International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  C 

ITU-T SG05

ICT and climate change

Study Period 2009

Results:166 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
Contributions  [ Questions: Q18/5 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 519 ]  
 
2012-09-26 France Télécom Orange   L.ICT projects : some suggestions     Q18/5  
[ 514 ]  
 
2012-09-25 European Union   Contribution to Recommendation L methodology ICT Projects     Q18/5  
[ 513 ]  
 
2012-09-25 Telefónica, S.A.   Proposal for preparing a new recommendation on an agreed eco-rating scheme for mobile phones     Q18/5  
[ 512 ]  
 
2012-09-25 Telefónica, S.A.   Examples of ICT Projects in the ICT sector     Q18/5  
[ 511 ]  
 
2012-09-25 France Télécom Orange   L.ICT in cities: aspects to be covered     Q18/5  
[ 510 ]  
 
2012-09-25 Electronics and Telecommunications Research Institute (ETRI)   Proposal for validation and verification activities to ITU-T L.methodology ICT projects     Q18/5  
[ 509 ]  
 
2012-09-25 Electronics and Telecommunications Research Institute (ETRI)   Proposal for resolving some of [Editor's note] issues of ITU-T L.methodology ICT projects     Q18/5  
[ 508 ]  
 
2012-09-25 Electronics and Telecommunications Research Institute (ETRI)   Proposal for addition of project reporting guidance to ITU-T L.methodology ICT projects     Q18/5  
[ 507 ]  
 
2012-09-25 Electronics and Telecommunications Research Institute (ETRI)   Proposal for updates of project results quantification for ITU-T L.methodology ICT projects     Q18/5  
[ 506 ]  
 
2012-09-25 Electronics and Telecommunications Research Institute (ETRI)   Proposal for updates of baseline scenario considerations for ITU-T L.methodology ICT projects     Q18/5  
[ 505 ]  
 
2012-09-25 Electronics and Telecommunications Research Institute (ETRI)   Proposal for additions and updates of terms and definitions of L.methodology ICT projects     Q18/5  
[ 495 ]  
 
2012-09-25 Telefon AB - LM Ericsson   A methodological framework for assessments of ICT solutions at a city level - some considerations for L.1440     Q18/5  
[ 494 ]  
 
2012-09-25 European Union   Contribution to Recommendation ITU-T L-1410 & L-1420     Q18/5  
[ 491 ]  
 
2012-09-25 Korea (Rep. of)   Methodology for assessment of GHG emission reduction enabled by ICT based Real-time Navigation Systems     Q18/5  
[ 489 ]  
 
2012-09-25 Telefon AB - LM Ericsson   Some proposals for next draft of L.1440     Q18/5  
[ 488 ]  
 
2012-09-25 Korea (Rep. of)   A case study for assessing environmental impact by Real-time Navigation Systems in Korea     Q18/5  
[ 485 ]  
(Rev.1) 
2012-09-25 Korea (Rep. of)   Proposal for editorial and technical improvements to additionally refine ITU-T L.methodology ICT projects     Q18/5  
[ 480 ]  
 
2012-09-24 Alcatel-Lucent France   Leveraging and enhancing the ICT Environmental sustainability : Options and Priorities     Q18/5  
[ 479 ]  
 
2012-09-24 Telefon AB - LM Ericsson   Information regarding review of L.1410 (GNS) and L.1420 (ORG) performed by TENNG consortia for the EC road-testing of standards     Q18/5  
[ 469 ]  
 
2012-03-30 France Télécom Orange   Suggestions after having tested L.1420     Q18/5  
[ 468 ]  
(Rev.1) 
2012-03-30 Telefónica, S.A.   Concept of ICT Projects     Q18/5  
[ 467 ]  
(Rev.1) 
2012-03-30 Fujitsu Limited , Telefónica, S.A.   Examples of ICT Projects contributing to a Low Carbon Economy     Q18/5  
[ 465 ]  
 
2012-03-30 France Télécom Orange   Proposal to consider within SG5 the possibility to study a method to evaluate the effects on the social aspects of the ICT services     Q18/5  
[ 457 ]  
 
2012-03-30 Electronics and Telecommunications Research Institute (ETRI)   Proposal for update of Clause 13, "ICT project verifying," of L.methodology_ICT_projects     Q18/5  
[ 452 ]  
 
