International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  C 

ITU-T SG05

ICT and climate change

Study Period 2009

Results:520 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 120 ]  
 
2010-03-30 Korea (Republic of)   Considerations for Proposed input to SG5 Recommendations on 'Data Center Energy Efficiency'     Q19/5  
[ 119 ]  
 
2010-03-30 ATIS   Presentation on the TEER Standards Supporting Transmittal of Documents from ATIS Committee STEP-TEE on "Energy Efficiency for Telecommunications Equipment: Methodology for Measurement and Reporting"     Q20/5, Q19/5, Q18/5, Q17/5  
[ 118 ]  
 
2010-03-30 NTT   Electromagnetic disturbance waves enter Ethernet ports in customer telecommunication equipment     Q8/5  
[ 117 ]  
 
2010-03-30 KT   Decision of nominal voltage based on compatibility requirements     Q19/5  
[ 116 ]  
 
2010-03-30 Telekomunikacja Polska   Working document toward draft new Recommendation K.guide     Q3/5  
[ 115 ]  
 
2010-03-30 China Mobile Communications Corporation   Additional supplement of smart antennas calculation for K.guide     Q3/5  
[ 114 ]  
 
2010-03-30 Japan   Proposal of evaluation of environmental impact for office space     Q18/5  
[ 113 ]  
 
2010-03-30 Japan   Proposed Introduction and Scope for L.methodology_umbrella     Q18/5  
[ 112 ]  
 
2010-03-30 Alcatel Lucent   Progress Report on the EARTH Project     Q18/5, Q17/5  
[ 111 ]  
 
2010-03-30 Alcatel Lucent   Network equipment to be covered     Q18/5  
[ 110 ]  
 
2010-03-30 Bourns   External coaxial cable port test proposal     Q4/5  
[ 109 ]  
 
2010-03-30 IEEE   Ethernet Field experiences     Q4/5  
[ 108 ]  
 
2010-03-30 IEEE   Recommendations K.20, K.21 and K.45 - Power Contact Test Proposals     Q4/5  
[ 107 ]  
 
2010-03-30 France Telecom Orange   Higher Voltage DC     Q19/5  
[ 106 ]  
 
2010-03-30 France Telecom Orange   ICT environmental impact model     Q21/5  
[ 105 ]  
 
2010-03-30 France Telecom Orange   Scope of Phase 2 of Universal power adapter and charger solution for mobile terminals and other ICT devices     Q21/5  
[ 104 ]  
 
2010-03-26 ZTE Corporation   The impact of voltage ramp on DC powered telecommunication equipment start-up     Q12/5  
[ 103 ]  
(Rev.1) 
2010-03-26 ZTE Corporation   Strengthening the refined research for the Energy Efficiency Rating of transport equipment     Q18/5  
[ 102 ]  
 
2010-03-26 ATIS   Transmittal of Documents from ATIS Committee STEP-TEE on "Energy Efficiency for Telecommunications Equipment: Methodology for Measurement and Reporting"     Q20/5, Q19/5, Q18/5, Q17/5  
[ 101 ]  
 
2010-03-16 France Telecom Orange   Using data of lightning positioning system for network protection, recovery services or diagnosis by hotline services     Q5/5  
[ 100 ]  
 
2010-01-15 UK   Proposed Endorsement of "Specification for the reuse of Waste Electrical and Electronic Equipment (WEEE) and used Electrical and Electronic Equipment (EEE)" in an ITU-T Recommendation  
document withdrawn
 
Q21/5, Q20/5, Q19/5, Q18/5, Q17/5  
[ 99 ]  
 
2010-01-15 Telecom Italia, BT and UK   Proposed input to SG5 Recommendations on 'Data Centre Energy Efficiency'     Q21/5, Q20/5, Q19/5, Q18/5, Q17/5  
[ 98 ]  
 
2010-01-15 Telecom Italia, UK   Proposed New Recommendation on 'In-Use and Standby Power Saving Requirements for Broadband Equipment'     Q21/5, Q20/5, Q19/5, Q18/5, Q17/5  
[ 97 ]  
 
