Français
Español
Home
:
ITU-T
:
SG09
:
Contributions
Recently posted
-
Search Meeting Documents
ITU-T SG09 C
ITU-T SG09
Max # of documents displayed/page:
Video transport and quality & Terminals and applications
Study Period 2009
Results:
10
total items.
Contributions
[ Questions: Q3/9 ]
Number
Received
Source
Title
Questions
[ 102 ]
2012-04-17
Korea (Rep. of)
Proposed modification of CRS network protocol flows
Q3/9
[ 101 ]
2012-04-17
Korea (Rep. of)
Proposal of CWEK generation phase flows for CRS pairing protocol
Q3/9
[ 100 ]
2012-04-17
Korea (Rep. of)
Consideration of merging J.rcas-pair and Jrcas-net
Q3/9
[ 87 ]
2011-11-08
Korea (Rep. of)
Proposal of New Standardization Work Item for CRS NETWORK PROTOCOL specification
Q3/9
[ 86 ]
2011-11-08
Korea (Rep. of)
Proposal New Standardization Work Item for CRS PAIRING specification
Q3/9
[ 84 ]
2011-11-08
Korea (Rep. of)
Editorial check of J.rcas-req for proposing AAP consent
Q3/9
[ 69 ]
2011-03-03
Japan Cable Laboratories
Comments for J.rcas-req
Q3/9
[ 60 ]
2011-02-23
Korea (Rep. of)
Proposed modifications to draft J.rcas-req
Q3/9
[ 53 ]
2010-11-08
Korea (Rep. of)
Proposed modifications to draft new recommendation J.rcas-req
Q3/9
[ 36 ]
2010-06-30
ETRI
Considerations of conditional access client software remote renewable security system standardization in ITU-T SG9 Q3/9
Q3/9
Results:
10
total items.
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2013-6-20