24
[ 123 ]  
 
Proposal of procedure flow for normal MMC-3 operation to be included in appendix of X.mmc-3     ETRI   Q15/11   2009-08-24
[ 100 ]  
 
Proposed Modification of X.mmc-3, "Information Technology - Mobile Multicast Communications: Protocol over Overlay Multicast Networks"     Korea, (Rep. of)   Q15/11   2009-08-21
[ 99 ]  
 
Proposed modification of X.rmcp-3, Information technology - Relayed multicast protocol: Specification for N-plex group applications     Korea (Rep. of)   Q15/11   2009-08-21
[ 98 ]  
 
X.603.1/Draft Amd.1 : Proposed Final draft Recommendation for Secure RMCP-2     Korea (Rep. of)   Q15/11   2009-08-21
Results:5 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-26