Contributions  |
|
Number
|
Received
|
Source
|
Title
|
Questions
|
|
[ 473 ]
(Rev.1) |
2012-03-30 |
Brazil
|
Characterization of Base Stations RF Exposure - Examples of Measurements
|
Q3/5
|
|
[ 472 ]
|
2012-03-30 |
A1 Telekom Austria AG
,
Alcatel-Lucent France
,
Belgacom
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
Deutsche Telekom AG
,
France Télécom Orange
,
Freescale Semiconductor
,
Huawei Technologies Co. Ltd.
,
Nokia Siemens Networks GmbH & Co. KG
,
Swisscom SA
,
Telecom Italia S.p.A.
,
Telefónica, S.A.
,
Verizon Communication Corporation
,
ZTE Corporation
|
Proposals towards Q21/5 Recommendation on L.adapter phase2
|
Q21/5
|
|
[ 471 ]
|
2012-03-30 |
Telecom Italia S.p.A.
|
L.adapter phase2 - proposals for electrical and mechanical characteristics
|
Q21/5
|
|
[ 470 ]
|
2012-03-30 |
Telecom Italia S.p.A.
|
L.adapter phase2 - why World needs a Common Power Supply standard now
|
Q21/5
|
|
[ 469 ]
|
2012-03-30 |
France Télécom Orange
|
Suggestions after having tested L.1420
|
Q18/5
|
|
[ 468 ]
(Rev.1) |
2012-03-30 |
Telefónica, S.A.
|
Concept of ICT Projects
|
Q18/5
|
|
[ 467 ]
(Rev.1) |
2012-03-30 |
Fujitsu Limited
,
Telefónica, S.A.
|
Examples of ICT Projects contributing to a Low Carbon Economy
|
Q18/5
|
|
[ 466 ]
|
2012-03-30 |
Juniper Networks
|
Comments to draft L.M&M
|
Q17/5
|
|
[ 465 ]
|
2012-03-30 |
France Télécom Orange
|
Proposal to consider within SG5 the possibility to study a method to evaluate the effects on the social aspects of the ICT services
|
Q18/5
|
|
[ 464 ]
|
2012-03-30 |
Dem. Rep. of the Congo
|
Structure of the Study on Due Diligence Guidelines for Metals Supply
|
Q21/5
|
|
[ 463 ]
|
2012-03-30 |
France Télécom Orange
|
Contribution on L.adapter Phase2 Draft Recommendation
|
Q21/5
|
|
[ 462 ]
|
2012-03-30 |
Nippon Telegraph and Telephone Corporation (NTT)
|
Proposal of withdrawal of recommendation L.safePowerfeed
|
Q19/5
|
|
[ 461 ]
(Rev.1) |
2012-03-30 |
Nippon Telegraph and Telephone Corporation (NTT)
,
France Telecom Orange
|
Proposal of DC interface requirement and draft text of L.spec DC
|
Q19/5
|
|
[ 460 ]
|
2012-03-30 |
Telecom Italia S.p.A.
|
L.adapter phase2 - energy efficiency and no-load proposals
|
Q21/5
|
|
[ 459 ]
|
2012-03-30 |
Telecom Italia S.p.A.
|
L.adapter phase2 - efficiency versus load and equipment behaviour
|
Q21/5
|
|
[ 458 ]
|
2012-03-30 |
Telecom Italia S.p.A.
|
L.adapter phase2 - considerations on failures on present power supplies
|
Q21/5
|
|
[ 457 ]
|
2012-03-30 |
Electronics and Telecommunications Research Institute (ETRI)
|
Proposal for update of Clause 13, "ICT project verifying," of L.methodology_ICT_projects
|
Q18/5
|
|
[ 456 ]
|
2012-03-30 |
N/A
|
withdrawn
|
N/A
|
|
[ 455 ]
|
2012-03-30 |
Korea (Rep. of)
|
Brief summary of IEC 62368-1
|
Q11/5
|
|
[ 454 ]
|
2012-03-30 |
Korea (Rep. of)
|
Suggestion to add IEC 60950-22 and IEC 60950-23 into references in the recommendation K.51
|
Q11/5
|
|
[ 453 ]
|
2012-03-30 |
Korea (Rep. of)
|
Introduction of VDR requirement in IEC 60950-1
|
Q11/5
|
|
[ 452 ]
|
2012-03-30 |
Korea (Rep. of)
|
A case study report for assessment of the environmental impact of ICT services in South Korea
|
Q18/5
|
|
[ 451 ]
|
2012-03-30 |
Korea (Rep. of)
|
Methodology for assessment of GHG emission reduction enabled by ICT based Real-time Navigation Systems
|
Q18/5
|
|
[ 450 ]
|
2012-03-30 |
Korea (Rep. of)
|
Practical examples in other sectors to minimize GHG emissions in cities
|
Q18/5
|
|
[ 449 ]
|
2012-03-30 |
Korea (Rep. of)
|
Proposal for update of Clause 8, "ICT project planning," of L.methodology_ICT_projects
|
Q18/5
|
Results:520 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):