2012-03-30 Korea (Rep. of)   A case study report for assessment of the environmental impact of ICT services in South Korea     Q18/5  
[ 451 ]  
 
2012-03-30 Korea (Rep. of)   Methodology for assessment of GHG emission reduction enabled by ICT based Real-time Navigation Systems     Q18/5  
[ 450 ]  
 
2012-03-30 Korea (Rep. of)   Practical examples in other sectors to minimize GHG emissions in cities     Q18/5  
[ 449 ]  
 
2012-03-30 Korea (Rep. of)   Proposal for update of Clause 8, "ICT project planning," of L.methodology_ICT_projects     Q18/5  
[ 438 ]  
 
2012-03-30 United Kingdom   Proposal for adding revised text in L.methodology ICT and Cities     Q18/5  
[ 435 ]  
(Rev.1) 
2012-03-30 Telefon AB - LM Ericsson   Comments to TD801 and proposal for introduction text     Q18/5  
[ 432 ]  
 
2012-03-29 Telefon AB - LM Ericsson   Proposal on modified text for the scope section of the Recommendation L.methodology_ICT in cities     Q18/5  
[ 431 ]  
 
2012-03-29 Telefon AB - LM Ericsson   Proposed definitions for smart and sustainable cities to be used for Recommendation L.methodology_ICT in cities     Q18/5  
[ 430 ]  
 
2012-03-29 Telefon AB - LM Ericsson   The use of Recommendation L.methodology_ICT in cities to support cross-sector GHG emissions reporting of cities     Q18/5  
[ 405 ]  
 
2012-03-28 Alcatel-Lucent France , France Télécom Orange , Huawei Technologies Co. Ltd. , Nokia Siemens Networks GmbH & Co. KG , Telecom Italia S.p.A.   Leveraging and enhancing the ICT Environmental sustainability     Q23/5, Q22/5, Q21/5, Q19/5, Q18/5, Q17/5  
[ 374 ]  
(Rev.1) 
2011-09-09 Telefon AB - LM Ericsson   Selection of quantification methodologies (ORG)     Q18/5  
[ 373 ]  
 
2011-09-09 Telefon AB - LM Ericsson   Consolidation approach and organizational boundaries (ORG)     Q18/5  
[ 372 ]  
 
2011-09-09 Telefon AB - LM Ericsson   Clarification of interface between ICT organizations and ICT in organizations (ORG)     Q18/5  
[ 371 ]  
 
2011-09-09 Telefon AB - LM Ericsson   Clarification of energy concept (ORG)     Q18/5  
[ 370 ]  
 
2011-09-09 Telefon AB - LM Ericsson   Summary of comments and discussion issues for ORG     Q18/5  
[ 369 ]  
 
2011-09-09 France Telecom Orange   Proposal of new text in chapter 8.5 in ORG     Q18/5  
[ 368 ]  
 
2011-09-09 France Telecom Orange   Proposal of revised text in Part II.1 of GNS     Q18/5  
[ 367 ]  
 
2011-09-09 European Union   Contribution to Draft Recommendation ITU-T L.methodology_ICT goods, networks     Q18/5  
[ 366 ]  
 
2011-09-09 European Union   Draft Recommendation ITU-T L.methodology_ICT goods, networks and services     Q18/5  
[ 365 ]  
 
2011-09-09 ETRI   Proposal for adding third-order effects evaluation to Clause 7 of ITU-T L.ORG     Q18/5  
[ 363 ]  
 
2011-09-09 ETRI   Editorial improvements for draft Recommendation ITU-T L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     Q18/5  
[ 362 ]  
 
2011-09-09 GSM Association   Suggested additions to Appendix Z of the GNS document     Q18/5  
[ 361 ]  
 
2011-09-09 GSM Association   Suggested appendices to ORG document     Q18/5  
[ 359 ]  
 
2011-09-09 Alcatel Lucent   Texts moved in ORG to increase consistency     Q18/5  
[ 358 ]  
 
2011-09-09 Alacatel Lucent , France Telecom Orange   Reporting Requirements for scopes 1 and 2 in ORG     Q18/5  
[ 357 ]  
 
2011-09-09 Telefónica SA , RIM , Verizon   Proposed new work item: Tool to assess environmental & sustainability features of mobile phones     Q18/5  
Results:166 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-9-26