2010-01-15 UK   Proposed Endorsement of IEEE 1680 environmental performance criteria for electronic products as ITU-T Recommendations     Q21/5, Q20/5, Q19/5, Q18/5, Q17/5  
[ 96 ]  
 
2010-01-11 KT   Considerations for determination the value of the Nominal voltage in the draft recommendation L.specHVDC     Q19/5  
[ 95 ]  
 
2010-01-11 China   Output current proposal for L.1000 (L.adapter)     Q21/5  
[ 94 ]  
 
2010-01-11 ETRI   Simple evaluation models for USN applications and services     Q18/5  
[ 93 ]  
 
2010-01-11 France Telecom Orange   Modular method to assess positive and negative impacts     Q18/5  
[ 92 ]  
 
2010-01-11 NTT   Proposed Specifications of Power Feeding Systems     Q19/5  
[ 91 ]  
 
2010-01-11 Telefon AB - LM Ericsson   Proposed Outline of L.methodology_ICT Goods and Services Document     Q18/5  
[ 90 ]  
 
2010-01-11 Alcatel Lucent   Presentation of the Earth Project     QALL/5  
[ 89 ]  
 
2010-01-08 Federal Republic of Germany   Eco-management guidance of ICT equipment     Q18/5  
[ 88 ]  
 
2010-01-08 ETRI   Proposal for use of "ICT products" instead of "ICT goods and services" for L.methodology_ICT_goods and services     Q18/5  
[ 87 ]  
 
2010-01-08 Japan   Proposed Methodology for Evaluating Environmental Load of Network Infrastructure     Q18/5  
[ 86 ]  
 
2010-01-08 Republic of Korea   Proposal of a new draft Recommendation on a method to provide recycling information of rare metals in ICT products     Q21/5  
[ 85 ]  
 
2010-01-08 Republic of Korea   Clarification for the work scope of L.methodology_ICT_in_organizations     Q18/5  
[ 84 ]  
 
2010-01-08 Republic of Korea   Proposal for the initial draft Recommendation of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     Q18/5  
[ 83 ]  
 
2010-01-08 Republic of Korea   Compliance with existing standards for L.methodology_ICT_projects     Q18/5  
[ 82 ]  
 
2010-01-08 Republic of Korea   Proposal for the scope of L.methodology_ICT_projects     Q18/5  
[ 81 ]  
 
2010-01-08 Republic of Korea   Proposal for the coverage of L.methodology_ICT_projects for various environmental issues     Q18/5  
[ 80 ]  
 
2010-01-08 ETRI   Status update for ISO/IEC JTC 1 Green ICT standardization activities     Q17/5  
[ 79 ]  
 
2010-01-08 ETRI   Information and proposal for clarification on the ICT sector     Q18/5  
[ 78 ]  
 
2010-01-08 ETRI   Proposal for clarification on the ICT sector     Q18/5  
[ 77 ]  
 
2010-01-05 Ministry PTT Dem. Rep. Congo   Environment and climate change     Q17/5  
[ 76 ]  
 
2009-10-02 IEEE   GDT Self-Oscillation     Q4/5, Q13/5  
[ 75 ]  
 
2009-10-02 Juniper Networks   Reference Model for Recurring GHG Footprint of ICT equipment     Q21/5, Q20/5, Q19/5, Q18/5, Q17/5  
[ 74 ]  
 
2009-10-02 Telefon AB - LM Ericsson   Method for Assessing Potential Carbon Dioxide Equivalent Emission Reduction of ICT Services     Q18/5  
[ 73 ]  
 
2009-10-02 Telefon AB - LM Ericsson   ICT Specific Life Cycle Assessment for Products and Systems     Q18/5  
[ 72 ]  
 
2009-10-02 NTT   Proposal of Study Items Related to Specifications of Power Feeding Systems     Q19/5  
[ 71 ]  
 
2009-10-02 France Telecom Orange and SNCF   Experimentation performed by FT and SNCF on ADSL disturbances created by the passage of trains     Q9/5  
Results:520 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-27