Contributions
[ Questions: Q21/5 ]  |
|
Number
|
Received
|
Source
|
Title
|
Questions
|
|
[ 522 ]
|
2012-09-27 |
China
|
Proposal on write into the efficiency and no-load power requirements of China in L.UPA draft on Appendix II
|
Q21/5
|
|
[ 521 ]
|
2012-09-27 |
China
|
Contribution of Basic Configuration, Voltage/Current definition, Ripple and Ripple Noise Voltage measurement to the draft
|
Q21/5
|
|
[ 517 ]
|
2012-09-26 |
Telecom Italia S.p.A.
|
Interworking solutions between EPS and ICT equipment
|
Q21/5
|
|
[ 516 ]
|
2012-09-25 |
Telecom Italia S.p.A.
|
Proposal for a Recommendation on Universal power Adaptor for non-stationary use
|
Q21/5
|
|
[ 515 ]
|
2012-09-25 |
Telecom Italia S.p.A.
|
Press Release from ANEC (consumers' association) on connector for mobile charging
|
Q21/5
|
|
[ 503 ]
(Rev.1) |
2012-09-25 |
United Kingdom
|
Battery Standardisation (Universal Design) - Study Input & Conclusions
|
Q21/5
|
|
[ 502 ]
|
2012-09-25 |
Japan
|
Proposal to modify for L.CPS_stationary_draft V005
|
Q21/5
|
|
[ 501 ]
|
2012-09-25 |
Japan
|
Proposal to modify for L.CPS_stationary_draft V005 - Proposal to modify of DC output interface characteristics
|
Q21/5
|
|
[ 500 ]
|
2012-09-25 |
Japan
|
Proposal to modify for L.CPS_stationary_draft V005 - Proposal to modify of Scope and basic function
|
Q21/5
|
|
[ 499 ]
|
2012-09-25 |
Japan
|
Proposal on ripple noise voltage and measuring method of CPS in L.CPS_stationary
|
Q21/5
|
|
[ 498 ]
|
2012-09-25 |
Japan
|
Proposal on no-load power consumption of CPS in L.CPS_stationary
|
Q21/5
|
|
[ 497 ]
|
2012-09-25 |
Japan
|
Proposal on average conversion efficiency and 10% partial load conversion efficiency of CPS in L.CPS_stationary
|
Q21/5
|
|
[ 496 ]
|
2012-09-25 |
Motorola Mobility LLC
|
Joint industry response to contribution C421
|
Q21/5
|
|
[ 492 ]
|
2012-09-25 |
Korea (Rep. of)
,
Thailand
|
Information about an ICT&CC-WG activity of APT Standardization Program Forum
|
Q21/5
|
|
[ 486 ]
|
2012-09-25 |
Korea (Rep. of)
|
Experimental results for draft Recommendation of L.rareMetals-measurement, "Measurement method to characterize rare metals of ICT goods"
|
Q21/5
|
|
[ 483 ]
|
2012-09-25 |
Korea (Rep. of)
,
Thailand
|
Recent development on electronic waste (e-waste) and rare metals in Asia-Pacific Telecommunity
|
Q21/5
|
|
[ 478 ]
(Rev.1) |
2012-09-20 |
Research in Motion
|
Proposed Study on environment protection and recycling solution for Li-ion and Li-ion polymer batteries for mobile phones
|
Q21/5
|
|
[ 477 ]
|
2012-09-20 |
Canada
|
Handling of TD 1169 and a proposed way forward
|
Q21/5
|
|
[ 475 ]
|
2012-09-17 |
France Télécom Orange
|
Proposal for assessment of environmental impact saving and rebound effect discussion
|
Q21/5
|
|
[ 472 ]
|
2012-03-30 |
A1 Telekom Austria AG
,
Alcatel-Lucent France
,
Belgacom
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
Deutsche Telekom AG
,
France Télécom Orange
,
Freescale Semiconductor
,
Huawei Technologies Co. Ltd.
,
Nokia Siemens Networks GmbH & Co. KG
,
Swisscom SA
,
Telecom Italia S.p.A.
,
Telefónica, S.A.
,
Verizon Communication Corporation
,
ZTE Corporation
|
Proposals towards Q21/5 Recommendation on L.adapter phase2
|
Q21/5
|
|
[ 471 ]
|
2012-03-30 |
Telecom Italia S.p.A.
|
L.adapter phase2 - proposals for electrical and mechanical characteristics
|
Q21/5
|
|
[ 470 ]
|
2012-03-30 |
Telecom Italia S.p.A.
|
L.adapter phase2 - why World needs a Common Power Supply standard now
|
Q21/5
|
|
[ 464 ]
|
2012-03-30 |
Dem. Rep. of the Congo
|
Structure of the Study on Due Diligence Guidelines for Metals Supply
|
Q21/5
|
|
[ 463 ]
|
2012-03-30 |
France Télécom Orange
|
Contribution on L.adapter Phase2 Draft Recommendation
|
Q21/5
|
|
[ 460 ]
|
2012-03-30 |
Telecom Italia S.p.A.
|
L.adapter phase2 - energy efficiency and no-load proposals
|
Q21/5
|
Results:94 total items. Result page:
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):