International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  C 

ITU-T SG05

ICT and climate change

Study Period 2009

Results:520 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 170 ]  
 
2010-11-11 China   EMC and Safety study and proposal for L.adapterPhase2 draft     Q21/5  
[ 169 ]  
 
2010-11-11 China   Proposal on output power range classification for L.adapterPhase2 draft     Q21/5  
[ 168 ]  
 
2010-11-11 China   Proposal to establish a new work item on Universal Li-ion battery solution for mobile phone and other ICT device     Q21/5  
[ 167 ]  
 
2010-11-11 China   Proposed structure for recommendation L.metrics (energy efficiency metrics for telecommunication equipment)     Q17/5  
[ 166 ]  
 
2010-11-11 China   Propose a new Recommendation on telecommunication terminal equipment EMC     Q16/5  
[ 165 ]  
 
2010-11-11 China   Mutual-disturbance Test Requirements for Performance Degradation Evaluation of Converged Terminal Devices     Q16/5  
[ 164 ]  
 
2010-11-11 ETRI   Proposal for update of Clause 8.2.5 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     Q18/5  
[ 163 ]  
 
2010-11-11 ETRI   Discussion and proposal for Clause 9, "ICT project validating," of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     Q18/5  
[ 162 ]  
 
2010-11-11 ETRI   Proposal for update of Clause 8 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     Q18/5  
[ 161 ]  
 
2010-11-11 Telecom Italia , Huawei   Draft skeleton of new Recommendation L.DC     Q17/5  
[ 160 ]  
 
2010-11-11 Telecom Italia , Huawei   First Draft of new Recommendation L. metrics     Q17/5  
[ 159 ]  
 
2010-11-09 NICT   Effect of RBWs on measured electromagnetic fields from mobile phone base station     Q3/5  
[ 158 ]  
 
2010-11-09 NTT DoCoMo, Inc.   Method for evaluating electromagnetic field in general public environment with wide frequency radio spectrum     Q3/5  
[ 157 ]  
 
2010-11-09 Huawei Technologies   System boundaries for ICT Goods (7.2.2.2)     Q18/5  
[ 156 ]  
 
2010-11-08 Telekomunikacja Polska   Updated version of the software EMF-estimator (v 1.4.0)     Q3/5  
[ 155 ]  
 
2010-11-04 Alcatel-Lucent   Re-allocation of deliverables currently under Q17/5     Q20/5, Q18/5, Q17/5  
[ 154 ]  
 
2010-11-04 China Telecom Corp.   Measurement and analysis of electromagnetic disturbance from in-house BPL     Q8/5  
[ 153 ]  
 
2010-11-04 Ministry PTT Dem. Rep. Congo   Environment and climate change     Q17/5  
[ 152 ]  
 
2010-10-26 Telekomunikacja Polska, Poland   Preliminary Draft New Recommendation K.monitor     Q3/5  
[ 151 ]  
 
2010-10-25 N/A   Document withdrawn  
Pls see TD 517 (GEN/5)
 
N/A  
[ 150 ]  
 
2010-10-25 N/A   Document withdrawn  
Pls see TD 518 (GEN/5)
 
N/A  
[ 149 ]  
 
2010-09-23 Tyco Electronics , EPCOS AG   New chapter for draft new Recommendation ITU-T K.appl     Q13/5  
[ 148 ]  
 
2010-09-14 UK   Proposal for a new Work Item Methodology to evaluate the GHG Impact of ICT in Cities     Q18/5  
[ 147 ]  
 
2010-07-22 Tyco Electronics   A discussion of external coaxial cable port shield leakage     Q4/5  
[ 146 ]  
 
2010-07-02 Tyco Electronics   Proposal for the Polymeric PTC section of K.appl     Q13/5  
[ 145 ]  
 
2010-04-01 Ministère des PTT Rép Dém Congo   Contribution sur l'Environnement et le changement climatique     Q17/5  
[ 144 ]  
 
2010-03-30 NTT   Proposal of nominal voltage and voltage range of the Power feeding systems     Q19/5  
[ 143 ]  
 
2010-03-30 ETRI   Developing the contents of a ICT-GSCR document     Q18/5  
[ 142 ]  
 
2010-03-30 France Telecom Orange   Proposed skeleton for L_methodology_general umbrella - Proposed skeleton with some proposed text inputs     Q18/5  
[ 141 ]  
 
2010-03-30 France Telecom Orange , Technicolor   Resistibility Guide     Q4/5  
[ 140 ]  
 
2010-03-30 ANATEL   Some remarks regarding K.guide     Q3/5  
[ 139 ]  
 
2010-03-30 Telefon AB - LM Ericsson   Proposal on Reporting Format for L_Methodology ICT Goods and Services     Q18/5  
[ 138 ]  
 
2010-03-30 Telefon AB - LM Ericsson   Proposal on Product System Categories to be Reflected in Structure of L_Methodology ICT Goods and Services     Q18/5  
[ 137 ]  
 
2010-03-30 Telefon AB - LM Ericsson   Proposal on Modified Ways of Working for L_methodology ICT Goods and Services     Q18/5  
[ 136 ]  
 
2010-03-30 Telefon AB - LM Ericsson   Proposal on Definitions of High Level Life Cycle Phases     Q18/5  
[ 135 ]  
 
2010-03-30 ETRI   Proposal for the ICT sector definition     Q18/5  
[ 134 ]  
 
2010-03-30 Korea (Republic of)   Proposal for clarification of main issues to be included and discussed in the guidance of L.methodology_ICT_in_organizations     Q18/5  
[ 133 ]  
 
2010-03-30 Korea (Republic of)   Proposal of text structure for L.rareMetals     Q21/5  
[ 132 ]  
 
2010-03-30 Korea (Republic of)   International activities related to recycling of rare metals     Q21/5  
[ 131 ]  
 
2010-03-30 Korea (Republic of)   Discussion about the scope of L.rareMetals     Q21/5  
[ 130 ]  
 
2010-03-30 Korea (Republic of)   Follow-up comment and consideration of power system configuration after the submitted opinions for K.56 AAP     Q5/5  
[ 129 ]  
 
2010-03-30 Korea (Republic of)   Proposals for update of Clause 7 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     Q18/5  
[ 128 ]  
 
2010-03-30 Korea (Republic of)   Proposal for update of Clauses 3, 4 and 6 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     Q18/5  
[ 127 ]  
 
2010-03-30 Korea (Republic of)   Proposal for clarification of the work scope of L.methodology_ICT_in_organizations     Q18/5  
[ 126 ]  
 
2010-03-30 Korea (Republic of)   Proposal for the scope of L.methodology_ICT_in_organizations     Q18/5  
[ 125 ]  
 
2010-03-30 Korea (Republic of)   Considerations for Title correction of draft recommendation L.specHVDC     Q19/5  
[ 124 ]  
 
2010-03-30 Korea (Republic of)   Induced voltage measured at one end of a conductor when the other end of that conductor is earthed closely to the high-speed electrified railway     Q9/5  
[ 123 ]  
 
2010-03-30 Korea (Republic of)   Consideration of nominal voltage decision DC 300V     Q19/5  
[ 122 ]  
 
2010-03-30 Korea (Republic of)   Introduction of safety requirement for surge suppressors in audio/video, information and communication technology equipments     Q11/5  
[ 121 ]  
 
2010-03-30 Korea (Republic of)   Proposal for complementary input on '2010 Best Practices for the EU Code of Conduct on Data Centres'     Q19/5  
Results:520 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-27